Section B-5 - Sched.of Items - Wauchecha Bald.xls
XLS spreadsheet 27 KB Posted
- Solicitation number
- AG-4419-S-10-0433
About this file
Section B-5 - Schedule of items - Wauchecha Bald
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 3.pdf | ||
| SF30 Amendment 2.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| Pre-bid meeting list.pdf | ||
| Section B-6 -Yellow Mtn. Sched. Rev .pdf | ||
| SF30 Amendment 1.pdf | ||
| Section B-2 - Joanna Bald Sched Rev.pdf | ||
| Exhibit 1 - Drawings_ Supp. Specifications.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-7 - Schedule of Items - Option Items.xls | XLS spreadsheet | |
| Section B-6 - Schedule of Items - Yellow Mtn.xls | XLS spreadsheet | |
| Attachment 1 - Specifications.pdf | ||
| Section B-3 - Schedule of Items - Cowee Bald.xls | XLS spreadsheet | |
| Section B-2 - Schedule of Items - Joanna Bald.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BASE BID SCHEDULE | |||||||
| Wauchecha Bald Fire Tower | |||||||
| Restoration & Repairs | |||||||
| BASE BID ITEMS | |||||||
| * Pay Item Description | Method of Measurement | Qty | Units | Unit Price | Amount | ||
| 22 | MOBILIZATION | DQ | 1 | LS | $_________ | ||
| 23 | DEMOLITION | ||||||
| A. | Remove Floor Joists& Blocking | DQ | 238 | LF | $_______ | $_________ | |
| B. | Remove Subfloor & Finish Floor(multiple layers) | DQ | 196 | SF | $_______ | $_________ | |
| C. | Remove interior wooden wall framing | DQ | 540 | SF | $_______ | $_________ | |
| D. | Remove Interior Wallboard, Insulation | DQ | 243 | SF | $_______ | $_________ | |
| E. | Remove Ceiling Finish Material, Insulation | DQ | 196 | SF | $_______ | $_________ | |
| 24 | REPAIR FIRE TOWER CAB | ||||||
| A. | Install Floor Joists, Blocking, Perimeter Boards(PT 2"x8") | AQ | 308 | LF | $_______ | $_________ | |
| B. | Install Aluminum Floor Grating(I Bar-11/16" C to C w/4" cross bars-1" Deep) | DQ | 196 | SF | $_______ | $_________ | |
| C. | Apply protective coating to Roof (Waterborne Polyamide Epoxy Primer & Acrylic Aliphatic Urethane Finish Coat) | AQ | 400 | SF | $_______ | $_________ | |
| Total for lines 22-24 | $_________ | ||||||
| * Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made | |||||||
| * Bidders must provide prices on all base bid items and option items to be considered for award. One award will be made from this solicitation. |