Exhibit 4-Drawing 08-13_rev1.pdf
PDF 32 KB Posted
- Solicitation number
- AG-4419-S-10-0470
About this file
Exhibit 4 - Supplemental Specs
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP-03, Supplemental Specifications for
Upper Tellico Roads Reconstruction
M ob iliz at io n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N C
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou
R ai lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill co m pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al
P la te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work, Rev. 1
0+00 11892 Road Work Begins at Junction with 420-1 0.33 0.33 0.33
0+00 11892 Clear and Grub Trail Section as Required in Plans 4.1
0+00 11892
Grade Roadway. Widen Road as necessary for 12' Width Minimum.
Where Possible Excavate Berm to Gain Width. Use Excavated Material for Embankment Construction to Build up Entrenched Portions of Roadwoy.
Widen Curves as Described on this Schedule of Work 2.3
0+00 11892 Recondition Roadway 2.3
0+00 11892 Seed Disturbed Areas Along Road 2.8
0+00 11892 Surface Roadway with 1" ABC. 890 0+13 Existing Rolling Dip
0+26 Existing Gate
1+02 Regrade And Armor Existing Rolling Dip 8 1+94 Regrade And Armor Existing Rolling Dip 8 2+72 Regrade And Armor Existing Rolling Dip 8 3+72 Existing Rolling Dip
4+76 Regrade And Armor Existing Rolling Dip 8 5+66 Regrade And Armor Existing Rolling Dip 85+66 Regrade And Armor Existing Rolling Dip 8 6+34 Regrade And Armor Existing Rolling Dip 8 7+46 Regrade And Armor Existing Rolling Dip 8 8+74 Regrade And Armor Existing Rolling Dip 8 9+54 Install Rolling Dip 5 1 8
10+20 Intersection of Parking on Right
10+34 Regrade And Armor Existing Rolling Dip 8 10+74 Regrade And Armor Existing Rolling Dip 8 11+00 Existing Rolling Dip
11+82 Existing Rolling Dip
12+70 Existing Rolling Dip
13+41 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30
13+41 11892
Construct Roadside Ditch with Ditch Blocks every 50'. Shed water where possible. 10551 160
13+62 Existing Rolling Dip
14+26 Existing Rolling Dip
14+80 Existing Rolling Dip
15+76 Regrade And Armor Existing Rolling Dip 8 16+54 Existing Rolling Dip
17+14 Existing Rolling Dip
17+60 Existing Rolling Dip
18+00 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-06, State Line
Schedule of Work
Upper Tellico Roads Reconstruction
M ob iliz at io n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill co m pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work, Rev. 1
20+06 Regrade And Armor Existing Rolling Dip 8 20+58 Regrade And Armor Existing Rolling Dip 8 21+16 Regrade And Armor Existing Rolling Dip 8 22+16 Regrade And Armor Existing Rolling Dip 8 23+50 Existing Rolling Dip
23+98 Existing Rolling Dip
24+64 Existing Rolling Dip
25+46 Existing Rolling Dip
26+14 Existing Rolling Dip
26+74 Regrade And Armor Existing Rolling Dip 8 27+30 Existing Rolling Dip
27+84 Existing Rolling Dip
28+16 Existing Rolling Dip
28+84 Existing Rolling Dip
29+48 Regrade And Armor Existing Rolling Dip 8 30+12 Existing Rolling Dip
30+70 Existing Rolling Dip
31+56 Existing Rolling Dip
31+90 Existing Rolling Dip
32+48 Existing Rolling Dip
33+40 Existing Rolling Dip
33+76 Regrade And Armor Existing Rolling Dip 8 34+10 Existing Rolling Dip
34+58 Existing Rolling Dip
35+38 Existing Rolling Dip
36+12 Existing Rolling Dip
36+62 Existing Rolling Dip
37+32 Existing Rolling Dip
38+30 Regrade And Armor Existing Rolling Dip 8 38+84 Regrade And Armor Existing Rolling Dip 8 39+26 Existing Rolling Dip
40+12 Regrade And Armor Existing Rolling Dip 8 41+10 Existing Rolling Dip
42+00 Existing Rolling Dip
42+65 4315 Taper Roadway Width from 12' to 30'
42+70 Existing Rolling Dip
43+15 4470 Widen Curve in Cut to a Roadway Width of 30'
44+00 Regrade And Armor Existing Rolling Dip 8 44+70 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Upper Tellico Roads Reconstruction
M ob iliz at io n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill co m pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work, Rev. 1
44+70 4520 Taper Roadway Width from 30' to 12'
44+96 Existing Rolling Dip
45+64 Existing Rolling Dip
46+50 Existing Rolling Dip
47+40 Existing Rolling Dip
48+80 Existing Rolling Dip
50+00 Existing Rolling Dip
50+54 Regrade And Armor Existing Rolling Dip 8 51+26 Regrade And Armor Existing Rolling Dip 8 52+06 Install Rolling Dip 5 1 8 52+86 Regrade And Armor Existing Rolling Dip 8 53+88 Regrade And Armor Existing Rolling Dip 8 54+56 Existing Rolling Dip
55+80 Regrade And Armor Existing Rolling Dip 8 56+42 Regrade and Armor Existing Sag 8 56+86 Regrade And Armor Existing Rolling Dip 8 57+49 Install Rolling Dip 5 1 8 58+12 Regrade And Armor Existing Rolling Dip 8 58+50 Regrade And Armor Existing Rolling Dip 8 59+22 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30 59+84 Existing Rolling Dip
60+66 Existing Rolling Dip
61+40 Regrade And Armor Existing Rolling Dip 8 62+44 Regrade And Armor Existing Rolling Dip 8 62+92 Regrade And Armor Existing Rolling Dip 8 63+38 Regrade And Armor Existing Rolling Dip 8 63+98 Regrade And Armor Existing Rolling Dip 8 64+96 Regrade And Armor Existing Rolling Dip 8 65+70 Regrade And Armor Existing Rolling Dip 8 66+30 Regrade And Armor Existing Rolling Dip 8 67+04 Regrade And Armor Existing Rolling Dip 8 67+50 Existing Rolling Dip
68+18 8 68+88 Regrade And Armor Existing Rolling Dip 8
69+85 Existing Rolling Dip
70+38 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Upper Tellico Roads Reconstruction
M ob iliz at io n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill co m pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work, Rev. 1
71+06 Regrade And Armor Existing Rolling Dip 8 71+66 Regrade And Armor Existing Rolling Dip 8 72+34 Regrade And Armor Existing Rolling Dip 8 73+04 Existing Rolling Dip
73+46 Existing Rolling Dip
74+14 Existing Rolling Dip
75+04 Existing Rolling Dip
75+94 Existing Rolling Dip
76+78 Existing Rolling Dip
77+40 18' X 20' CMP
77+94 Existing Rolling Dip
78+96 Existing Rolling Dip
80+16 Existing Rolling Dip
80+96 Existing Rolling Dip
81+88 Regrade and Armor Existing Sag 8
82+54 Existing Rolling Dip
83+28 Regrade And Armor Existing Rolling Dip 8
83+84 Existing Rolling Dip
84+70 Existing Rolling Dip
85+24 Existing Rolling Dip
86+10 Existing Rolling Dip
87+10 Existing Rolling Dip
88+34 Regrade And Armor Existing Rolling Dip 8
89+42 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30
89+68 Regrade and Armor Existing Sag 8
91+02 Regrade and Armor Existing Sag 8
91+40 Existing Rolling Dip
91+94 Regrade and Armor Existing Sag 8
92+96 Existing Rolling Dip
93+94 Regrade And Armor Existing Rolling Dip 8
94+88 Existing Rolling Dip
95+92 Install Rolling Dip 5 1 16
96+96 Existing Rolling Dip
96+70 Existing Rolling Dip
98+20 Existing Rolling Dip
98+98 Existing Rolling Dip
99+28 Existing Rolling Dip
100+48 Existing Rolling Dip
101+00 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
for ak in g an d e S ta ki ng an ce
B ub bi ng ve rts at io n, on st ru ct io n on st ru ct io n tru ct io n
C on st ru ct io n ra tio n, M et ho d
C la ss B ce c ou om pa ct io n ce c ou
, C om pa ct io n ni ng lv er t, G au ge ze d-
S te el T yp e ac tio n m et ho d b ot to m S tru ct di ng fo ot in gs ob je ct m ar ke rs ot to m S tru ct di ng fo ot in gs ob je ct m ar ke rs ul lic
M et ho d fic C on tro l su re
G at e
NFSR 420-06, State Line Schedule of Work, Rev. 1 for Upper Tellico Roads Reconstruction
M ob iliz at io n
C on st ru ct io n st a su rv ey in g, S lo pe M et ho d I, To le ra
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru
R em ov al o f C ul v
D ra in ag e ex ca va
D itc h co ns tru ct io
R ol lin g
D ip
C on s
R ol lin g
D ip
R ec o
W at er B ar C on st
S ed im en t T ra p C
R oa dw ay
O bl ite r
Li ne ar G ra di ng
P la ce d
R ip ra p, C
A gg re ga te s ur fa c N
C D
O T
A B
C , C o M et ho d A
A gg re ga te s ur fa c R ai lro ad B al la st
M et ho d
A
R oa d R ec on di on
-in ch P ip e
C ul
(0 .0
) A lu m in iz e 2, b ac kf ill co m pa
' x
' O pe n
Bo P la te
A rc h in cl ud he ad w al ls a nd o
' x
' O pe n
B o P la te
A rc h in cl ud he ad w al ls a nd o
S ee di ng
, H yd ra u
Te m po ra ry T ra ffi
In st al l R oa d
C lo s
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
Station
102+24 Install Rolling Dip 5 1 8 103+48 Existing Rolling Dip
104+08 Existing Rolling Dip
104+68 Existing Rolling Dip
105+32 Existing Rolling Dip
105+96 Existing Rolling Dip
106+66 Existing Rolling Dip
107+44 Existing Rolling Dip
108+28 Existing Rolling Dip
108+84 Existing Rolling Dip
109+28 Existing Rolling Dipg g p
110+06 Existing Rolling Dip
110+70 Existing Rolling Dip
111+32 Existing Rolling Dip
112+00 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30 112+14 Regrade and Armor Existing Sag 8 113+00 Regrade and Armor Existing Sag 8 114+70 Rolling Dip
115+36 Regrade and Armor Existing Sag 8 116+14 Install Rolling Dip 5 1 8
116+92 Regrade and Armor Existing Sag 8
117+62 Existing Rolling Dip
118+18 Existing Rolling Dip
118+54 Regrade and Armor Existing Sag 8 118+92 Regrade and Armor Existing Sag 8 11900 Install Closure Gate at End of Road 1
0.33 0.33 0.00 58.00 4.10 4.00 ####### 6.00 0.00 0.00 0.00 0.00 2.30 16.00 954.00 680.00 2.30 120.00 0.00 0.00 2.80 0.33 1.00
Total Quantity of Work:
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Schedule of Work 55REGION 8 UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
File details come from the government source that posted it. Updated .