Exhibit 1 - Drawings Rev_1.pdf
PDF 5 MB Posted
- Solicitation number
- AG-4419-S-10-0470
About this file
Exhibit 1 - Drawings rev 1
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FP-03, Supplemental Specifications for
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou rs e, N C
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou
R ai lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp e 2, ba ck fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct ur al
P la te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
0+00 Begin Work at Intersection with 420-1 0 0 0
0+00 13526 Clear Roadway in Accordance with Design Typicals 3 2
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin
0+00 13526 Typicals 3.2
0+00 13526 Grade Roadway. Widen Roadway as Necessary to Specified Widths. 0 2.6
0+00 13526 Use Excavated Material From Widening to Build up Roadway in Entrenched Sections
0+00 13526 Recondition Roadway 1.8
0+00 13526 Seed Disturbed Areas 4.7
0+00 13526 Construct Roadside Ditch with Ditch Blocks every 50'. Shed water where possible. 13526 208
0+21 Regrade and Armor Rolling Dip 8
0+60 Install Gate 1
1+26 Install Rolling Dip 5 1 8
2+31 Install Rolling Dip 5 1 8
3+36 Regrade and Armor Rolling Dip 8
4+03 Install Rolling Dip 5 1 8
4+69 Regrade and Armor Rolling Dip 8
5+30 Install Rolling Dip 5 1 8
5+93 Regrade and Armor Rolling Dip 8
7+05 Regrade and Armor Rolling Dip 8
7+54 Install Rolling Dip 5 1 8
8+03 Regrade and Armor Rolling Dip 8
9+00 Install Rolling Dip 5 1 8
10+00 Install Rolling Dip 5 1 8
11+00 Install Rolling Dip 5 1 8
12+00 Install Rolling Dip 5 1 8
13+06 Regrade and Armor Rolling Dip 8
13+74 Regrade and Armor Rolling Dip 8
14+61 Regrade and Armor Rolling Dip 8
15+26 Regrade and Armor Rolling Dip 8
15+96 Regrade and Armor Rolling Dip 8
17+01 Regrade and Armor Rolling Dip 8
18+24 Regrade and Armor Rolling Dip 8
20+54 Regrade and Armor Rolling Dip 8
21+72 Regrade and Armor Rolling Dip 8
22+92 Regrade and Armor Rolling Dip 8
23+94 Install Rolling Dip 5 1 8
24+97 Install Rolling Dip 5 1 8
25+99 Regrade and Armor Rolling Dip 8
26+74 Install Rolling Dip 5 1 8
27+48 Regrade and Armor Rolling Dip 8
28+69 Install Rolling Dip 5 1 8
29+89 Regrade and Armor Rolling Dip 8
31+06 Regrade and Armor Rolling Dip 8
31+96 Install Rolling Dip 5 1 8
32+86 Regrade and Armor Rolling Dip 8
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
NFSR 420-02, Tipton Knob
S h d l f W k 55REGION 8 Q
UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin
40+77 Regrade and Armor Rolling Dip 840 77 Regrade and Armor Rolling Dip 8
41+67 Regrade and Armor Rolling Dip 8
43+12 Regrade and Armor Rolling Dip 8
43+85 Install Rolling Dip 5 1 8
44+57 Regrade and Armor Rolling Dip 8
45+12 Regrade and Armor Rolling Dip 8
45+82 Regrade and Armor Rolling Dip 8
46+37 Regrade and Armor Rolling Dip 8
47+14 Install Rolling Dip 5 1 8
47+91 Regrade and Armor Rolling Dip 8
48+51 Regrade and Armor Rolling Dip 8
49+29 Install Rolling Dip 5 1 8
50+06 Regrade and Armor Rolling Dip 8
51+03 Install Rolling Dip 5 1 8
52+00 Regrade and Armor Rolling Dip 8
53+31 Regrade and Armor Rolling Dip 853+31 g g p 8
54+38 Regrade and Armor Rolling Dip 8
55+02 Regrade and Armor Rolling Dip 8
56+11 Regrade and Armor Rolling Dip 8
56+96 Regrade and Armor Rolling Dip 8
57+83 Regrade and Armor Rolling Dip 8
58+55 Regrade and Armor Rolling Dip 8
59+40 Regrade and Armor Rolling Dip 8
60+84 Regrade and Armor Rolling Dip 8
62+09 Install Rolling Dip 5 1 8
63+35 Install Rolling Dip 5 1 8
64+60 Regrade and Armor Rolling Dip 8
66+58 Grade Out Mudhole and Construct Rolling Dip
67+54 Regrade and Armor Rolling Dip 8
68+36 Regrade and Armor Rolling Dip 8
69+77 Regrade and Armor Rolling Dip 869+77 g g p 8
71+22 Install Rolling Dip 5 1 8
72+67 Regrade and Armor Rolling Dip 8
73+56 Install Rolling Dip 5 1 8
74+45 Regrade and Armor Rolling Dip 8
75+43 Install Rolling Dip 5 1 8
76+40 Regrade and Armor Rolling Dip 8
78+00 Install Rolling Dip 5 1 8
79+73 Regrade and Armor Rolling Dip 8
80+55 Regrade and Armor Rolling Dip 8
81+90 Install Rolling Dip 5 1 8
83+30 Regrade and Armor Rolling Dip 8
85+02 Regrade and Armor Rolling Dip 8
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
NFSR 420-02, Tipton Knob
Schedule of Work 55REGION 8 UPPER TELLICO ROADS RECONSTRUCTION Schedule of Work
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin
86+04 Install Rolling Dip 5 1 886 04 Install Rolling Dip 5 1 8
87+05 Regrade and Armor Rolling Dip 8
89+41 Regrade and Armor Rolling Dip 8
89+90 Regrade and Armor Rolling Dip 8
90+96 Install Rolling Dip 5 1 8 94+01 Existing Dip
95+01 Existing Culvert
95+76 Existing Dip
96+76 Install Rolling Dip 1 8 97+76 Existing Culvert
98+86 Existing Dip
99+86 Install Rolling Dip 1 8 100+86 Existing Dip
102+16 Install Rolling Dip 1 8 103+46 Existing Dip
104+34 Install Rolling Dip 1 88 105+21 Existing Dip
106+43 Install Rolling Dip 1 8 107+64 Install Rolling Dip 1 8 108+86 Replace Existing Culvert with 24"x30' CMP 5 1 4 16 30
109+36 Existing Dip
110+66 Existing Dip
112+06 Existing Dip
113+34 Install Rolling Dip 1 8 114+61 Existing Culvert
115+54 Install Rolling Dip 1 8 116+48 Install Rolling Dip 1 8 117+41 Existing Dip
119+06 Existing Culvert
119+51 Existing Dip
120+81 Install Rolling Dip 1 4 16 8g p 8 122+11 Replace Existing Culvert with 24"x30' CMP 5 1 30
123+56 Existing Culvert
125+11 Existing Dip
126+39 Install Rolling Dip 1 8 127+66 Existing Dip
128+56 Install Rolling Dip 1 8 129+46 Existing Dip
129+96 Replace Existing Culvert with 24"x30' CMP 5 1 4 16 30 131+36 Install Rolling Dip 1 8 132+76 Replace Existing Culvert with 24"x30' CMP 5 1 4 16 30
132+96 Existing Dip
134+26 Existing Dip
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Pressley Fields Timber Sale
M ob ili za tio n
C on st ru ct io n st ak in g an d su rv ey in g, S lo pe S ta ki ng
M et ho d
I, To le ra nc e
B
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb in g
R em ov al o f C ul ve rts
D ra in ag e ex ca va tio n, D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru ct io n
R ol lin g
D ip
R ec on st ru ct io n
W at er B ar C on st ru ct io n
S ed im en t T ra p C on st ru ct io n
B la st in g
R oa dw ay
O bl ite ra tio n, M et ho d
Li ne ar G ra di ng
P la ce d
R ip ra p, C la ss B
A gg re ga te s ur fa ce c ou
D O
T A
B C
, C om pa ct io n
M et ho d
A
A gg re ga te s ur fa ce c ou lro ad
B al la st
, C om pa ct io n
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt, G au ge
(0 .0
) A lu m in iz ed -S te el
T yp fil l c om pa ct io n m et ho d b
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
' x
' O pe n
B ot to m
S tru ct te A rc h in cl ud in g fo ot in gs he ad w al ls a nd o bj ec t m ar ke rs
S ee di ng
, H yd ra ul lic M et ho d
Te m po ra ry T ra ffi c C on tro l
In st al l R oa d
C lo su re
G at e
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
Schedule of WorkNFSR 420-02, Tipton Knob
Station
EndBegin 135+26 Existing Dip
135+26 Install Gate at Junction of TN 402 1.0 142+01 Rock Garden
142+01 16726 Install Silt Fence Along Toe of Bank 2300 142+01 16726 Obliterate Roadway 0.5 142+01 16726 Recontour and Stabilize Road Banks
142+01 16726 Ssed Entire Trail Template 0.9 167+30 Install Gate 142+66 Install Water Bar 5 1 1 8 143+31 Regrade and Armor Existing Dip 1 8 143+64 Install Water Bar 5 1 1 8 143+96 Regrade and Armor Existing Dip 1 8 144+16 Regrade and Armor Existing Dip 1 8 144+46 Install Water Bar 5 1 1 8 144+76 Regrade and Armor Existing Dip 1 8 145+24 Install Water Bar 5 1 1 85 1 1 8 145+71 Existing Rolling Dip
146+01 Install Water Bar 5 1 1 8 146+31 Regrade and Armor Existing Dip 1 8 146+81 Regrade and Armor Existing Dip 1 8 147+16 Install Water Bar 5 1 1 8 147+51 Regrade and Armor Existing Dip 1 8 147+93 Install Water Bar 5 1 1 8 148+34 Install Water Bar 5 1 1 8 148+76 Regrade and Armor Existing Dip 1 8 149+30 Install Water Bar 5 1 1 8 149+86 Regrade and Armor Existing Dip 1 8 150+26 Regrade and Armor Existing Dip 1 8 150+91 Regrade and Armor Existing Dip 1 8 151+40 Install Water Bar 5 1 1 8 151+89 Install Water Bar 5 1 1 85 1 1 8 152+38 Regrade and Armor Existing Dip 1 8 152+67 Install Water Bar 5 1 1 8 152+95 Regrade and Armor Existing Dip 1 8 153+47 Install Water Bar 5 1 1 8 153+98 Regrade and Armor Existing Dip 1 8 154+32 Install Water Bar 5 1 1 8 154+65 Regrade and Armor Existing Dip 1 8 155+06 Install Water Bar 5 1 1 8 155+46 Regrade and Armor Existing Dip 1 8 155+80 Install Water Bar 5 1 1 8 156+13 Regrade and Armor Existing Dip 1 8 156+86 Regrade and Armor Existing Dip 1 8
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Specifications for g an d ak in g, B in g s n, ct io n tru ct io n ct io n st ru ct io n on , M et ho d ss B co ur se pa ct io n co ur se om pa ct io n rt, G au ge
S te el
T yp m et ho d b m S tru ct g fo ot in gs ct m ar ke rs m S tru ct g fo ot in gs ct m ar ke rs
M et ho d
C on tro l e G at e
Schedule of WorkNFSR 420-02, Tipton Knob
Specifications for Pressley Fields Timber
Sale
M ob ili za tio n
C on st ru ct io n st ak in g su rv ey in g, S lo pe S ta M et ho d I, To le ra nc e
S ilt
F en ce
H ay
B al es
C le ar in g an d G ru bb i
R em ov al o f C ul ve rt s
D ra in ag e ex ca va tio n
D itc h co ns tru ct io n
R ol lin g
D ip
C on st ru c
R ol lin g
D ip
R ec on st r
W at er B ar C on st ru ct
S ed im en t T ra p C on s
B la st in g
R oa dw ay
O bl ite ra ti o
Li ne ar G ra di ng
P la ce d
R ip ra p, C la s s
A gg re ga te s ur fa ce c
N C
D O
T A
B C
, C om p M et ho d A
A gg re ga te s ur fa ce c
R ai lro ad
B al la st
, C o
M et ho d
A
R oa d R ec on di on in g
-in ch P ip e
C ul ve rt
(0 .0
) A lu m in iz ed -S ba ck fil l c om pa ct io n m
' x
' O pe n
B ot to m
P la te A rc h in cl ud in g he ad w al ls a nd o bj e c
' x
' O pe n
B ot to m
P la te A rc h in cl ud in g he ad w al ls a nd o bj e c
S ee di ng
, H yd ra ul lic
Te m po ra ry T ra ffi c C o
In st al l R oa d
C lo su re
Item Number: 15101 15201 15702 15707 20101 20301 20419 20426a 20426b 20426c 20426d 20503 21103 21201 25102 30109a 30109b 30301 60201A 60201B 60201C 62501 63501 65001
Unit of Measure: LS LS LF EA AC EA Foot Each Each Each Each LS Mile Mile Ton Ton Ton Mile LF LF LF AC LS EA
Description of Work
Station
EndBegin 157+14 Install Water Bar 5 1 1 8 157+41 Regrade and Armor Existing Dip 1 8 158+00 Install Water Bar 5 1 1 8 158+75 Install Water Bar 5 1 1 8 159+15 Install Water Bar 5 1 1 8 159+61 Regrade and Armor Existing Dip 1 8 160+05 Install Water Bar 5 1 1 8160+05 Install Water Bar 5 1 1 8 160+51 Regrade and Armor Existing Dip 1 8 160+80 Install Water Bar 5 1 1 8 161+11 Regrade and Armor Existing Dip 1 8 1 161+56 Regrade and Armor Existing Dip 1 8 161+66 Regrade and Armor Existing Dip 1 8 162+41 Regrade and Armor Existing Dip 1 8 162+76 Regrade and Armor Existing Dip 1 8 163+31 Regrade and Armor Existing Dip 1 8 164+13 Regrade and Armor Existing Dip 1 8 164+71 Regrade and Armor Existing Dip 1 8 165+28 Install Water Bar 5 1 1 8 165+86 Install Water Bar 5 1 1 8 166+43 Regrade and Armor Existing Dip 1 8
166+80 Install Water Bar 5 1 1 8 166+90 Install Gate166+90 Install Gate
167+26 End of Road Work at Northern Junction with NFSR 420
Total Quantity of Work: 0 0 2300 280 3 4 13526 40 30 25 25 0 1 2.6 16 64 1408 2 120 0 0 7 0 2
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 8
NATIONAL FORESTS OF NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
UPPER TELLICO ROADS RECONSTRUCTION
Schedule of Work
| 01.pdf |
| 01 |
| 02 |
| 03 |
| 04 |
| 05 |
| 06 |
| 07 |
| 14 |
| 15 |
| 16 |
| 17 |
| 20 |
| 21 |
| 27 |
| 28 |
| 29 |
| 30 |
| 31 |
| 32 |
| 33 |
| 34 |
| 35 |
| 36 |
| 37 |
| 38 |
| 39 |
| 40 |
| 41 |
| 42 |
| 43 |
| 44 |
| 45 |
| 46 |
| 47 |
| 48 |
| 49 |
| 50 |
| 55 |
File details come from the government source that posted it. Updated .