Exhibit 3 - Trail Log-Hardtimes.pdf

PDF 1 MB Posted

Attached to
RECOVERY* Trail Maintenance - Pisgah National Forest, North Carolina
Solicitation number
AG-4419-S-10-0360
Issued by

About this file

Exhibit 3 - Trail Log - HardTimes

View the file

Other files

File Type Posted
Section B - Revised Schedule of Items.doc DOC document
SF30 Amendment 2.pdf PDF
Exhibit 9 - Trail Logs Combined.pdf PDF
Attachment 1 - Rev Specifiactions.doc DOC document
Exhibit 5 - Map _ Looking Glass.pdf PDF
Section M - Rev Evaluation Criteria.doc DOC document
SF30 Amendment 1.pdf PDF
Section B - Schedule of Items.doc DOC document
Exhibit 1 - Design Parameters.doc DOC document
Section A - SF1449.pdf PDF
Exhibit 7 - Drawing Grade DIP.pdf PDF
Exhibit 8 - Drawing Rolling Dip.pdf PDF
Sections C thru M - Solicitation.doc DOC document
Attachment 1 - Specifications.doc DOC document
Exhibit 4 - Trail Log-Deer Lake.pdf PDF
Exhibit 6 - Map _ Hardtimes-Deer Lake.pdf PDF
Exhibit 5 - Map _ Looking Glass.pdf PDF
Exhibit 2 - Trail Log Looking Glass.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hard Times Connector Trail Assessment Log 1

Hard Times Trail Assessment Log Inspection Date : 11-12-09 Inspector Name: B.Lowe, D.Stutzman, F. Lashley, E. Johnson Length: 0.7 miles Trail Class: 3 Designed Use: Hiking, Bikes, Horseback Managed Use: Hiking, Bikes Difficulty Level: Easy Average Width: 3’ Surface: Soil Wilderness Trail: No

0+00 Start trl at sign off Hardtimes

Road

0+95 Remove haz. Tree-R

1+81 Bridge

2+69 Ex. GD- remove rock

Hard Times Connector Trail Assessment Log 2

3+08 Start- remove log to clr.

Limits

Contractor to place 2 GD between 3+08-4+26

4+26 GD- top of hill “ “ “

5+21 Add GD

8+85 Start- incised trl.

9+90 Punch berm-L, New GD

11+18 Rehab GD , remove log Note: heavy scouring to bedrock

11+75 New GD

13+25 GD w/long r.o.-Punch berm Fill inc. trl.

14+19 NFGD

Hard Times Connector Trail Assessment Log 3

17+29 End- incised trl.

17+40 Install GD-R

20+15 Cut log, remove, GD-L

21+33 Remove log add GD-L

22+16 Add GD-L

Hard Times Connector Trail Assessment Log 4

22+66 Start- Remove haz. Tree-L Cut remove roots, re-grade trd.

22+86 End- remove haz. Tree GD-L

25+29 Cut remove log, add GD-L

26+36 Remove log, place trail upslope

28+40 GD-L

Hard Times Connector Trail Assessment Log 5

29+16 GD-L

30+75 GD-R

31+66 NFGD-R

32+65 Start- scoured inc. trd. Add

GD-R

33+55 GD-L In curve

33+92 GD-L

34+87 GD-L, level spreader to disperse water

35+76 GD-R long r.o.

35+90 Top of steep grd. X-trm inc.

trl. Start tnpk

36+15 Add GD –L near ctr. Of tnpk.

Add fill and taper

Hard Times Connector Trail Assessment Log 6

36+48 End inc. trd. End of trail at forest road. Sign

Hard Times Trail Assessment Log