4/29/2010
ITEM NO. DESCRIPTION
METHOD OF
MEASUREMENT
UNIT QUANTITY UNIT PRICE TOTALS
15101 Mobilization LS
LS
1.00
15201 Construction staking and surveying, Slope Staking, Method I, Tolerance B
LS
LS
1.00
15702 Silt Fence AQ
LF
7220.00
15707 Hay Bales AQ EA 136.00
20101 Clearing and Grubbing CQ AC 10.90
20301 Removal of Culverts AQ EA 12.00
20419 Drainage excavation, Ditch construction
AQ Foot 10551.00
20426a Rolling Dip Construction AQ Each 16.00
20503 Blasting LS LS 1.00
21201 Linear Grading CQ Mile 6.10
25102 Placed Riprap, Class B AQ Ton 56.00
30109a Aggregate surface course, NCDOT ABC, Compaction Method A AQ Ton 2282.00
30109b Aggregate surface course, Railroad Ballast, Compaction Method A AQ Ton 1136.00
30301 Road Recondioning CQ Mile 6.10
60201A 24-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, backfill compaction method b
AQ LF 430.00
60201B 12' x 5' Open Bottom Structural Plate Arch including footings, headwalls and object markers
AQ LF 50.00
60201C 14' x 6' Open Bottom Structural Plate Arch including footings, headwalls and object markers
AQ LF 60.00
62501 Seeding, Dry or Hydraullic Method CQ AC 7.00
63501 Temporary Traffic Control LS LS 1.00
65001 Install Road Closure Gate AQ EA 1.00
As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. All quantities are Actual Quantities unless specifically designated as a Contract Quantity by "CQ"
Schedule of Items, Rev. 1 (Upper Tellico Roads Reconditioning)
BASE BID TOTAL:
Base Bid Items
4/29/2010
ITEM NO. DESCRIPTION
METHOD OF
MEASUREMENT
UNIT QUANTITY UNIT PRICE TOTALS
15702 Silt Fence AQ LF 2300.00
15707 Hay Bales AQ EA 280.00
20101 Clearing and Grubbing CQ AC 3.00
20301 Removal of Culverts AQ EA 4.00
20419 Drainage excavation, Ditch construction
AQ Foot 13526.00
20426a Rolling Dip Construction AQ Each 40.00
20426b Rolling Dip Reconstruction CQ Each 30.00
20426c Water Bar Construction AQ Each 25.00
20426d Sediment Trap Construction AQ Each 25.00
21103 Roadway Obliteration, Method 2 CQ Mile 1.00
21201 Linear Grading CQ Mile 2.60
25102 Placed Riprap, Class B AQ Ton 16.00
30109a Aggregate surface course, NCDOT ABC, Compaction Method A AQ Ton 64.00
30109b Aggregate surface course, Railroad Ballast, Compaction Method A AQ Ton 1408.00
30301 Road Recondioning CQ Mile 2.00
60201A 24-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, backfill compaction method b
AQ LF 120.00
62501 Seeding, Dry or Hydraullic Method CQ AC 7.00
65001 Install Road Closure Gate AQ EA 2.00
TOTAL INCLUDING OPTION B WORK:
One award will be made from this solicitation.
Option B Bid includes Work on Trail 2.
Bidder must provide price on all Base Bid items and Option B items to be considered for award.
Schedule of Items, Rev. 1 (Upper Tellico Roads Reconditioning)
Option B (Trail 2 Reconditioning) Bid Items
As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. All quantities are Actual Quantities unless specifically designated as a Contract Quantity by "CQ"
OPTION B TOTAL: