Exhibit 3 - Trail Log - HardTimes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section B - Revised Schedule of Items.doc | DOC document | |
| SF30 Amendment 2.pdf | ||
| Exhibit 9 - Trail Logs Combined.pdf | ||
| Attachment 1 - Rev Specifiactions.doc | DOC document | |
| Exhibit 5 - Map _ Looking Glass.pdf | ||
| Section M - Rev Evaluation Criteria.doc | DOC document | |
| SF30 Amendment 1.pdf | ||
| Section B - Schedule of Items.doc | DOC document | |
| Exhibit 1 - Design Parameters.doc | DOC document | |
| Section A - SF1449.pdf | ||
| Exhibit 7 - Drawing Grade DIP.pdf | ||
| Exhibit 8 - Drawing Rolling Dip.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachment 1 - Specifications.doc | DOC document | |
| Exhibit 4 - Trail Log-Deer Lake.pdf | ||
| Exhibit 6 - Map _ Hardtimes-Deer Lake.pdf | ||
| Exhibit 5 - Map _ Looking Glass.pdf | ||
| Exhibit 2 - Trail Log Looking Glass.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hard Times Connector Trail Assessment Log 1
Hard Times Trail Assessment Log Inspection Date : 11-12-09 Inspector Name: B.Lowe, D.Stutzman, F. Lashley, E. Johnson Length: 0.7 miles Trail Class: 3 Designed Use: Hiking, Bikes, Horseback Managed Use: Hiking, Bikes Difficulty Level: Easy Average Width: 3’ Surface: Soil Wilderness Trail: No
0+00 Start trl at sign off Hardtimes
Road
0+95 Remove haz. Tree-R
1+81 Bridge
2+69 Ex. GD- remove rock
Hard Times Connector Trail Assessment Log 2
3+08 Start- remove log to clr.
Limits
Contractor to place 2 GD between 3+08-4+26
4+26 GD- top of hill “ “ “
5+21 Add GD
8+85 Start- incised trl.
9+90 Punch berm-L, New GD
11+18 Rehab GD , remove log Note: heavy scouring to bedrock
11+75 New GD
13+25 GD w/long r.o.-Punch berm Fill inc. trl.
14+19 NFGD
Hard Times Connector Trail Assessment Log 3
17+29 End- incised trl.
17+40 Install GD-R
20+15 Cut log, remove, GD-L
21+33 Remove log add GD-L
22+16 Add GD-L
Hard Times Connector Trail Assessment Log 4
22+66 Start- Remove haz. Tree-L Cut remove roots, re-grade trd.
22+86 End- remove haz. Tree GD-L
25+29 Cut remove log, add GD-L
26+36 Remove log, place trail upslope
28+40 GD-L
Hard Times Connector Trail Assessment Log 5
29+16 GD-L
30+75 GD-R
31+66 NFGD-R
32+65 Start- scoured inc. trd. Add
GD-R
33+55 GD-L In curve
33+92 GD-L
34+87 GD-L, level spreader to disperse water
35+76 GD-R long r.o.
35+90 Top of steep grd. X-trm inc.
trl. Start tnpk
36+15 Add GD –L near ctr. Of tnpk.
Add fill and taper
Hard Times Connector Trail Assessment Log 6
36+48 End inc. trd. End of trail at forest road. Sign
Hard Times Trail Assessment Log