Exhibit 4-Drawing 08-13_rev1.pdf

PDF 32 KB Posted

Attached to
RECOVERY* Upper Tellico Road Const. , Nantahala National Forest, North Carolina
Solicitation number
AG-4419-S-10-0470
Issued by

About this file

Exhibit 4 - Supplemental Specs

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FP-03, Supplemental Specifications for

Upper Tellico Roads Reconstruction

M ob iliz at io n

C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng

M et ho d

I, To le ra nc e

B

S ilt

F en ce

H ay

B al es

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

R ol lin g

D ip

R ec on st ru ct io n

W at er B ar C on st ru ct io n

S ed im en t T ra p C on st ru ct io n

R oa dw ay

O bl ite ra tio n, M et ho d

Li ne ar G ra di ng

P la ce d

R ip ra p, C la ss B

A gg re ga te s ur fa ce c ou rs e, N C

D O

T A

B C

, C om pa ct io n

M et ho d

A

A gg re ga te s ur fa ce c ou

R ai lro ad

B al la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

-in ch P ip e

C ul ve rt, G au ge

(0 .0

) A lu m in iz ed -S te el

T yp e 2, b ac kf ill co m pa ct io n m et ho d b

' x

' O pe n

B ot to m

S tru ct ur al

P la te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

Te m po ra ry T ra ffi c C on tro l

In st al l R oa d

C lo su re

G at e

Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001

Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA

Begin End Description of Work

NFSR 420-06, State Line

Station

Schedule of Work, Rev. 1

0+00 11892 Road Work Begins at Junction with 420-1 0.33 0.33 0.33

0+00 11892 Clear and Grub Trail Section as Required in Plans 4.1

0+00 11892

Grade Roadway. Widen Road as necessary for 12' Width Minimum.

Where Possible Excavate Berm to Gain Width. Use Excavated Material for Embankment Construction to Build up Entrenched Portions of Roadwoy.

Widen Curves as Described on this Schedule of Work 2.3

0+00 11892 Recondition Roadway 2.3

0+00 11892 Seed Disturbed Areas Along Road 2.8

0+00 11892 Surface Roadway with 1" ABC. 890 0+13 Existing Rolling Dip

0+26 Existing Gate

1+02 Regrade And Armor Existing Rolling Dip 8 1+94 Regrade And Armor Existing Rolling Dip 8 2+72 Regrade And Armor Existing Rolling Dip 8 3+72 Existing Rolling Dip

4+76 Regrade And Armor Existing Rolling Dip 8 5+66 Regrade And Armor Existing Rolling Dip 85+66 Regrade And Armor Existing Rolling Dip 8 6+34 Regrade And Armor Existing Rolling Dip 8 7+46 Regrade And Armor Existing Rolling Dip 8 8+74 Regrade And Armor Existing Rolling Dip 8 9+54 Install Rolling Dip 5 1 8

10+20 Intersection of Parking on Right

10+34 Regrade And Armor Existing Rolling Dip 8 10+74 Regrade And Armor Existing Rolling Dip 8 11+00 Existing Rolling Dip

11+82 Existing Rolling Dip

12+70 Existing Rolling Dip

13+41 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30

13+41 11892

Construct Roadside Ditch with Ditch Blocks every 50'. Shed water where possible. 10551 160

13+62 Existing Rolling Dip

14+26 Existing Rolling Dip

14+80 Existing Rolling Dip

15+76 Regrade And Armor Existing Rolling Dip 8 16+54 Existing Rolling Dip

17+14 Existing Rolling Dip

17+60 Existing Rolling Dip

18+00 Existing Rolling Dip

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

NATIONAL FORESTS OF NORTH CAROLINA

TUSQUITEE RANGER DISTRICT

UPPER TELLICO ROADS RECONSTRUCTION

NFSR 420-06, State Line

Schedule of Work

Upper Tellico Roads Reconstruction

M ob iliz at io n

C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng

M et ho d

I, To le ra nc e

B

S ilt

F en ce

H ay

B al es

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

R ol lin g

D ip

R ec on st ru ct io n

W at er B ar C on st ru ct io n

S ed im en t T ra p C on st ru ct io n

R oa dw ay

O bl ite ra tio n, M et ho d

Li ne ar G ra di ng

P la ce d

R ip ra p, C la ss B

A gg re ga te s ur fa ce c ou

D O

T A

B C

, C om pa ct io n

M et ho d

A

A gg re ga te s ur fa ce c ou lro ad

B al la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

-in ch P ip e

C ul ve rt, G au ge

(0 .0

) A lu m in iz ed -S te el

T yp e 2, b ac kf ill co m pa ct io n m et ho d b

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

Te m po ra ry T ra ffi c C on tro l

In st al l R oa d

C lo su re

G at e

Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001

Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA

Begin End Description of Work

NFSR 420-06, State Line

Station

Schedule of Work, Rev. 1

20+06 Regrade And Armor Existing Rolling Dip 8 20+58 Regrade And Armor Existing Rolling Dip 8 21+16 Regrade And Armor Existing Rolling Dip 8 22+16 Regrade And Armor Existing Rolling Dip 8 23+50 Existing Rolling Dip

23+98 Existing Rolling Dip

24+64 Existing Rolling Dip

25+46 Existing Rolling Dip

26+14 Existing Rolling Dip

26+74 Regrade And Armor Existing Rolling Dip 8 27+30 Existing Rolling Dip

27+84 Existing Rolling Dip

28+16 Existing Rolling Dip

28+84 Existing Rolling Dip

29+48 Regrade And Armor Existing Rolling Dip 8 30+12 Existing Rolling Dip

30+70 Existing Rolling Dip

31+56 Existing Rolling Dip

31+90 Existing Rolling Dip

32+48 Existing Rolling Dip

33+40 Existing Rolling Dip

33+76 Regrade And Armor Existing Rolling Dip 8 34+10 Existing Rolling Dip

34+58 Existing Rolling Dip

35+38 Existing Rolling Dip

36+12 Existing Rolling Dip

36+62 Existing Rolling Dip

37+32 Existing Rolling Dip

38+30 Regrade And Armor Existing Rolling Dip 8 38+84 Regrade And Armor Existing Rolling Dip 8 39+26 Existing Rolling Dip

40+12 Regrade And Armor Existing Rolling Dip 8 41+10 Existing Rolling Dip

42+00 Existing Rolling Dip

42+65 4315 Taper Roadway Width from 12' to 30'

42+70 Existing Rolling Dip

43+15 4470 Widen Curve in Cut to a Roadway Width of 30'

44+00 Regrade And Armor Existing Rolling Dip 8 44+70 Existing Rolling Dip

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

NATIONAL FORESTS OF NORTH CAROLINA

TUSQUITEE RANGER DISTRICT

UPPER TELLICO ROADS RECONSTRUCTION

Upper Tellico Roads Reconstruction

M ob iliz at io n

C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng

M et ho d

I, To le ra nc e

B

S ilt

F en ce

H ay

B al es

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

R ol lin g

D ip

R ec on st ru ct io n

W at er B ar C on st ru ct io n

S ed im en t T ra p C on st ru ct io n

R oa dw ay

O bl ite ra tio n, M et ho d

Li ne ar G ra di ng

P la ce d

R ip ra p, C la ss B

A gg re ga te s ur fa ce c ou

D O

T A

B C

, C om pa ct io n

M et ho d

A

A gg re ga te s ur fa ce c ou lro ad

B al la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

-in ch P ip e

C ul ve rt, G au ge

(0 .0

) A lu m in iz ed -S te el

T yp e 2, b ac kf ill co m pa ct io n m et ho d b

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

Te m po ra ry T ra ffi c C on tro l

In st al l R oa d

C lo su re

G at e

Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001

Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA

Begin End Description of Work

NFSR 420-06, State Line

Station

Schedule of Work, Rev. 1

44+70 4520 Taper Roadway Width from 30' to 12'

44+96 Existing Rolling Dip

45+64 Existing Rolling Dip

46+50 Existing Rolling Dip

47+40 Existing Rolling Dip

48+80 Existing Rolling Dip

50+00 Existing Rolling Dip

50+54 Regrade And Armor Existing Rolling Dip 8 51+26 Regrade And Armor Existing Rolling Dip 8 52+06 Install Rolling Dip 5 1 8 52+86 Regrade And Armor Existing Rolling Dip 8 53+88 Regrade And Armor Existing Rolling Dip 8 54+56 Existing Rolling Dip

55+80 Regrade And Armor Existing Rolling Dip 8 56+42 Regrade and Armor Existing Sag 8 56+86 Regrade And Armor Existing Rolling Dip 8 57+49 Install Rolling Dip 5 1 8 58+12 Regrade And Armor Existing Rolling Dip 8 58+50 Regrade And Armor Existing Rolling Dip 8 59+22 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30 59+84 Existing Rolling Dip

60+66 Existing Rolling Dip

61+40 Regrade And Armor Existing Rolling Dip 8 62+44 Regrade And Armor Existing Rolling Dip 8 62+92 Regrade And Armor Existing Rolling Dip 8 63+38 Regrade And Armor Existing Rolling Dip 8 63+98 Regrade And Armor Existing Rolling Dip 8 64+96 Regrade And Armor Existing Rolling Dip 8 65+70 Regrade And Armor Existing Rolling Dip 8 66+30 Regrade And Armor Existing Rolling Dip 8 67+04 Regrade And Armor Existing Rolling Dip 8 67+50 Existing Rolling Dip

68+18 8 68+88 Regrade And Armor Existing Rolling Dip 8

69+85 Existing Rolling Dip

70+38 Existing Rolling Dip

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

NATIONAL FORESTS OF NORTH CAROLINA

TUSQUITEE RANGER DISTRICT

UPPER TELLICO ROADS RECONSTRUCTION

Upper Tellico Roads Reconstruction

M ob iliz at io n

C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng

M et ho d

I, To le ra nc e

B

S ilt

F en ce

H ay

B al es

C le ar in g an d G ru bb in g

R em ov al o f C ul ve rts

D ra in ag e ex ca va tio n, D itc h co ns tru ct io n

R ol lin g

D ip

C on st ru ct io n

R ol lin g

D ip

R ec on st ru ct io n

W at er B ar C on st ru ct io n

S ed im en t T ra p C on st ru ct io n

R oa dw ay

O bl ite ra tio n, M et ho d

Li ne ar G ra di ng

P la ce d

R ip ra p, C la ss B

A gg re ga te s ur fa ce c ou

D O

T A

B C

, C om pa ct io n

M et ho d

A

A gg re ga te s ur fa ce c ou lro ad

B al la st

, C om pa ct io n

M et ho d

A

R oa d R ec on di on in g

-in ch P ip e

C ul ve rt, G au ge

(0 .0

) A lu m in iz ed -S te el

T yp e 2, b ac kf ill co m pa ct io n m et ho d b

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

' x

' O pe n

B ot to m

S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs

S ee di ng

, H yd ra ul lic M et ho d

Te m po ra ry T ra ffi c C on tro l

In st al l R oa d

C lo su re

G at e

Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001

Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA

Begin End Description of Work

NFSR 420-06, State Line

Station

Schedule of Work, Rev. 1

71+06 Regrade And Armor Existing Rolling Dip 8 71+66 Regrade And Armor Existing Rolling Dip 8 72+34 Regrade And Armor Existing Rolling Dip 8 73+04 Existing Rolling Dip

73+46 Existing Rolling Dip

74+14 Existing Rolling Dip

75+04 Existing Rolling Dip

75+94 Existing Rolling Dip

76+78 Existing Rolling Dip

77+40 18' X 20' CMP

77+94 Existing Rolling Dip

78+96 Existing Rolling Dip

80+16 Existing Rolling Dip

80+96 Existing Rolling Dip

81+88 Regrade and Armor Existing Sag 8

82+54 Existing Rolling Dip

83+28 Regrade And Armor Existing Rolling Dip 8

83+84 Existing Rolling Dip

84+70 Existing Rolling Dip

85+24 Existing Rolling Dip

86+10 Existing Rolling Dip

87+10 Existing Rolling Dip

88+34 Regrade And Armor Existing Rolling Dip 8

89+42 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30

89+68 Regrade and Armor Existing Sag 8

91+02 Regrade and Armor Existing Sag 8

91+40 Existing Rolling Dip

91+94 Regrade and Armor Existing Sag 8

92+96 Existing Rolling Dip

93+94 Regrade And Armor Existing Rolling Dip 8

94+88 Existing Rolling Dip

95+92 Install Rolling Dip 5 1 16

96+96 Existing Rolling Dip

96+70 Existing Rolling Dip

98+20 Existing Rolling Dip

98+98 Existing Rolling Dip

99+28 Existing Rolling Dip

100+48 Existing Rolling Dip

101+00 Existing Rolling Dip

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

NATIONAL FORESTS OF NORTH CAROLINA

TUSQUITEE RANGER DISTRICT

UPPER TELLICO ROADS RECONSTRUCTION

for ak in g an d e S ta ki ng an ce

B ub bi ng ve rts at io n, on st ru ct io n on st ru ct io n tru ct io n

C on st ru ct io n ra tio n, M et ho d

C la ss B ce c ou om pa ct io n ce c ou

, C om pa ct io n ni ng lv er t, G au ge ze d-

S te el T yp e ac tio n m et ho d b ot to m S tru ct di ng fo ot in gs ob je ct m ar ke rs ot to m S tru ct di ng fo ot in gs ob je ct m ar ke rs ul lic

M et ho d fic C on tro l su re

G at e

NFSR 420-06, State Line Schedule of Work, Rev. 1 for Upper Tellico Roads Reconstruction

M ob iliz at io n

C on st ru ct io n st a su rv ey in g, S lo pe M et ho d I, To le ra

S ilt

F en ce

H ay

B al es

C le ar in g an d G ru

R em ov al o f C ul v

D ra in ag e ex ca va

D itc h co ns tru ct io

R ol lin g

D ip

C on s

R ol lin g

D ip

R ec o

W at er B ar C on st

S ed im en t T ra p C

R oa dw ay

O bl ite r

Li ne ar G ra di ng

P la ce d

R ip ra p, C

A gg re ga te s ur fa c N

C D

O T

A B

C , C o M et ho d A

A gg re ga te s ur fa c R ai lro ad B al la st

M et ho d

A

R oa d R ec on di on

-in ch P ip e

C ul

(0 .0

) A lu m in iz e 2, b ac kf ill co m pa

' x

' O pe n

Bo P la te

A rc h in cl ud he ad w al ls a nd o

' x

' O pe n

B o P la te

A rc h in cl ud he ad w al ls a nd o

S ee di ng

, H yd ra u

Te m po ra ry T ra ffi

In st al l R oa d

C lo s

Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001

Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA

Begin End Description of Work

Station

102+24 Install Rolling Dip 5 1 8 103+48 Existing Rolling Dip

104+08 Existing Rolling Dip

104+68 Existing Rolling Dip

105+32 Existing Rolling Dip

105+96 Existing Rolling Dip

106+66 Existing Rolling Dip

107+44 Existing Rolling Dip

108+28 Existing Rolling Dip

108+84 Existing Rolling Dip

109+28 Existing Rolling Dipg g p

110+06 Existing Rolling Dip

110+70 Existing Rolling Dip

111+32 Existing Rolling Dip

112+00 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30 112+14 Regrade and Armor Existing Sag 8 113+00 Regrade and Armor Existing Sag 8 114+70 Rolling Dip

115+36 Regrade and Armor Existing Sag 8 116+14 Install Rolling Dip 5 1 8

116+92 Regrade and Armor Existing Sag 8

117+62 Existing Rolling Dip

118+18 Existing Rolling Dip

118+54 Regrade and Armor Existing Sag 8 118+92 Regrade and Armor Existing Sag 8 11900 Install Closure Gate at End of Road 1

0.33 0.33 0.00 58.00 4.10 4.00 ####### 6.00 0.00 0.00 0.00 0.00 2.30 16.00 954.00 680.00 2.30 120.00 0.00 0.00 2.80 0.33 1.00

Total Quantity of Work:

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 8

NATIONAL FORESTS OF NORTH CAROLINA

TUSQUITEE RANGER DISTRICT

UPPER TELLICO ROADS RECONSTRUCTION

Schedule of Work 55REGION 8 UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work

File details come from the government source that posted it. Updated .