Section B - Schedule of Items Revised

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/26/2010

ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTALS

15101 Mobilization

LS

1.00

15201 Construction staking and surveying, Slope Staking, Method I, Tolerance B LS

1.00

15702 Silt Fence

LF

7220.00

15707 Hay Bales EA 136.00

20101 Clearing and Grubbing AC 10.90

20301 Removal of Culverts EA 12.00

20419 Drainage excavation, Ditch construction

Foot 10551.00

20426a Rolling Dip Construction Each 16.00

20503 Blasting LS 1.00

21201 Linear Grading Mile 6.10

25102 Placed Riprap, Class B Ton 56.00

Schedule of Items, Rev. 1 (Upper Tellico Roads Reconditioning)

Base Bid Items

30109a Aggregate surface course, NCDOT ABC, Compaction Method A Ton 2282.00

30109b Aggregate surface course, Railroad Ballast, Compaction Method A Ton 1136.00

30301 Road Recondioning Mile 6.10

60201A 24-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, backfill compaction method b

LF 430.00

60201B 12' x 5' Open Bottom Structural Plate Arch including footings, headwalls and object markers

LF 50.00

60201C 14' x 6' Open Bottom Structural Plate Arch including footings, headwalls and object markers

LF 60.00

62501 Seeding, Hydraullic Method AC 7.00

63501 Temporary Traffic Control LS 1.00

65001 Install Road Closure Gate EA 1.00

As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule. All quantities are Actual Quantities unless specifically designated as a Contract Quantity by "CQ"

BASE BID TOTAL:

4/26/2010

ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTALS

15702 Silt Fence LF 2300.00

15707 Hay Bales EA 280.00

20101 Clearing and Grubbing AC 3.00

20301 Removal of Culverts EA 4.00

20419 Drainage excavation, Ditch construction

Foot 13526.00

20426a Rolling Dip Construction Each 40.00

20426b Rolling Dip Reconstruction Each 30.00

20426c Water Bar Construction Each 25.00

20426d Sediment Trap Construction Each 25.00

21103 Roadway Obliteration, Method 2 Mile 1.00

21201 Linear Grading Mile 2.60

25102 Placed Riprap, Class B Ton 16.00

Schedule of Items, Rev. 1 (Upper Tellico Roads Reconditioning)

Option B (Trail 2 Reconditioning) Bid Items

30109a Aggregate surface course, NCDOT ABC, Compaction Method A Ton 64.00

30109b Aggregate surface course, Railroad Ballast, Compaction Method A Ton 1408.00

30301 Road Recondioning Mile 2.00

60201A 24-inch Pipe Culvert, 14 Gauge, (0.079) Aluminized-Steel Type 2, backfill compaction method b

LF 120.00

62501 Seeding, Hydraullic Method AC 7.00

65001 Install Road Closure Gate EA 2.00

TOTAL INCLUDING OPTION B WORK:

One award will be made from this solicitation.

Option B Bid includes Work on Trail 2.

Bidder must provide price on all Base Bid items and Option B items to be considered for award.

As stated in FP-03, Subsection 109.05, payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid schedule. All quantities are Actual Quantities unless specifically designated as a Contract Quantity by "CQ"

OPTION B TOTAL: