Section B-6 -Yellow Mtn. Sched. Rev .pdf
PDF 55 KB Posted
- Solicitation number
- AG-4419-S-10-0433
About this file
Section B-6 -Yellow Mtn. Sched. Rev .
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 3.pdf | ||
| SF30 Amendment 2.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| Pre-bid meeting list.pdf | ||
| SF30 Amendment 1.pdf | ||
| Section B-2 - Joanna Bald Sched Rev.pdf | ||
| Exhibit 1 - Drawings_ Supp. Specifications.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-7 - Schedule of Items - Option Items.xls | XLS spreadsheet | |
| Section B-6 - Schedule of Items - Yellow Mtn.xls | XLS spreadsheet | |
| Attachment 1 - Specifications.pdf | ||
| Section B-3 - Schedule of Items - Cowee Bald.xls | XLS spreadsheet | |
| Section B-2 - Schedule of Items - Joanna Bald.xls | XLS spreadsheet | |
| Section B-5 - Sched.of Items - Wauchecha Bald.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID ITEMS
Method of
Measurement Quantity Units Unit Price Amount
25 DQ 1 LS $_________
A. Remove Roof Tie-Down Cable System
DQ 400 LF $________ $_________
B. Remove Metal Roof System DQ 4 SQ $________ $_________
C. Remove Door & Frame DQ 1 EA $________ $_________ D. Remove Interior Siding LS 1 EA $________ $_________
A. Install Standing Seam Metal
Roof System
DQ 4 SQ $________ $_________
B. Install Roof Cable Anchor System
DQ 400 LF $________ $_________
C. Paint Interior & Exterior of Cab, Handrails, Ceiling, Access Ladder, Door& Frame
AQ 1802 SF $________ $_________
D. Install Door & Door Frame & Hardware
DQ 1 EA $________ $_________
E. Replace existing interior siding w/ new 1"x4' T&G cypress Finish Wall-continous all 4 sides
DQ 1 LS $_________
A. Install Complete System-Air
Terminals to Weatherhead
DQ 1 LS $________ $_________
B. Install Downlead Cable/Conduit- Weatherhead to Ground
AQ 20 LF $________ $_________
C. Install Ground Loop Conductor System
DQ 100 LS $________ $_________
Total for lines 25-28 $________
DEMOLITION
REPAIR FIRE TOWER CAB
REPAIR LIGHTNING
BASE BID SCHEDULE
Yellow Mountain Fire Tower
Restoration & Repairs - ARRA Project CIM-0811-62F
* Pay Item Description
MOBILIZATION
* Bidders must provide prices on all base bid items and option items to be considered for award. One award will be made from this solicitation.
* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made
Yellow Mtn. Bid Schedule