Section B - Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Section B - SOI.pdf | ||
| SF 30 Amendment 1.pdf | ||
| Revised Attachment 1- SOW Specs.pdf | ||
| Revised - Exhibit 5 Viewing Platform 2.pdf | ||
| Revised - Exhibit 3 - Trail Log .pdf | ||
| Attachment 1 - Specifications SOW.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section C thru M - Solicitation.doc | DOC document | |
| Exhibit 4 - Design Parameters.pdf | ||
| Exhibit 2 - Map.pdf | ||
| Exhibit 3 - Trail Log.pdf | ||
| Section A - SF1442.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid Optional Item
ITEM DESCRIPTION Units Unit Price Qty. Qty.
Existing trail restoration on main and side trails; including benching, de-berming, outsloping, restoring positive drainage, cleaning & maintenance of exist. drainage structures & installation of new drainage structures (grade dips, drainage ditches, etc.), obliteration, switchback improvements, stump & root removal, etc.
Mile 0.7 0.7
Add aggregate surfacing/fill where shown in trail log. (Note: This item does not include surfacing or fill material for observation platforms.)
SF 2145 0
Fell hazard trees, brush-out & log-out main trail, side trails & observations platform surrounding areas
Mile 0.7 0.7
Replace/install cribbing & retaining walls per drawings and specifications (Note: This item does not include cribbing or retaining walls shown in viewing platform drawings.)
SF 1491 532
Replace/install steps or terraced steps per trail log Each 224 76
Demolish & dispose of existing observation platform elements; install four new observation platforms per drawings & specifications.
Each 4 0
TOTAL BASE BID
TOTAL OPTIONAL ITEM BID
TOTAL BID AMOUNT (BASE + OPTIONAL ITEM)
Contractor shall start work as soon as possible after award is made and no later than 9/30/2010.
Bidders must provide prices on all items to be considered for award. One award will be made for this solicitation.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.
Payment for such work is indirectly included under other pay items shown in the bid schedule.
SCHEDULE OF ITEMS CIM-0811-04T Package 12A
Glen Falls Trail-northern section (Sta. 0+00 to Sta.
34+24), side trails & Observation Platforms
Glen Falls Trail-southern section (Sta. 34+24 to Sta.
66+79), & side trails