Section B-6 - Schedule of Items - Yellow Mtn.xls
XLS spreadsheet 28 KB Posted
- Solicitation number
- AG-4419-S-10-0433
About this file
Section B-6 - Schedule of Items - Yellow Mtn
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 3.pdf | ||
| SF30 Amendment 2.pdf | ||
| Exhibit 2 - Lead Based Paint Removal.doc | DOC document | |
| Pre-bid meeting list.pdf | ||
| Section B-6 -Yellow Mtn. Sched. Rev .pdf | ||
| SF30 Amendment 1.pdf | ||
| Section B-2 - Joanna Bald Sched Rev.pdf | ||
| Exhibit 1 - Drawings_ Supp. Specifications.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B-7 - Schedule of Items - Option Items.xls | XLS spreadsheet | |
| Attachment 1 - Specifications.pdf | ||
| Section B-3 - Schedule of Items - Cowee Bald.xls | XLS spreadsheet | |
| Section B-2 - Schedule of Items - Joanna Bald.xls | XLS spreadsheet | |
| Section B-5 - Sched.of Items - Wauchecha Bald.xls | XLS spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BASE BID SCHEDULE | |||||||
| Yellow Mountain Fire Tower | |||||||
| Restoration & Repairs - ARRA Project CIM-0811-62F | |||||||
| BASE BID ITEMS | |||||||
| * Pay Item Description | Method of Measurement | Quantity | Units | Unit Price | Amount | ||
| 25 | MOBILIZATION | DQ | 1 | LS | $_________ | ||
| 26 | DEMOLITION | ||||||
| A. | Remove Roof Tie-Down Cable System | DQ | 400 | LF | $_________ | $_________ | |
| B. | Remove Metal Roof System | DQ | 4 | SQ | $_________ | $_________ | |
| C. | Remove Door & Frame | DQ | 1 | EA | $_________ | $_________ | |
| D. | Remove Concrete Floor | DQ | 178 | SF | $_________ | $_________ | |
| 27 | REPAIR FIRE TOWER CAB | ||||||
| A. | Install Standing Seam Metal Roof System | DQ | 4 | SQ | $_________ | $_________ | |
| B. | Install Roof Cable Anchor System | DQ | 400 | LF | $_________ | $_________ | |
| C. | Paint Interior & Exterior of Cab, Handrails, Access Ladder, Door& Frame | AQ | 1802 | SF | $_________ | $_________ | |
| D. | Install Floor Drain System | DQ | 1 | EA | $_________ | $_________ | |
| E. | Install Concrete Floor | DQ | 178 | SF | $_________ | $_________ | |
| F. | Install Door & Door Frame & Hardware | DQ | 1 | EA | $_________ | $_________ | |
| G. | Install Foundation Vents | DQ | 12 | EA | $_________ | $_________ | |
| 28 | REPAIR LIGHTNING PROTECTION SYSTEM | ||||||
| A. | Install Complete System-Air Terminals to Weatherhead | DQ | 1 | LS | $_________ | $_________ | |
| B. | Install Downlead Cable/Conduit-Weatherhead to Ground Loop Conductor | AQ | 20 | LF | $_________ | $_________ | |
| C. | Install Ground Loop Conductor System | DQ | 100 | LS | $_________ | $_________ | |
| Total for lines 25-28 | $________ | ||||||
| * Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made | |||||||
| * Bidders must provide prices on all base bid items and option items to be considered for award. One award will be made from this solicitation. |
Sheet2