Section B-2 - Sched of Items Falls Dam rev.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- AG-4419-S-10-0586
About this file
Section B-2 - Schedule of items - Falls Dam Trail
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 3 - Trail Logs Combined.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Exhibit 4 - Design Parameters.pdf | ||
| Exhibit 2 - Maps.pdf | ||
| Section B-6 - Sched of Items - Todd rev.xlsx | XLSX spreadsheet | |
| Section B-4 - Sched of Items River rev.xlsx | XLSX spreadsheet | |
| Attachment 1 - Specifications.doc | DOC document | |
| Section B-1 - Sched of Items - Summation .xlsx | XLSX spreadsheet | |
| Section B-5 - Sched of Items Rocky Mtn rev.xls | XLS spreadsheet | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Section A - SF1449 Solicitation.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section B-3 - Sched of Items Morgan rev.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF ITEMS - Falls Dam OHV Trail | |||||
| Trails Maintenance Package 10 - Uwharrie National Forest | |||||
| Please transfer trail subtotals to Schedule of Items - Cover Page | |||||
| UNIT | Quantity | UNIT | Total | Total Optional Item | |
| PRICE | Falls Dam Trail | Segment Falls Dam Trl | |||
| DESCRIPTION | 1.8 Mile | Sta. 81+93 to Sta. 83+51 | |||
| Trail restoration, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, establish positive drainage, trail obliteration, clearing as necessary. | Mile | 1.8 | |||
| Install Compacted Fill / Surfacing / Armoring with Geo-grid/Riprap / Hardening of Tread | Mile | 1.8 | |||
| Install Armored water crossings w/geogrid, riprap installation (each water crossing includes armoring of both approaches) | Each | 3 | |||
| New Culvert Installation and/or Removal / Replacement of Existing | Each | 3 | |||
| Establish one stable OHV trail , moderate difficulty level, re-establish positive drainage. Contractor to propose methods, materials, design. | LF | 160 |
ktmoore: ktmoore:
BASE BID AMOUNT - SUBTOTAL
ktmoore: ktmoore:
TOTAL BID AMOUNT PER TRAIL (BASE & OPTIONAL ITEM BID)
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
| Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard |
| per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails. |
| All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule. |
| Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor. |
| Payment for such work is indirectly included under other pay items shown in the bid |