Exhibit 1 - Drawings and addt'l Specs B.pdf
PDF 5 MB Posted
- Solicitation number
- AG-4419-S-10-0470
About this file
Exhibit 1 - Drawings and Add'l Specs
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, ba ck fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P la te
A rc h in cl ud in g fo ot in gs , h ea dw al ls a nd je ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
NFSR 420-04, Fain Ford
FP-03, Supplemental Specifications for
Upper Tellico Road Reconditioning
Schedule of Work
Item Number:
LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End
0+00 0.33 0.33 0.33
0+00 140+00 2.7
0+00 140+00 4.9
0+00 140+00 0.33 2.7
0+00 140+00
0+70
1+50
2+40
3+10
4+20
4+85 7 1 4 16 30
Existing Dip & Sediment Basin
Replace Existing Culvert with 24"x30' CMP to Accommodate Widened Road
Recondition Roadway
Clear in accordance with Typical Sections
Linear Grade Roadway. Widen Road as necessary for 12' Width Minimum.
Where Possible Excavate Berm to Gain Width. Use Excavated Material for Embankment Construction for Curve Widening and for Building up Entrenched Portions of Roadway.
Widen Curves as Described on this Schedule of Work
Seed Disturbed Areas
Existing Dip & Sediment Basin
Beginning of Work at Intersection with Trail 1
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Station Unit of Measure:
Description of Work
Existing Dip & Sediment Basin
4+85 7 1 4 16 30
4+90
5+80
6+50
7+65
8+10
9+00
9+00 20+00 1100
9+90
10+35
11+15
11+85
12+40
13+45 7 1 4 16 30
13+90 Existing Dip & Sediment Basin
Replace Existing Culvert with 24"x30' CMP to Accommodate Widened Road
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Replace Existing Culvert with 24"x30' CMP to Accomdodate Widened Road
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Culvert to Remain
Install Silt Fence at Toe of Slope
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
14+68
15+45 7 1 4 16 30
15+60
16+10
16+70
17+05
18+10
18+60
19+40
19+45 19+95
NFSR 420-04, Fain Ford
Schedule of Work
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Replace Existing Culvert with 24"x30' CMP to Accomdodate Widened Road
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Construct Rolling Dip
Taper Roadway Width from 12' to 23' ili za tio n
C on st ru ct io n st ak in g an d su rv ey pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End
NFSR 420-04, Fain Ford
Station
FP-03, Supplemental Specifications for
Upper Tellico Road Reconditioning
Item Number:
Unit of Measure:
Schedule of Work
Description of Work
19+90
19+95 22+70
20+65
21+10
21+75
22+40
22+70 23+20
22+65
23+40
23+65 24+15
24+00
24+15 25+10
24+85
25+10 7 1 4 16 40
25+10 25+60
Replace Existing Culvert with 24"x40' CMP to Accomdodate Widened Road
Taper Roadway Width from 12' to 21'
Widen Curve on Fill to a Roadway Width of 21'
Taper Roadway Width from 21' to 12'
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Culvert to Remain
Existing Grade Sag & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Widen Curve on Fill to a Roadway Width of 23'
Taper Roadway Width from 23' to 12' Width
25+10 25+60
25+65
26+45
27+60
28+67
29+78
30+66
30+86 8
31+62
32+82
33+70 8
34+33
35+32
36+26 8
36+76
37+81
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Taper Roadway Width from 21 to 12
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
37+81
38+50
39+00 7 4 16 30
39+11
40+46 7 4 16 30
40+71 8
41+69
42+68
43+00 43+50
43+50 44+80
44+80 45+30
43+63
44+57
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-04, Fain Ford
Schedule of Work
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
Taper Roadway Width from 12' to 18'
Widen Curve into Cut Slope to a Width of 18'
Taper Roadway Width from 18' to 12'
Install Rolling Dip
Grade Out Existing Dip. Use Material as Cover for Culvert.
Install 24"x30' CMP at Spring
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Install 24"x30' CMP at Spring
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
55UPPER TELLICO ROADS RECONSTRUCTION Schedule of WorkREGION 8 ili za tio n
C on st ru ct io n st ak in g an d su rv ey pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-04, Fain Ford
Station
FP-03, Supplemental Specifications for
Upper Tellico Road Reconditioning
Item Number:
Unit of Measure:
Schedule of Work
Begin End
45+30
46+03
46+80
47+98
49+18
50+14
51+00
51+81
52+77
53+70
53+70 54+20
54+20 8
54+20 55+80
55+20
55+80 56+30
Description of Work
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Taper Roadway from 12' to 18'
Widen Curve into Cut Slope to a Width of 18'
Taper Roadway Width from 18' to 12'
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
55+80 56+30
56+67
57+54 8
57+78 8
58+62
59+76 8
60+45 8
61+31 8
62+02 8
62+63
62+96 8
63+29 8
63+84 8
64+91
65+29 8
65+65 8
Regrade and Armor Existing Rolling Dip
R d d A E i ti R lli Di
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Intersection with Trail 11
Taper Roadway Width from 18' to 12'
65+65 8
66+75 67+25
66+76 8
67+00 135+00
67+25 67+95
67+91 8
67+95 68+45
68+79 8
69+61 8
70+36 8
71+24
72+70
73+40
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
NFSR 420-04, Fain Ford
Schedule of Work
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Widen Roadway as Necessary for 12' Width
Taper Roadway Width from 12' to 21'
Widen Curve on Fill to a Roadway Width of 21'
Taper Roadway Width from 21' to 12'
55REGION 8 UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work n on s ta ki ng a nd s ur ve yi ng ng
, M et ho d
I, To le ra nc e
B nd G ru bb in g f C ul ve rts xc av at io n, ru ct io n
C on st ru ct io n
R ec on st ru ct io n
C on st ru ct io n
Tr ap
C on st ru ct io n
O bl ite ra tio n, M et ho d di ng ra p, C la ss B su rfa ce c ou rs e, N
C D
O T pa ct io n
M et ho d
A su rfa ce c ou rs e, R ai m pa ct io n M et ho d A nd io ni ng e C ul ve rt, G au ge m in iz ed -S te el
T yp pa ct io n m et ho d b en B ot to m S tru ct ur al
P g fo ot in gs
, h ea dw al ls ke rs en B ot to m S tru ct ur al
P fo ot in gs
, h ea dw al ls ke yd ra ul lic
M et ho d
Tr af fic C on tro l d C lo su re G at e
Schedule of Work
FP-03, Supplemental Specifications for
Upper Tellico Road Reconditioning
NFSR 420-04, Fain Ford
M ob ili za tio n
C on st ru ct io n S lo pe
S ta ki n
S ilt
F en ce
H ay
B al es
C le ar in g an d
R em ov al o f
D ra in ag e ex
D itc h co ns tr
R ol lin g
D ip
C
R ol lin g
D ip
W at er B ar C
S ed im en t T r
B la st in g
R oa dw ay
O
Li ne ar G ra d
P la ce d
R ip r
A gg re ga te s
A B
C , C om p
A gg re ga te s
B al la st
, C om
R oa d R ec on
-in ch P ip e
(0 .0
) A lu m ba ck fil l c om
' x
' O pe A rc h in cl ud i ob je ct m ar k
' x
' O p e A rc h in cl ud i ob je ct m ar k
S ee di ng
, H y
Te m po ra ry T
In st al l R oa d
15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End
74+32
74+89
75+67
76+74
77+40
77+75 78+25
78+25 80+95
78+30 8
79+14 8
Station
Reconditioning
Item Number:
Unit of Measure:
Description of Work
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Taper Roadway Width from 12' to 28'
Widen Curve on Fill to a Roadway Width of 28'
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
79+14 8
79+89 8
80+56 8
80+95 81+45
81+45 84+20
81+56 8
82+48
83+32 8
84+20 84+70
84+28 8
85+05 8
86+06 8
87+00 87+50
87+18 8
87+50 89+15
88+57
Taper Roadway Width from 12' to 28'
Widen Curve on Fill to a Width of 28'
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
E i ti Di & S di t B i
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Taper Roadway Width from 28' to 14'
Widen Curve on FIll to Roadway Width o 14'
Taper Roadway Width from 14' to 12'
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
88+57
89+15 89+65
89+46
89+65 92+35
90+56
91+38 8
92+04 8
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-04, Fain Ford
Schedule of Work
Taper Roadway Width from 28' to 14'
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Widen Curve on Fill to a Roadway Width of 14' ili za tio n
C on st ru ct io n st ak in g an d su rv ey pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End
Schedule of Work
Description of Work
NFSR 420-04, Fain Ford
Station
FP-03, Supplemental Specifications for
Upper Tellico Road Reconditioning
Item Number:
Unit of Measure:
Begin End
92+35 92+85
92+57 8
92+85 93+50
93+41
93+50 94+00
94+01
94+49 8
95+24 8
95+60 96+10
95+83 8
96+10 97+30
96+76
97+30 97+80
97+92
98+00 98+50
Description of Work
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Widen Curve into Cut Slope to a Width of 18'
Taper Roadway Width from 18' to 12'
Taper Roadway Width from 12' to 18'
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Taper Roadway Width from 14' to 25'
Widen Curve on Fill to a Roadway Width of 25'
Taper Roadway Width from 25' to 12'
Taper Roadway Width from 12' to 18'
98+00 98+50
98+50 100+15
98+73 8
99+69
100+15 100+65
101+08
102+14
102+77
103+59
104+04
104+95
105+85
106+78 8
107+30 107+80
107+40
107+80 110+60
Taper Roadway Width from 18' to 12'
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Taper Roadway Width from 12' to 18'
Wid C Fill t R d Width f 18'
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Taper Roadway Width from 12' to 18'
Widen Curve on Fill to a Roadway Width of 18'
Existing Dip & Sediment Basin
107+80 110+60
108+27
109+41 8
110+60 111+10
110+61 8
111+31
111+50
112+14 8
112+79
113+00 113+50
113+50 114+00
113+53 8
114+06
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
NFSR 420-04, Fain Ford
Schedule of Work
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Existing Culvert to Remain
Taper Roadway Width on Fill at Curve to a Width of 24'
Taper Roadway Width from 24' to 12'
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Widen Curve on Fill to a Roadway Width of 18'
Taper Roadway Width from 18' to 12'
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
55UPPER TELLICO ROADS RECONSTRUCTION Schedule of WorkREGION 8 ili za tio n
C on st ru ct io n st ak in g an d su rv ey pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Schedule of WorkNFSR 420-04, Fain Ford
Station
FP-03, Supplemental Specifications for
Upper Tellico Road Reconditioning
Item Number:
Unit of Measure:
114+81
115+48
115+97
116+70 8
117+00 121+00 400
117+28
117+65
117+75 118+25
118+10
118+25 120+70
118+50
118+65
119+05
119+40
119+48 200 1 80 60
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Bridge
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Taper Roadway Width from 12' to 23'
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Culvert to Remain
Install Silt Fence Along Toe of Slope
Remove Existing Culvert and Replace with 14' x 6' x 60' Open Bottom Structural Plate Arch with Headwalls and Footings
Widen Curve on Fill to a Roadway Width of 23'
119+56
119+75
120+55
120+70 121+20
121+30
122+00
123+48 5 1 8
124+95 5 1 8
126+43
127+13 8
127+77 8
128+48
129+28
130+33
131+01
Install Rolling Dip
Install Rolling Dip
End Bridge
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Taper Roadway Width from 23' to 12'
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Regrade and Armor Existing Rolling Dip
Regrade and Armor Existing Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin g
131+75
132+61
133+84
135+03
135+48
136+94 5 1 8
137+79
138+40 8
138+77
140+00 1
0.33 0.33 1700 57 4.9 5 0 3 0 0 0 0.33 0 2.7 24 176 400 2.7 190 0 60 0 0.33 1
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-04, Fain Ford
Schedule of Work
Intersection with Trail 3
Armor and Regrade Dip to Drain
Existing Dip & Sediment Basin
Install Gate
Construct Rolling Dip
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Dip & Sediment Basin
Existing Culvert to Remain
Existing Dip & Sediment Basin
Total Quantity of Work:
55REGION 8 UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
FP-03, Supplemental Specifications for
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
NFSR 402-5, Tellico River
Station
Schedule of Work
N
FS
R
-5
, T el lic o
R iv er
Begin End Description of Work
0+00 Work begins at junction with Trail 1 0.34 0.34 0.34 0+00 5420 Install Silt Fence Along Toe of Slope Above Creek 5420 0+00 5420 Clear and Grub as shown in Typicals 1.9 0+00 5420 Recondition Roadbed
0+00 5420 Seed Disturbed Areas
0+60 Existing Grade Dip
1+95 Replace Existing Culvert with 24"x30' CMP 7 1 4 16 30 3+00 Existing Rolling Dip
4+15 Existing Rolling Dip
5+10 Install Rolling Dip 1 8 6+05 Replace Existing Culvert with 24"x30' CMP 7 1 4 16 30
6+05 5420 Grade and Widen Roadway as Necessary for Required Widths.
Seed Disturbed Areas 0.34 1.1 0.9
7+25 Existing Rolling Dip7+25 Existing Rolling Dip
8+25 Replace Existing Culvert with 24"x30' CMP 7 1 4 16 30 8+50 Existing Culvert to Remain
9+15 Existing Rolling Dip
9+85 Existing Rolling Dip
11+30 Install Rolling Dip 1 8 12+60 Existing Rolling Dip
13+65 Existing Rolling Dip
14+70 Install Rolling Dip 1 8 15+75 Existing Rolling Dip
16+70 Existing Rolling Dip
17+40 Replace Existing Culvert with 24"x30' CMP 7 1 4 16 30 18+65 Existing Rolling Dip
19+80 Install Rolling Dip 1 8 20+95 Existing Rolling Dip
22+35 Existing Culvert to Remain
22+60 Existing Rolling Dip
23+20 Existing Rolling Dip
24+15 Existing Rolling Dip
25+65 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 402-5, Tellico River
Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey pe
S ta ki ng
, M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N
C D
O T
A B
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou rs e, R ai la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
' x
' O pe n
B ot to m
S tru ct ur al P h in cl ud in g fo ot in gs , h ea dw al ls ct m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Schedule of Work
2-
5, T el lic o R iv er
NFSR 402-5, Tellico River
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
26+65 Existing Rolling Dip
27+75 Existing Rolling Dip
30+00 Remove Existing Culvert and Replace with 12' x 5' x 50' Open Bottom Structural Plate Arch with Headwalls and Footings 100 48 50
30+55 Existing Rolling Dip
31+05 Existing Rolling Dip
32+40 Existing Rolling Dip
33+35 Existing Rolling Dip
34+50 Replace Existing Culvert with 24"x30' CMP 7 1 4 16 30 35+05 Replace Existing Culvert with 24"x30' CMP 7 1 4 16 30 35+45 Existing Rolling Dip
36+25 Existing Rolling Dip
37+40 Existing Rolling Dip
38+10 Existing Rolling Dip
Station N
FS
R
38+10 Existing Rolling Dip
38+85 Existing Rolling Dip
40+40 Existing Rolling Dip
41+45 Install Rolling Dip 1 8 42+50 Existing Rolling Dip
43+50 Existing Rolling Dip
44+10 Existing Rolling Dip
45+80 Existing Rolling Dip
47+18 Install Rolling Dip
48+55 Existing Rolling Dip
49+40 Exixting Culvert to Remain
50+77 Install Rolling Dip 1 8 52+13 Install Rolling Dip 1 8 53+50 Begin Bridge
54+20 End Bridge
0.34 0.34 5520 42 1.9 6 0 7 0 0 0 0.34 0 1.1 24 144 56 0 180 50 0 0.9 0.34 0
Total Quantity of Work:
NFSR 402-5, Tellico River
Schedule of Work
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
FP-03, Supplemental Specifications for
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou e, N C
D O
T
AB
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou
R ai lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur
P te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
0+00 11892 Road Work Begins at Junction with 420 1 0 33 0 33 0 33
NFSR 420-06, State Line
Station
Schedule of Work
0+00 11892 Road Work Begins at Junction with 420-1 0.33 0.33 0.33
0+00 11892 Clear and Grub Trail Section as Required in Plans 4.1
0+00 11892
Grade Roadway. Widen Road as necessary for 12' Width Minimum.
Where Possible Excavate Berm to Gain Width. Use Excavated Material for Embankment Construction to Build up Entrenched Portions of Roadway.
Widen Curves as Described on this Schedule of Work 2.3
0+00 11892 Recondition Roadway
0+00 11892 Seed Disturbed Areas Along Road
0+13 Existing Rolling Dip
0+26 Existing Gate
1+02 Regrade And Armor Existing Rolling Dip 8 1+94 Regrade And Armor Existing Rolling Dip 8 2+72 Regrade And Armor Existing Rolling Dip 8 3+72 Existing Rolling Dip
4+76 Regrade And Armor Existing Rolling Dip 8 5+66 Regrade And Armor Existing Rolling Dip 85+66 Regrade And Armor Existing Rolling Dip 8 6+34 Regrade And Armor Existing Rolling Dip 8 7+46 Regrade And Armor Existing Rolling Dip 8 8+74 Regrade And Armor Existing Rolling Dip 8 9+54 Install Rolling Dip 5 1 8
10+20 Intersection of Parking on Right
10+34 Regrade And Armor Existing Rolling Dip 8 10+74 Regrade And Armor Existing Rolling Dip 8 11+00 Existing Rolling Dip
11+82 Existing Rolling Dip
12+70 Existing Rolling Dip
13+41 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30
13+41 11892
Construct Roadside Ditch with Ditch Blocks every 50'. Shed water where possible. 10551 160
13+62 Existing Rolling Dip
14+26 Existing Rolling Dip
14+80 Existing Rolling Dip
15+76 Regrade And Armor Existing Rolling Dip 8 16+54 Existing Rolling Dip
17+14 Existing Rolling Dip
17+60 Existing Rolling Dip
18+00 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-06, State Line
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T
AB
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work
20+06 Regrade And Armor Existing Rolling Dip 8 20+58 Regrade And Armor Existing Rolling Dip 820+58 Regrade And Armor Existing Rolling Dip 8 21+16 Regrade And Armor Existing Rolling Dip 8 22+16 Regrade And Armor Existing Rolling Dip 8 23+50 Existing Rolling Dip
23+98 Existing Rolling Dip
24+64 Existing Rolling Dip
25+46 Existing Rolling Dip
26+14 Existing Rolling Dip
26+74 Regrade And Armor Existing Rolling Dip 8 27+30 Existing Rolling Dip
27+84 Existing Rolling Dip
28+16 Existing Rolling Dip
28+84 Existing Rolling Dip
29+48 Regrade And Armor Existing Rolling Dip 8 30+12 Existing Rolling Dip
30+70 Existing Rolling Dipg g
31+56 Existing Rolling Dip
31+90 Existing Rolling Dip
32+48 Existing Rolling Dip
33+40 Existing Rolling Dip
33+76 Regrade And Armor Existing Rolling Dip 8 34+10 Existing Rolling Dip
34+58 Existing Rolling Dip
35+38 Existing Rolling Dip
36+12 Existing Rolling Dip
36+62 Existing Rolling Dip
37+32 Existing Rolling Dip
38+30 Regrade And Armor Existing Rolling Dip 8 38+84 Regrade And Armor Existing Rolling Dip 8 39+26 Existing Rolling Dip
40+12 Regrade And Armor Existing Rolling Dip 8 41+10 Existing Rolling Dip
42+00 Existing Rolling Dip
42+65 4315 Taper Roadway Width from 12' to 30'
42+70 Existing Rolling Dip
43+15 4470 Widen Curve in Cut to a Roadway Width of 30'
44+00 Regrade And Armor Existing Rolling Dip 8 44+70 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T
AB
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work
44+70 4520 Taper Roadway Width from 30' to 12'44 70 4520 Taper Roadway Width from 30 to 12
44+96 Existing Rolling Dip
45+64 Existing Rolling Dip
46+50 Existing Rolling Dip
47+40 Existing Rolling Dip
48+80 Existing Rolling Dip
50+00 Existing Rolling Dip
50+54 Regrade And Armor Existing Rolling Dip 8 51+26 Regrade And Armor Existing Rolling Dip 8 52+06 Install Rolling Dip 5 1 8 52+86 Regrade And Armor Existing Rolling Dip 8 53+88 Regrade And Armor Existing Rolling Dip 8 54+56 Existing Rolling Dip
55+80 Regrade And Armor Existing Rolling Dip 8 56+42 Regrade and Armor Existing Sag 8 56+86 Regrade And Armor Existing Rolling Dip 8 57+49 Install Rolling Dip 5 1 8 58+12 Regrade And Armor Existing Rolling Dip 8 58+50 Regrade And Armor Existing Rolling Dip 8 59+22 Replace Existing Culvert with 24"x 30' CMP 7 1 4 16 30 59+84 Existing Rolling Dip
60+66 Existing Rolling Dip
61+40 Regrade And Armor Existing Rolling Dip 8 62+44 Regrade And Armor Existing Rolling Dip 8 62+92 Regrade And Armor Existing Rolling Dip 8 63+38 Regrade And Armor Existing Rolling Dip 8 63+98 Regrade And Armor Existing Rolling Dip 8 64+96 Regrade And Armor Existing Rolling Dip 8 65+70 Regrade And Armor Existing Rolling Dip 8 66+30 Regrade And Armor Existing Rolling Dip 8 67+04 Regrade And Armor Existing Rolling Dip 8 67+50 Existing Rolling Dip
68+18 8 68+88 Regrade And Armor Existing Rolling Dip 8
69+85 Existing Rolling Dip
70+38 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T
AB
C , C om pa ct io n M et ho d A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, b ac kf ill c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
NFSR 420-06, State Line
Station
Schedule of Work
71+06 Regrade And Armor Existing Rolling Dip 8 71+66 Regrade And Armor Existing Rolling Dip 871+66 Regrade And Armor Existing Rolling Dip 8 72+34 Regrade And Armor Existing Rolling Dip 8 73+04 Existing Rolling Dip
73+46 Existing Rolling Dip
74+14 Existing Rolling Dip
75+04 Existing Rolling Dip
75+94 Existing Rolling Dip
76+78 Existing Rolling Dip
77+40 18' X 20' CMP
77+94 Existing Rolling Dip
78+96 Existing Rolling Dip
80+16 Existing Rolling Dip
80+96 Existing Rolling Dip
81+88 Regrade and Armor Existing Sag 8
82+54 Existing Rolling Dip
83+28 Regrade And Armor Existing Rolling Dip 883 28 g g g
83+84 Existing Rolling Dip
84+70 Existing Rolling Dip
85+24 Existing Rolling Dip
86+10 Existing Rolling Dip
87+10 Existing Rolling Dip
88+34 Regrade And Armor Existing Rolling Dip 8
89+42 Regrade And Armor Existing Rolling Dip 8
89+68 Regrade and Armor Existing Sag 8
91+02 Regrade and Armor Existing Sag 8
91+40 Existing Rolling Dip
91+94 Regrade and Armor Existing Sag 8
92+96 Existing Rolling Dip
93+94 Regrade And Armor Existing Rolling Dip 8
94+88 Existing Rolling Dip
95+92 Install Rolling Dip 5 1 16
96+96 Existing Rolling Dip
96+70 Existing Rolling Dip
98+20 Existing Rolling Dip
98+98 Existing Rolling Dip
99+28 Existing Rolling Dip
100+48 Existing Rolling Dip
101+00 Existing Rolling Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
st ak in g an d op e
S ta ki ng le ra nc e B
G ru bb in g
C ul ve rts ca va tio n, uc tio n
C on st ru ct io n
R ec on st ru ct io n on st ru ct io n ap C on st ru ct io n lit er at io n, M et ho d ng p, C la ss
B ur fa ce c ou
, C om pa ct io n ur fa ce c ou as t, C om pa ct io n di on in g
C ul ve rt, G au ge in iz ed -S te el
T yp e m pa ct io n m et ho d b
B ot to m
S tru ct cl ud in g fo ot in gs nd o bj ec t m ar ke rs
B ot to m
S tru ct cl ud in g fo ot in gs nd o bj ec t m ar ke rs dr au lli c
M et ho d ra ffi c C on tro l
C lo su re
G at e
NFSR 420-06, State Line Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n s su rv ey in g, S lo M et ho d I, To le
S ilt
F en ce
H ay
B al es
C le ar in g an d
R em ov al o f C
D ra in ag e ex c D itc h co ns tru c
R ol lin g
D ip
C o
R ol lin g
D ip
R e
W at er B ar C o
S ed im en t T ra
R oa dw ay
O bl
Li ne ar G ra di n
P la ce d
R ip ra p
A gg re ga te s u N
C D
O T
AB
C
M et ho d A
A gg re ga te s u R ai lro ad B al la
M et ho d
A
R oa d R ec on d
-in ch P ip e
C (0
.0
) A lu m i
2, b ac kf ill c om
' x
' O pe n
P la te A rc h in c he ad w al ls a nd
' x
' O pe n
P la te A rc h in c he ad w al ls a nd
S ee di ng
, H yd
Te m po ra ry T r
In st al l R oa d
C
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Begin End Description of Work
Station
102+24 Install Rolling Dip 5 1 8 103+48 Existing Rolling Dip
104+08 Existing Rolling Dip
104+68 Existing Rolling Dip
105+32 Existing Rolling Dip
105+96 Existing Rolling Dip
106+66 Existing Rolling Dip
107+44 Existing Rolling Dip
108+28 Existing Rolling Dip
108+84 Existing Rolling Dip
109+28 Existing Rolling Dip109 28 Existing Rolling Dip
110+06 Existing Rolling Dip
110+70 Existing Rolling Dip
111+32 Existing Rolling Dip
112+00 18" x 20' CMP
112+14 Regrade and Armor Existing Sag 8 113+00 Regrade and Armor Existing Sag 8 114+70 Rolling Dip
115+36 Regrade and Armor Existing Sag 8 116+14 Install Rolling Dip 5 1 8
116+92 Regrade and Armor Existing Sag 8
117+62 Existing Rolling Dip
118+18 Existing Rolling Dip
118+54 Regrade and Armor Existing Sag 8 118+92 Regrade and Armor Existing Sag 8 11900 Install Closure Gate at End of Road 1
0.33 0.33 0.00 44.00 4.10 2.00 ####### 6.00 0.00 0.00 0.00 0.00 2.30 8.00 32.00 688.00 0.00 60.00 0.00 0.00 0.00 0.33 1.00
26U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
NFSR 420-06, State Line
Total Quantity of Work:
FOREST SERVICE
REGION 8
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
0+00 Begin Work at Intersection with 420-1 0 0 0
0+00 13526 Clear Roadway in Accordance with Design Typicals 3 2
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin
0+00 13526 Typicals 3.2
0+00 13526 Grade Roadway. Widen Roadway as Necessary to Specified Widths. 0 2.6
0+00 13526 Use Excavated Material From Widening to Build up Roadway in Entrenched Sections
0+00 13526 Recondition Roadway 1.8
0+00 13526 Seed Disturbed Areas 4.7
0+00 13526 Construct Roadside Ditch with Ditch Blocks every 50'. Shed water where possible. 13526 208
0+21 Regrade and Armor Rolling Dip 8
0+60 Install Gate 1
1+26 Install Rolling Dip 5 1 8
2+31 Install Rolling Dip 5 1 8
3+36 Regrade and Armor Rolling Dip 8
4+03 Install Rolling Dip 5 1 8
4+69 Regrade and Armor Rolling Dip 8
5+30 Install Rolling Dip 5 1 8
5+93 Regrade and Armor Rolling Dip 8
7+05 Regrade and Armor Rolling Dip 8
7+54 Install Rolling Dip 5 1 8
8+03 Regrade and Armor Rolling Dip 8
9+00 Install Rolling Dip 5 1 8
10+00 Install Rolling Dip 5 1 8
11+00 Install Rolling Dip 5 1 8
12+00 Install Rolling Dip 5 1 8
13+06 Regrade and Armor Rolling Dip 8
13+74 Regrade and Armor Rolling Dip 8
14+61 Regrade and Armor Rolling Dip 8
15+26 Regrade and Armor Rolling Dip 8
15+96 Regrade and Armor Rolling Dip 8
17+01 Regrade and Armor Rolling Dip 8
18+24 Regrade and Armor Rolling Dip 8
20+54 Regrade and Armor Rolling Dip 8
21+72 Regrade and Armor Rolling Dip 8
22+92 Regrade and Armor Rolling Dip 8
23+94 Install Rolling Dip 5 1 8
24+97 Install Rolling Dip 5 1 8
25+99 Regrade and Armor Rolling Dip 8
26+74 Install Rolling Dip 5 1 8
27+48 Regrade and Armor Rolling Dip 8
28+69 Install Rolling Dip 5 1 8
29+89 Regrade and Armor Rolling Dip 8
31+06 Regrade and Armor Rolling Dip 8
31+96 Install Rolling Dip 5 1 8
32+86 Regrade and Armor Rolling Dip 8
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
NFSR 420-02, Tipton Knob
S h d l f W k 55REGION 8 Q
UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin
40+77 Regrade and Armor Rolling Dip 840 77 Regrade and Armor Rolling Dip 8
41+67 Regrade and Armor Rolling Dip 8
43+12 Regrade and Armor Rolling Dip 8
43+85 Install Rolling Dip 5 1 8
44+57 Regrade and Armor Rolling Dip 8
45+12 Regrade and Armor Rolling Dip 8
45+82 Regrade and Armor Rolling Dip 8
46+37 Regrade and Armor Rolling Dip 8
47+14 Install Rolling Dip 5 1 8
47+91 Regrade and Armor Rolling Dip 8
48+51 Regrade and Armor Rolling Dip 8
49+29 Install Rolling Dip 5 1 8
50+06 Regrade and Armor Rolling Dip 8
51+03 Install Rolling Dip 5 1 8
52+00 Regrade and Armor Rolling Dip 8
53+31 Regrade and Armor Rolling Dip 853+31 g g p 8
54+38 Regrade and Armor Rolling Dip 8
55+02 Regrade and Armor Rolling Dip 8
56+11 Regrade and Armor Rolling Dip 8
56+96 Regrade and Armor Rolling Dip 8
57+83 Regrade and Armor Rolling Dip 8
58+55 Regrade and Armor Rolling Dip 8
59+40 Regrade and Armor Rolling Dip 8
60+84 Regrade and Armor Rolling Dip 8
62+09 Install Rolling Dip 5 1 8
63+35 Install Rolling Dip 5 1 8
64+60 Regrade and Armor Rolling Dip 8
66+58 Grade Out Mudhole and Construct Rolling Dip
67+54 Regrade and Armor Rolling Dip 8
68+36 Regrade and Armor Rolling Dip 8
69+77 Regrade and Armor Rolling Dip 869+77 g g p 8
71+22 Install Rolling Dip 5 1 8
72+67 Regrade and Armor Rolling Dip 8
73+56 Install Rolling Dip 5 1 8
74+45 Regrade and Armor Rolling Dip 8
75+43 Install Rolling Dip 5 1 8
76+40 Regrade and Armor Rolling Dip 8
78+00 Install Rolling Dip 5 1 8
79+73 Regrade and Armor Rolling Dip 8
80+55 Regrade and Armor Rolling Dip 8
81+90 Install Rolling Dip 5 1 8
83+30 Regrade and Armor Rolling Dip 8
85+02 Regrade and Armor Rolling Dip 8
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-02, Tipton Knob
Schedule of Work 55REGION 8 UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin
86+04 Install Rolling Dip 5 1 886 04 Install Rolling Dip 5 1 8
87+05 Regrade and Armor Rolling Dip 8
89+41 Regrade and Armor Rolling Dip 8
89+90 Regrade and Armor Rolling Dip 8
90+96 Install Rolling Dip 5 1 8 94+01 Existing Dip
95+01 Existing Culvert
95+76 Existing Dip
96+76 Install Rolling Dip 1 8 97+76 Existing Culvert
98+86 Existing Dip
99+86 Install Rolling Dip 1 8 100+86 Existing Dip
102+16 Install Rolling Dip 1 8 103+46 Existing Dip
104+34 Install Rolling Dip 1 88 105+21 Existing Dip
106+43 Install Rolling Dip 1 8 107+64 Install Rolling Dip 1 8 108+86 Replace Existing Culvert with 24"x30' CMP 5 1 4 16 30
109+36 Existing Dip
110+66 Existing Dip
112+06 Existing Dip
113+34 Install Rolling Dip 1 8 114+61 Existing Culvert
115+54 Install Rolling Dip 1 8 116+48 Install Rolling Dip 1 8 117+41 Existing Dip
119+06 Existing Culvert
119+51 Existing Dip
120+81 Install Rolling Dip 1 4 16 8g p 8 122+11 Replace Existing Culvert with 24"x30' CMP 5 1 30
123+56 Existing Culvert
125+11 Existing Dip
126+39 Install Rolling Dip 1 8 127+66 Existing Dip
128+56 Install Rolling Dip 1 8 129+46 Existing Dip
129+96 Replace Existing Culvert with 24"x30' CMP 5 1 4 16 30 131+36 Install Rolling Dip 1 8 132+76 Replace Existing Culvert with 24"x30' CMP 5 1 4 16 30
132+96 Existing Dip
134+26 Existing Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .