Section B-3 - Schedule of Items - Cowee Bald.xls
XLS spreadsheet 29 KB Posted
- Solicitation number
- AG-4419-S-10-0433
About this file
Section B-3 - Schedule of Items - Cowee Bald
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 3.pdf | ||
| SF30 Amendment 2.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| Pre-bid meeting list.pdf | ||
| Section B-6 -Yellow Mtn. Sched. Rev .pdf | ||
| SF30 Amendment 1.pdf | ||
| Section B-2 - Joanna Bald Sched Rev.pdf | ||
| Exhibit 1 - Drawings_ Supp. Specifications.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-7 - Schedule of Items - Option Items.xls | XLS spreadsheet | |
| Section B-6 - Schedule of Items - Yellow Mtn.xls | XLS spreadsheet | |
| Attachment 1 - Specifications.pdf | ||
| Section B-2 - Schedule of Items - Joanna Bald.xls | XLS spreadsheet | |
| Section B-5 - Sched.of Items - Wauchecha Bald.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BASE BID SCHEDULE | |||||||
| Cowee Bald Fire Tower | |||||||
| Restoration & Repairs | |||||||
| ARRA Project CIM-0811-62F | |||||||
| BASE BID ITEMS | |||||||
| * Pay Item Description | Method of Measurement | Qty | Units | Unit Price | Amount | ||
| 7 | MOBILIZATION | DQ | 1 | LS | $_________ | ||
| 8 | DEMOLITION | ||||||
| A. | Remove Chain Link Fence from Stairs, Landings, Catwalk | DQ | 250 | LF | $_________ | $_________ | |
| B. | Remove Stairway/Landing Wooden treads | DQ | 150 | LF | $_________ | $_________ | |
| C. | Remove Catwalk Decking/Nailers | AQ | 240 | LF | $_________ | $_________ | |
| D. | Remove Catwalk Rails, Posts,Braces | DQ | 328 | LF | $_________ | $_________ | |
| E. | Remove Door & Frame | DQ | 1 | EA | $_________ | $_________ | |
| F. | Remove Exterior Sheathing & Siding | DQ | 243 | SF | $_________ | $_________ | |
| G. | Remove Exterior Trim | DQ | 190 | LF | $_________ | $_________ | |
| H. | Remove Lightning Protection System | DQ | 1 | LS | $_________ | $_________ | |
| I. | Remove Asphalt Shingles | DQ | 400 | SF | $_________ | $_________ | |
| 9 | REPAIR FIRE TOWER | ||||||
| A. | Repair Concrete Footing | DQ | 3 | EA | $_________ | $_________ | |
| B. | Install Wooden Treads & Landing Decking(PT In Kind) | DQ | 150 | SF | $_________ | $_________ | |
| C. | Install Catwalk Deck(PT In Kind) | DQ | 144 | SF | $_________ | $_________ | |
| D. | Install Deck Nailers(PT IN Kind) | AQ | 67 | SF | $_________ | $_________ | |
| E. | Install Catwalk Wooden Railing System(PT-Replace Existing System in Kind) | DQ | 80 | LF | $_________ | $_________ | |
| F. | Install Chain Link Fence @ Handrail, Landings, Catwalk Rails | DQ | 320 | LF | $_________ | $_________ | |
| 10 | REPAIR FIRE TOWER CAB | ||||||
| A. | Install Exterior Sheathing(5/8" Ext Plywood) | AQ | 243 | SF | $_________ | $_________ | |
| B. | Install Exterior Finish Siding(Cypress 1'x6"-Drop Siding) | AQ | 243 | SF | $_________ | $_________ | |
| C. | Install Door & Frame(Hurricane Rated Fiberglass) | DQ | 1 | EA | $_________ | $_________ | |
| D. | Install Exterior Trim(Cypress) & Flashing | DQ | 190 | LF | $_________ | $_________ | |
| E. | Paint Exterior | DQ | 433 | SF | $_________ | $_________ | |
| F. | Install Standing Seam Roof System | AQ | 4 | SQ | $_________ | $_________ | |
| 11 | REPAIR LIGHTNING PROTECTION SYSTEM | ||||||
| A. Install Complete System-Air Terminals to Weatherhead | AQ | 1 | LS | $_________ | $_________ | ||
| B. Install Copper Downlead Cable/Rigid Galv. Conduit-Weatherhead to Ground Loop Conductor | AQ | 60 | LF | $_________ | $_________ | ||
| C. Install Copper Ground Loop Conductor System | AQ | 100 | LF | $_________ | $_________ | ||
| Total for lines 7-11 | $_________ | ||||||
| * Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made | |||||||
| * Bidders must provide prices on all base bid items and option items to be considered for award. One award will be made from this solicitation. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .