Section B-3 - Schedule of items - Morgan Trail

View the file

Other files

File Type Posted
Exhibit 3 - Trail Logs Combined.pdf PDF
Exhibit 1 - Drawings.pdf PDF
Exhibit 4 - Design Parameters.pdf PDF
Section B-2 - Sched of Items Falls Dam rev.xlsx XLSX spreadsheet
Exhibit 2 - Maps.pdf PDF
Section B-6 - Sched of Items - Todd rev.xlsx XLSX spreadsheet
Section B-4 - Sched of Items River rev.xlsx XLSX spreadsheet
Attachment 1 - Specifications.doc DOC document
Section B-1 - Sched of Items - Summation .xlsx XLSX spreadsheet
Section B-5 - Sched of Items Rocky Mtn rev.xls XLS spreadsheet
Sections C thru M - Solicitation.doc DOC document
Section A - SF1449 Solicitation.pdf PDF
Attachment 2 - Wage Determination.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS - Morgan Trail
Trails Maintenance Package 10 - Uwharrie National Forest
Please transfer trail subtotals to Schedule of Items - Cover Page
TotalTotal Optional Item
Morgan TrailSegment Morgan Trl
DESCRIPTIONUNITQTYUnit Price1.6 MileSta. 86+70 to 89+15
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration, puncheon removalMile1.6
Hazard tree removalMile1.6
Installation of Turnpike Type 1 and Type 2Mile1.6
Install Armored water crossings (each water crossing includes armoring of both approaches)Each8
Establish one stable trail , re-establish positive drainage. Contractor to propose methods, materials, design for a difficult area to repair/maintain.LF245

ktmoore: ktmoore:

BASE BID AMOUNT - SUBTOTAL

ktmoore: ktmoore:

OPTIONAL ITEM AMOUNT-SUBTOTAL

TOTAL BID AMOUNT PER TRAIL (BASE & OPTIONAL ITEM BID)

Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard
per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.
Payment for such work is indirectly included under other pay items shown in the bid