Base Bid Optional Item

ITEM DESCRIPTION Units Unit Price Qty. Qty.

Existing trail restoration on main and side trails; including benching, de-berming, outsloping, restoring positive drainage, cleaning & maintenance of exist. drainage structures & installation of new drainage structures (grade dips, drainage ditches, etc.), obliteration, switchback improvements, stump & root removal, etc.

Mile 0.7 0.7

Add aggregate surfacing/fill where shown in trail log. (Note: This item does not include surfacing or fill material for observation platforms.)

SF 2145 0

Fell hazard trees, brush-out & log-out main trail, side trails & observations platform surrounding areas

Mile 0.7 0.7

Replace/install cribbing & retaining walls per drawings and specifications (Note: This item does not include cribbing or retaining walls shown in viewing platform drawings.)

SF 1491 532

Replace/install steps or terraced steps per trail log Each 224 76

Demolish & dispose of existing observation platform elements; install four new observation platforms per drawings & specifications.

Each 4 0

TOTAL BASE BID

TOTAL OPTIONAL ITEM BID

TOTAL BID AMOUNT (BASE + OPTIONAL ITEM)

Contractor shall start work as soon as possible after award is made and no later than 9/30/2010.

Bidders must provide prices on all items to be considered for award. One award will be made for this solicitation.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule.

SCHEDULE OF ITEMS CIM-0811-04T Package 12A

Glen Falls Trail-northern section (Sta. 0+00 to Sta.

34+24), side trails & Observation Platforms

Glen Falls Trail-southern section (Sta. 34+24 to Sta.

66+79), & side trails