Text version

BASE BID ITEMS

* Pay Item Description Method of

Measurement Quantity Units Unit Price Amount

12 DQ 1 LS $_________

A. Remove Chain Link Fence from

Stairs, Landings

DQ 76 LF $_________ $_________

B. Remove Stairway/Landing Wooden treads/decking

DQ 115 LF $_________ $_________

C. Remove Door & Frame DQ 1 EA $_________ $_________ D. Remove Windows DQ 15 EA $_________ $_________ E. Remove Exterior Trim DQ 190 LF $_________ $_________ F. Remove Lightning Protection

System

DQ 1 LS $_________ $_________

G. Remove Asphalt Shingles,Underlayment,Etc

DQ 400 SF $_________ $_________

A. Install Wooden Treads & Landing

Decking(PT In-Kind)

AQ 125 SF $_________ $_________

B. Install Chain Link Fence @ Handrail, Landings

DQ 252 SF $_________ $_________

A. Install Door & Frame(Hurricane

Rated Fiberglass)

DQ 1 EA $_________ $_________

B. Install Refurbished Windows(Steel-Powder Coated)

DQ 15 EA $_________ $_________

C. Install Interior/Exterior Trim (Cypress)& Flashing

AQ 190 LF $_________ $_________

D. Paint Exterior AQ 433 SF $_________ $_________ E. Install Standing Seam Roof

System

DQ 4 SQ $_________ $_________

F. Painting of Interior Cab Upper and Lower Panels (wall finish).

DQ 1 LS $_________

G. Cut and Replace (Splice) Stair Handrail. Weld new (4 feet each side) of angle Iron to match existing. Grid to match existing transition.

DQ 1 LS $_________

REPAIR FIRE TOWER

REPAIR FIRE TOWER CAB

BASE BID SCHEDULE

Joanna Bald Fire Tower Restoration & Repairs

ARRA Project CIM-0811-62F

MOBILIZATION

DEMOLITION

H. Install Standing Seam Roof System

AQ 4 SQ $_________ $_________

A. Install Complete System-Air

Terminals to Weatherhead

DQ 1 LS $_________ $_________

B. Install Copper Downlead Cable/Rigid Galv. Conduit- Weatherhead to Ground Loop Conductor

AQ 60 LF $_________ $_________

C. Install Copper Ground Loop Conductor System

DQ 100 LS $_________ $_________

REPAIR LIGHTNING PROTECTION

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made

TOTAL for lines 12-16

* Bidders must provide prices on all base bid items and option items to be considered for award.

One award will be made from this solicitation.

Joanna Bald Bid Schedule