Section B-5 - Sched of Items Rocky Mtn rev.xls

XLS spreadsheet 26 KB Posted

Attached to
RECOVERY* Trail Maintenance, Uwharrie National Forest
Solicitation number
AG-4419-S-10-0586
Issued by

About this file

Section B-5 - Schedule of items - Rocky Mountain Trail

View the file

Other files

File Type Posted
Exhibit 3 - Trail Logs Combined.pdf PDF
Exhibit 1 - Drawings.pdf PDF
Exhibit 4 - Design Parameters.pdf PDF
Section B-2 - Sched of Items Falls Dam rev.xlsx XLSX spreadsheet
Exhibit 2 - Maps.pdf PDF
Section B-6 - Sched of Items - Todd rev.xlsx XLSX spreadsheet
Section B-4 - Sched of Items River rev.xlsx XLSX spreadsheet
Attachment 1 - Specifications.doc DOC document
Section B-1 - Sched of Items - Summation .xlsx XLSX spreadsheet
Sections C thru M - Solicitation.doc DOC document
Section A - SF1449 Solicitation.pdf PDF
Attachment 2 - Wage Determination.doc DOC document
Section B-3 - Sched of Items Morgan rev.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS - Rocky Mtn. Loop OHV Trail
Trails Maintenance Package 10 - Uwharrie National Forest
Please transfer trail subtotal to Schedule of Items - Cover Page
DESCRIPTIONUnitQtyUNIT PRICETotal Rocky Mtn. Loop Trail
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, establishing positive drainage, trail obliterationMile2.8
Hazard tree removalMile2.8
Install Armored water crossings (each water crossing includes armoring of both approaches)Each2
Install Turnpike / Causeway / Fill / Surfacing (incl. Special Resource Protection Armoring as required)Mile1.5
Culvert InstallationsEach1
BID AMOUNT PER TRAIL - SUBTOTAL
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard
per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.
Payment for such work is indirectly included under other pay items shown in the bid