Section B-3 - Sched of Items Morgan rev.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- AG-4419-S-10-0586
About this file
Section B-3 - Schedule of items - Morgan Trail
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 3 - Trail Logs Combined.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Exhibit 4 - Design Parameters.pdf | ||
| Section B-2 - Sched of Items Falls Dam rev.xlsx | XLSX spreadsheet | |
| Exhibit 2 - Maps.pdf | ||
| Section B-6 - Sched of Items - Todd rev.xlsx | XLSX spreadsheet | |
| Section B-4 - Sched of Items River rev.xlsx | XLSX spreadsheet | |
| Attachment 1 - Specifications.doc | DOC document | |
| Section B-1 - Sched of Items - Summation .xlsx | XLSX spreadsheet | |
| Section B-5 - Sched of Items Rocky Mtn rev.xls | XLS spreadsheet | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Section A - SF1449 Solicitation.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF ITEMS - Morgan Trail | |||||
| Trails Maintenance Package 10 - Uwharrie National Forest | |||||
| Please transfer trail subtotals to Schedule of Items - Cover Page | |||||
| Total | Total Optional Item | ||||
| Morgan Trail | Segment Morgan Trl | ||||
| DESCRIPTION | UNIT | QTY | Unit Price | 1.6 Mile | Sta. 86+70 to 89+15 |
| Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration, puncheon removal | Mile | 1.6 | |||
| Hazard tree removal | Mile | 1.6 | |||
| Installation of Turnpike Type 1 and Type 2 | Mile | 1.6 | |||
| Install Armored water crossings (each water crossing includes armoring of both approaches) | Each | 8 | |||
| Establish one stable trail , re-establish positive drainage. Contractor to propose methods, materials, design for a difficult area to repair/maintain. | LF | 245 |
ktmoore: ktmoore:
BASE BID AMOUNT - SUBTOTAL
ktmoore: ktmoore:
OPTIONAL ITEM AMOUNT-SUBTOTAL
TOTAL BID AMOUNT PER TRAIL (BASE & OPTIONAL ITEM BID)
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
| Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard |
| per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails. |
| All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule. |
| Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor. |
| Payment for such work is indirectly included under other pay items shown in the bid |