Exhibit 2 - Trail Log Looking Glass.pdf

PDF 2 MB Posted

Attached to
RECOVERY* Trail Maintenance - Pisgah National Forest, North Carolina
Solicitation number
AG-4419-S-10-0360
Issued by

About this file

Exhibit 2 - Trail Log - Looking Glass

View the file

Other files

File Type Posted
Section B - Revised Schedule of Items.doc DOC document
SF30 Amendment 2.pdf PDF
Exhibit 9 - Trail Logs Combined.pdf PDF
Attachment 1 - Rev Specifiactions.doc DOC document
Exhibit 5 - Map _ Looking Glass.pdf PDF
Section M - Rev Evaluation Criteria.doc DOC document
SF30 Amendment 1.pdf PDF
Section B - Schedule of Items.doc DOC document
Exhibit 1 - Design Parameters.doc DOC document
Section A - SF1449.pdf PDF
Exhibit 7 - Drawing Grade DIP.pdf PDF
Exhibit 8 - Drawing Rolling Dip.pdf PDF
Sections C thru M - Solicitation.doc DOC document
Attachment 1 - Specifications.doc DOC document
Exhibit 4 - Trail Log-Deer Lake.pdf PDF
Exhibit 6 - Map _ Hardtimes-Deer Lake.pdf PDF
Exhibit 5 - Map _ Looking Glass.pdf PDF
Exhibit 3 - Trail Log-Hardtimes.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Looking Glass Trail Assessment Log 1

Looking Glass Trail Assessment Log

Inspection Date : 11-25-09 Length: 3.1 Trail Class: 3 Designed Use: Hiker/Pedestrian Managed Use: Hiker/Pedestrian Difficulty Level: More Average Width: 18-36” Surface: Soil, Bedrock Wilderness Trail: No

Station Comment Picture or Additional Comments

All side sloped sections of trail have root and compaction problems. Sluff and burm are to be removed so out slope can be re-established and tread can be returned up slope to original position. Extreme cases are noted in log.

All short cut trails are to be closed and in some cases erosion problems are to be addressed, which are also noted in log.

0+00 Begin Trail Sign

#1

0+09 Cut large root add ABC

0+17 Remove railroad tie and regrade

0+35 Begin incise trail Build Box Crib (BC) #2

0+79 End incise trail

0+81 Social trail to right

Looking Glass Trail Assessment Log 2

0+93 BC to cover roots

1+46 Sign

1+56 Armor wet spring crossing #3

1+71 End armor

1+72 Begin BC

1+93 End BC

2+01 GD left

2+13 Begin incise

Build BC steps

Looking Glass Trail Assessment Log 3

3+49 Incised trail beginning at 2+13

#4

3+70 GD right Long run out (LRO)

3+90 Trail splits block right side to redirect traffic left.

3+98 GD right LRO

4+36 Split trail comes back together

4+71 Remove burm GD right

4+91

Re-establish line of trail to the left.

Block lower side.

*Trail splits to go around rock and exposed roots.* #5

Looking Glass Trail Assessment Log 4

5-28 Split trail comes back together

5+36 Begin armored creek crossing

5+68 End armored creek crossing

5+68 Begin BC

5+89

End BC Begin armored

#6

6+07 End armored crossing

6+08 Remove old steps and construct new ones

6+17 End new steps

6+24

Reconstruct existing steps *Erosion taking place under step risers*

#7

6+42 End steps Begin tread re-establishment U/S

Looking Glass Trail Assessment Log 5

6+66 Remove root and dying hemlock

9+12

Remove buried logs as they are creating burm. Re-establish out slope and add grade dips according to FS specs.

*From 6+66 to 9+12 tread is creeping and needs sluff and burm removal*

9+76 Remove hazard tree (leaner)

10+79 Begin armored crossing

10+90 End armored crossing

11+55 GD right

11+74 NFGD

Looking Glass Trail Assessment Log 6

12+14

Move trail back U/S above large blazed poplar

#9

13+73 Begin BC steps

14+28 End BC steps

15+96 Cut roots and remove beech tree on right

16+65 Remove burm and install stone steps

16+82 End stone

17+18 Begin armored crossing

17+53 End armored

#10

17+53 Begin BC

17+90 End BC steps

Looking Glass Trail Assessment Log 7

18+47 NFGD

19+22 Begin BC

19+32 End BC

19+51 NFGD

19+65 Begin BC

19+69 End BC

19+86 Begin BC

20+08 End BC

20+95 Remove 4X4 timber

21+00 GD left

21+49 NFGD

22+03 Begin armored crossing and remove

NFWB

#11

22+27 Replace NFWB with armored GD 22+66 Install stone armored GD to remove creek from trail

22+80 Begin BC

22+90 End BC

23+22 Remove log water bar and install GD right

Looking Glass Trail Assessment Log 8

24-96 Social trail to waterfall relocate or improve to decrease erosion *traffic is inevitable*

#12

25+33 GD right

25+56 NFGD

26+53

Remove roots and re-establish tread U/S

27+18 Begin BC over roots and move tread U/S

#13

27+45 End BC

28+84 GD right Still upslope relo 29+00 End upslope relo and begin switch back (SB)

29+00 Extend SB to blue flag at 29+15 move upper leg U/S to increase radius and allow for insloping and better drainage

29+43 End SB repair

30+43 Center of natural drainage move tread U/S 8-10’

Looking Glass Trail Assessment Log 9

30+74 Begin BC

30+96 End BC

31+04 GD left Move tread U/S

31+50 GD left Move tread U/S

31+58 Begin L crib

31+80 End L crib

33+12 Begin L crib

33+22 End L Crib

33+42

Reconstruct SB to original location.

Rebuild to achieve I/S and O/S *Consider steps* #14

View #2 of SB

Looking Glass Trail Assessment Log 10

#15

33+56 Apex of SB

34+09 Begin L crib

34+42 End L crib

34+52

O/S trail elevate tread to top of locust retainer and leave logs in place

35+20 Remove locust retainer and move tread U/S

35+69 Remove roots and 2 dying hemlocks on left

36+06 Begin L crib

36+35 End L crib

36+46 Cut roots and move tread U/S

36+94 GD right

37+86 GD right

39+17 GD right

39+86 Large GD right

40+20 Begin BC

40+34 End BC

40+44 Cut roots as necessary. Move tread U/S

41+72 GD right

42+65 GD right Punch burm LRO

42+78 Begin BC

Looking Glass Trail Assessment Log 11

43+15 Begin climbing turn and BC as needed

#16

43+60 GD right

43+88 Begin BC

44+03 End BC

44+09 Leave log and GD left LRO

44+18 Begin BC

44+26 End BC

44+54 Remove log water bar, replace with GD left

44+92 Begin incised trail, move tread U/S and remove 4” hemlock on right

45+30 GD left

46+03 GD left Move tread U/S

46+74 GD left Move tread U/S

47+05 Begin BC

47+27 End BC

47+52

Move tread U/S turnpike (TP) over roots

47+80 End TP

48+58 GD left

49+10 GD left

50+10 GD left

51+18 GD left

51+66 BC step

53+08 GD left

Looking Glass Trail Assessment Log 12

53+78 GD left

54+11 Remove old timbers, begin incised trail, possibly TP

54+33 End TP

54+66 GD left

55+23 Eliminate SB by constructing BC climbing turn. Improve and extend U/S drainage

#17

55+49 End BC climbing turn

56+81 Begin incised tread and install BC

56+98 End BC

57+65 GD left Remove timbers and close social trail

57+90 End incised

57+94 GD left

58+08 Begin incised tread and install BC

58+41 End incised tread and end BC

58+50 Move tread U/S GD left

58+64 Cut large root and re-establish tread U/S

Looking Glass Trail Assessment Log 13

58+75 Remove timbers and begin incised tread *install long BC steps*

#18

59+23 GD left

59+52 Remove timbers end BC also end incised trail

59+58 GD left

59+64 Move tread 3’ U/S, fill and compact soil over roots

59+82 End U/S relo

#19

59+85 GD left

60+11 Begin incised tread and BC steps

60+44 End BC steps

60+65 Remove timbers and move tread U/S

Looking Glass Trail Assessment Log 14

60+70 GD right

61+10 GD right

61+30 Begin incised tread and BC

61+58 End BC

61+62 GD right

61+92 Begin Incised tread and BC

62+23 End Incised tread and BC

62+82 GD left

63+65 GD left 63+96 Remove log pile on left to establish O/S

64+46 GD left

65+20 GD left

65+31 Install BC steps around SB

65+44 End BC move tread U/S

66+05 Begin incised tread and BC

66+25 End BC

67+03 BC step

#20

67+45 Begin incised tread BC steps

67+66 End incised tread and BC steps

Looking Glass Trail Assessment Log 15

68+40 GD left

69+13 Remove burm on left and elevate tread to achieve O/S

69+17

Begin BC

69+32 End BC

69+37 Severe incising, begin BC

69+66 End BC

70+06 Build stone retainer wall on D/S side approx. 36” high

70+15 GD right

70+19 Begin filling incised tread, fill and compact

70+33 End fill

70+59 GD right Punch burm

70+91 Move tread back U/S above 6” oak

71+10 End U/S relo

71+10 Heavily eroded short cut trail, possibly install fence or other barricade to stop travel #21

Photo not available

71+63 SB incised BC steps

71+80 End BC steps

72+04 Construct stone wall or rail on left

72+19 End wall/rail

72+25 GD left

72+78 GD left punch burm

Looking Glass Trail Assessment Log 16

72+98 Punch burm rock crib steps to elevate tread for drainage

73+06 End rock crib

73+07 Build rock steps to left of bedrock in tread #22

Photo not available

73+23

Move tread U/S and begin L crib

73+41 End L crib

73+48 Begin incised tread and deburm

73+67 End incised tread and deburm

73+82 Move tread U/S and begin L crib

74+10 End L crib

74+14 GD right

Station Comment Picture or Additional Comments

74+45 Begin BC

74+53 End BC

Looking Glass Trail Assessment Log 17

74+55 Reinforce social trail to view on right

#23

74+64 Begin incised tread and BC

75+08 End incised tread and BC

75+30 Begin L crib

75+45 End L crib

75+78 Deburm left

75+85 Deburm left

76+02 Deburm left use soil to raise tread

76+16 End deburm

76+20 GD left Cut large roots

77+30 Begin L crib Move tread above 10” oak

77+50 End L crib

77+70 BC steps

Looking Glass Trail Assessment Log 18

77+80 Begin BC

Armor U/S drainage due to seep

#24

77+94 End BC steps

78+12 Begin BC Move tread U/S

78+32 End BC

78+63 GD right

79+23 BC steps Elevate tread enough to move water off apex of SB

79+30 End BC steps

79+50 Move tread U/S and deburm

79+56 End U/S deburm

79+72 Begin barrier to close short cut

79+82 End barrier

Looking Glass Trail Assessment Log 19

79+87 Build stone wall in SB to bring grade up enough to allow water off apex, build stone crib steps up to wall?

#25

80+20 Rock out crop if possible move tread U/S of out crop to use rock as retainer.

80+52 Knick right O/S tread armor seep

80+72 End armoring

80+80

Move tread U/S 4’ and re-establish I/S to allow drainage at apex

81+57 Remove timber deburm and re-establish O/S

81+83 End deburm & O/S

82+19 Remove log and regrade lower leg of SB

82+29 Remove old steps and rebuild with BC steps

82+57 End BC steps

82+82 BC steps To cover roots

82+92 End BC steps

83+68 Regrade SB

Looking Glass Trail Assessment Log 20

84+48 GD left

85+41 NFGD Deburm left

85+60 Remove log

85+98 GD left

86+23 Regrade SB

86+35 End SB

86+63 Move tread U/S above 12” oak (blazed)

87+07 GD right

88+00 GD right

88+51 GD right

89+49 Large Knick

89+57 BC over roots

89+80 BC steps Left around climbing turn move tread U/S

89+94 End climbing turn

91+31 Remove log and build step

91+95 GD left

92+45 GD left

93+45 Begin incised trail and BC

Looking Glass Trail Assessment Log 21

93+73 End incised trail and BC

94+00 BC step

94+17 BC step

94+40 GD left

94+54 Move tread 6’ up hill, re-establish O/S and cover roots

95+26 GD left Tie in new tread with old

95+32 Begin wide incised trail

95+71 BC steps

95+81 End BC steps

95+92 GD left LRO

96+00 Begin BC

96+45

End of wide incised trail *may possibly be cheaper to relo trail between 95+32 and 96+45

96+46 Begin BC

96+55 End BC steps

96+68 Begin incised tread and BC

97+05 End incised tread and BC

Looking Glass Trail Assessment Log 22

97+51 Deep incised trail begin BC

#26

97+88 Remove stump

97+92 End deep incised trail and BC steps

98+30 Severe incising begin BC

98+54 GD left & end

BC

99+77 GD left

100+30 Move trail U/S approx 15’ above 14” maple (flagged)

#27

Looking Glass Trail Assessment Log 23

100+77 Tie in new tread with old

101+78 Remove hazardous leaner and root wad, re-establish tread approx 10’ U/S

102+27 GD left

103+10 GD left LRO

103+18 Begin incised tread and BC

103+42

End incised tread and BC

104+34 Cut hazardous tree U/S, begin moving tread U/S above flagged tree

104+92 Continue moving tread U/S to avoid large roots on 36” oak

105+72 Tie in new tread with old

106+25

Begin incised trail and BC

106+75 GD left LRO End incised trail and BC

Trail Assessment Log November 25, 2009 Looking Glass Trail

Station Comment Picture or Additional Comments

106+86 Begin major incising due to width, possible BC along with compacted fill

#28

107+45 End incising

107+60 GD right Begin major

#29

*in photos 28 & 29 trail has eroded to approx 8’ wide*

109+00 End major

109+14 GD right 109+23 Begin major incising 8’wide 3’deep

110+41 End major

110+75 GD left

LRO

111+09 Begin incised tread and BC

111+38 End incised tread and BC

111+77 GD right Begin incised tread, deburm and regrade

112+19 Begin BC 113+12 End BC

113+20 GD right Remove log 113+28 Begin incised tread and BC

113+51 GD right Punch burm continue BC 113+84 Build crib steps and continue BC 113+91 GD right

End steps, punch burm *still incised severely and possibly continue

BC*

#30

Looking Glass Trail

Station Comment Picture or Additional Comments

114+55 GD right

115+13 GD right

115+58 End

115+84 GD right 116+26 Repair wash on left begin BC steps 116+38 End BC

116+54 GD right

116+65 Begin incised tread and BC 117+15 End incised tread and BC 117+21 GD right 117+48 Begin deep incised tread and BC steps

118+68 End deep incised tread and BC steps

118+96 Begin incised tread and BC steps

119+28

Prune blazed pine

119+65 GD left

LRO

Still incised

121+18 End incised tread and BC 121+30 GD left

121+42 Begin incised tread and BC 122+30 End BC trail incised to bedrock 122+90 End bedrock, trail still incised possibly BC

Looking Glass Trail

Station Comment Picture or Additional Comments

124+13 Helipad on left trail still incised

#31

125+49 GD right

126+49 NFGD Clean out and re grade 126+87 GD left 128+04 GD left

Still severely incised and very wet BC or L crib as needed

#32

128+31 GD left 129+20 GD left Still incised, BC

131+55 End incised tread

131+82 GD left 132+21 GD left 132+83 GD left

133+18 GD left

133+47 Clean out spring crossing, already armored

133+89

Improve tread on down hill side

134+10 Begin incised tread and BC

134+54 Rock ledge 134+75 GD left

136+45 Still severely incised, BC 136+60 GD right

LRO

Still incised

136+94 End incising and BC

137+20 GD right

Looking Glass Trail

Station Comment Picture or Additional Comments

137+90 Begin incised tread and BC

139+86 GD right End incised tread and BC 141+65 Begin BC Slightly incised 141+95 End BC

142+11 Social trail on right, possible GD 142+60 Begin incised tread and BC 144+60 GD left 145+43 Begin incised tread and BC

*142+60 to 145+36 tread is mostly bedrock* 146+30 End incised tread and BC

146+74 GD left

147+09 Begin incised tread and BC

147+94 End BC Begin bedrock

148+65 End bedrock

Trail still incised

149+00 GD left Trail still incised

#33

150+82 End bedrock and incised tread 150+93 GD left

151+06 Begin incised tread and BC 152+38 End incised tread and BC 153+03 GD right Begin slightly incised tread 154+76 GD right End of slightly incised tread

156+01 Remove log and re grade for GD left

156+50 Begin slightly incised tread

157+18 Begin severe incised tread and BC

157+75 GD right Still severely incised

158+18 End severely incised tread and BC

159+40 Begin D/S and incised tread

159+65 GD left Crib up tread to allow for drainage

160+51 End of incised tread on D/S, begin bedrock

161+81 End bedrock

Incised continues, root and compaction

162+19 Begin steep D/S on bedrock ledges

162+62 End of bedrock ledges, begin incised tread with root and compaction *severe incising*

162+62 #34 looking U/S

162+62

#35 looking D/S Still severely incised. BC as needed

163+44 End of severe incised tread

163+49 GD right

163+85 End of Trail

#36

Looking Glass Trail Assessment Log
Trail Assesment Log Looking Glass rev2.pdf
trail assessor log page 17
trail assessor log page 18
trail assessor log page 19
trail assessor log page 20
trail assessor log page 21