Revised Section B - SOI.pdf

PDF 58 KB Posted

Attached to
RECOVERY* Glen Falls Trail reconstruction, Nantahala National Forest, North Carolina
Solicitation number
AG-4419-S-10-0754
Issued by

About this file

Revised Section B - Schedule of items

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid Optional Items

ITEM DESCRIPTION Units Unit Price Qty. Qty. Qty. Qty.

Existing trail restoration on main and side trails; including benching, de-berming, outsloping, restoring positive drainage, cleaning & maintenance of exist. drainage structures & installation of new drainage structures (grade dips, drainage ditches, etc.), obliteration, switchback improvements, stump & root removal, etc.

Mile 0.7 0.7 0 0.07

Brushing out main trail, side trails & observation platforms surrounding areas

Mile 0.7 0.7 0 0.07

Backfill for trail steps, cribwalls, and for tread restoration (Note: This item does not include backfill material for observation platforms.)

CY 80 20 0 0

Replace/install cribbing & retaining walls per drawings and specifications (Note: This item does not include cribbing or retaining walls shown in observation platform drawings.)

SF 1150 532 0 0

Replace/install steps or terraced steps per trail log Each 206 59 0 0

Observation Platform 1: Demolish & dispose of existing observation platform elements; install new observation platform, including fill/surfacing for platform, per drawings & specifications.

Each 1 0 0 0

Observation Platform 2: Demolish & dispose of existing observation platform elements; install new observation platform, including fill/surfacing for platform, per drawings & specifications.

Each 1 0 0 0

Observation Platform 3: Demolish & dispose of existing observation platform elements; install new observation platform, including fill/surfacing for platform, per drawings & specifications.

Each 1 0 0 0

Observation Platform 4: Install new observation platform, including fill/surfacing for platform, per drawings & specifications.

Each 0 0 1 0

TOTAL BASE BID

TOTAL OPTIONAL ITEM BID

TOTAL BID AMOUNT (BASE + OPTIONAL ITEM)

Contractor shall start work as soon as possible after award is made and no later than 9/30/2010.

Bidders must provide prices on all items to be considered for award. One award will be made for this solicitation.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule.

This Schedule of Items has been revised per Solicitation Amendment 1

SCHEDULE OF ITEMS CIM-0811-04T Package 12A

Glen Falls Trail-northern section (Sta. 0+00 to Sta.

34+24), side trails & 3 Observation Platforms

Glen Falls Trail-southern section

(Sta. 34+24 to Sta.

66+79)

Observation Platform #4

Side trail to Swimming Hole, Sta.

41+65

Sheet1

File details come from the government source that posted it. Updated .