Section B-2 - Joanna Bald Sched Rev.pdf
PDF 60 KB Posted
- Solicitation number
- AG-4419-S-10-0433
About this file
Section B-2 - Joanna Bald Sched Rev.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 3.pdf | ||
| SF30 Amendment 2.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| Pre-bid meeting list.pdf | ||
| Section B-6 -Yellow Mtn. Sched. Rev .pdf | ||
| SF30 Amendment 1.pdf | ||
| Exhibit 1 - Drawings_ Supp. Specifications.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-7 - Schedule of Items - Option Items.xls | XLS spreadsheet | |
| Section B-6 - Schedule of Items - Yellow Mtn.xls | XLS spreadsheet | |
| Attachment 1 - Specifications.pdf | ||
| Section B-3 - Schedule of Items - Cowee Bald.xls | XLS spreadsheet | |
| Section B-2 - Schedule of Items - Joanna Bald.xls | XLS spreadsheet | |
| Section B-5 - Sched.of Items - Wauchecha Bald.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID ITEMS
* Pay Item Description Method of
Measurement Quantity Units Unit Price Amount
12 DQ 1 LS $_________
A. Remove Chain Link Fence from
Stairs, Landings
DQ 76 LF $_________ $_________
B. Remove Stairway/Landing Wooden treads/decking
DQ 115 LF $_________ $_________
C. Remove Door & Frame DQ 1 EA $_________ $_________ D. Remove Windows DQ 15 EA $_________ $_________ E. Remove Exterior Trim DQ 190 LF $_________ $_________ F. Remove Lightning Protection
System
DQ 1 LS $_________ $_________
G. Remove Asphalt Shingles,Underlayment,Etc
DQ 400 SF $_________ $_________
A. Install Wooden Treads & Landing
Decking(PT In-Kind)
AQ 125 SF $_________ $_________
B. Install Chain Link Fence @ Handrail, Landings
DQ 252 SF $_________ $_________
A. Install Door & Frame(Hurricane
Rated Fiberglass)
DQ 1 EA $_________ $_________
B. Install Refurbished Windows(Steel-Powder Coated)
DQ 15 EA $_________ $_________
C. Install Interior/Exterior Trim (Cypress)& Flashing
AQ 190 LF $_________ $_________
D. Paint Exterior AQ 433 SF $_________ $_________ E. Install Standing Seam Roof
System
DQ 4 SQ $_________ $_________
F. Painting of Interior Cab Upper and Lower Panels (wall finish).
DQ 1 LS $_________
G. Cut and Replace (Splice) Stair Handrail. Weld new (4 feet each side) of angle Iron to match existing. Grid to match existing transition.
DQ 1 LS $_________
REPAIR FIRE TOWER
REPAIR FIRE TOWER CAB
BASE BID SCHEDULE
Joanna Bald Fire Tower Restoration & Repairs
ARRA Project CIM-0811-62F
MOBILIZATION
DEMOLITION
H. Install Standing Seam Roof System
AQ 4 SQ $_________ $_________
A. Install Complete System-Air
Terminals to Weatherhead
DQ 1 LS $_________ $_________
B. Install Copper Downlead Cable/Rigid Galv. Conduit- Weatherhead to Ground Loop Conductor
AQ 60 LF $_________ $_________
C. Install Copper Ground Loop Conductor System
DQ 100 LS $_________ $_________
REPAIR LIGHTNING PROTECTION
* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made
TOTAL for lines 12-16
* Bidders must provide prices on all base bid items and option items to be considered for award.
One award will be made from this solicitation.
Joanna Bald Bid Schedule