Exhibit 2 - Trail Log Looking Glass.pdf
PDF 2 MB Posted
- Solicitation number
- AG-4419-S-10-0360
About this file
Exhibit 2 - Trail Log - Looking Glass
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section B - Revised Schedule of Items.doc | DOC document | |
| SF30 Amendment 2.pdf | ||
| Exhibit 9 - Trail Logs Combined.pdf | ||
| Attachment 1 - Rev Specifiactions.doc | DOC document | |
| Exhibit 5 - Map _ Looking Glass.pdf | ||
| Section M - Rev Evaluation Criteria.doc | DOC document | |
| SF30 Amendment 1.pdf | ||
| Section B - Schedule of Items.doc | DOC document | |
| Exhibit 1 - Design Parameters.doc | DOC document | |
| Section A - SF1449.pdf | ||
| Exhibit 7 - Drawing Grade DIP.pdf | ||
| Exhibit 8 - Drawing Rolling Dip.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachment 1 - Specifications.doc | DOC document | |
| Exhibit 4 - Trail Log-Deer Lake.pdf | ||
| Exhibit 6 - Map _ Hardtimes-Deer Lake.pdf | ||
| Exhibit 5 - Map _ Looking Glass.pdf | ||
| Exhibit 3 - Trail Log-Hardtimes.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Looking Glass Trail Assessment Log 1
Looking Glass Trail Assessment Log
Inspection Date : 11-25-09 Length: 3.1 Trail Class: 3 Designed Use: Hiker/Pedestrian Managed Use: Hiker/Pedestrian Difficulty Level: More Average Width: 18-36” Surface: Soil, Bedrock Wilderness Trail: No
Station Comment Picture or Additional Comments
All side sloped sections of trail have root and compaction problems. Sluff and burm are to be removed so out slope can be re-established and tread can be returned up slope to original position. Extreme cases are noted in log.
All short cut trails are to be closed and in some cases erosion problems are to be addressed, which are also noted in log.
0+00 Begin Trail Sign
#1
0+09 Cut large root add ABC
0+17 Remove railroad tie and regrade
0+35 Begin incise trail Build Box Crib (BC) #2
0+79 End incise trail
0+81 Social trail to right
Looking Glass Trail Assessment Log 2
0+93 BC to cover roots
1+46 Sign
1+56 Armor wet spring crossing #3
1+71 End armor
1+72 Begin BC
1+93 End BC
2+01 GD left
2+13 Begin incise
Build BC steps
Looking Glass Trail Assessment Log 3
3+49 Incised trail beginning at 2+13
#4
3+70 GD right Long run out (LRO)
3+90 Trail splits block right side to redirect traffic left.
3+98 GD right LRO
4+36 Split trail comes back together
4+71 Remove burm GD right
4+91
Re-establish line of trail to the left.
Block lower side.
*Trail splits to go around rock and exposed roots.* #5
Looking Glass Trail Assessment Log 4
5-28 Split trail comes back together
5+36 Begin armored creek crossing
5+68 End armored creek crossing
5+68 Begin BC
5+89
End BC Begin armored
#6
6+07 End armored crossing
6+08 Remove old steps and construct new ones
6+17 End new steps
6+24
Reconstruct existing steps *Erosion taking place under step risers*
#7
6+42 End steps Begin tread re-establishment U/S
Looking Glass Trail Assessment Log 5
6+66 Remove root and dying hemlock
9+12
Remove buried logs as they are creating burm. Re-establish out slope and add grade dips according to FS specs.
*From 6+66 to 9+12 tread is creeping and needs sluff and burm removal*
9+76 Remove hazard tree (leaner)
10+79 Begin armored crossing
10+90 End armored crossing
11+55 GD right
11+74 NFGD
Looking Glass Trail Assessment Log 6
12+14
Move trail back U/S above large blazed poplar
#9
13+73 Begin BC steps
14+28 End BC steps
15+96 Cut roots and remove beech tree on right
16+65 Remove burm and install stone steps
16+82 End stone
17+18 Begin armored crossing
17+53 End armored
#10
17+53 Begin BC
17+90 End BC steps
Looking Glass Trail Assessment Log 7
18+47 NFGD
19+22 Begin BC
19+32 End BC
19+51 NFGD
19+65 Begin BC
19+69 End BC
19+86 Begin BC
20+08 End BC
20+95 Remove 4X4 timber
21+00 GD left
21+49 NFGD
22+03 Begin armored crossing and remove
NFWB
#11
22+27 Replace NFWB with armored GD 22+66 Install stone armored GD to remove creek from trail
22+80 Begin BC
22+90 End BC
23+22 Remove log water bar and install GD right
Looking Glass Trail Assessment Log 8
24-96 Social trail to waterfall relocate or improve to decrease erosion *traffic is inevitable*
#12
25+33 GD right
25+56 NFGD
26+53
Remove roots and re-establish tread U/S
27+18 Begin BC over roots and move tread U/S
#13
27+45 End BC
28+84 GD right Still upslope relo 29+00 End upslope relo and begin switch back (SB)
29+00 Extend SB to blue flag at 29+15 move upper leg U/S to increase radius and allow for insloping and better drainage
29+43 End SB repair
30+43 Center of natural drainage move tread U/S 8-10’
Looking Glass Trail Assessment Log 9
30+74 Begin BC
30+96 End BC
31+04 GD left Move tread U/S
31+50 GD left Move tread U/S
31+58 Begin L crib
31+80 End L crib
33+12 Begin L crib
33+22 End L Crib
33+42
Reconstruct SB to original location.
Rebuild to achieve I/S and O/S *Consider steps* #14
View #2 of SB
Looking Glass Trail Assessment Log 10
#15
33+56 Apex of SB
34+09 Begin L crib
34+42 End L crib
34+52
O/S trail elevate tread to top of locust retainer and leave logs in place
35+20 Remove locust retainer and move tread U/S
35+69 Remove roots and 2 dying hemlocks on left
36+06 Begin L crib
36+35 End L crib
36+46 Cut roots and move tread U/S
36+94 GD right
37+86 GD right
39+17 GD right
39+86 Large GD right
40+20 Begin BC
40+34 End BC
40+44 Cut roots as necessary. Move tread U/S
41+72 GD right
42+65 GD right Punch burm LRO
42+78 Begin BC
Looking Glass Trail Assessment Log 11
43+15 Begin climbing turn and BC as needed
#16
43+60 GD right
43+88 Begin BC
44+03 End BC
44+09 Leave log and GD left LRO
44+18 Begin BC
44+26 End BC
44+54 Remove log water bar, replace with GD left
44+92 Begin incised trail, move tread U/S and remove 4” hemlock on right
45+30 GD left
46+03 GD left Move tread U/S
46+74 GD left Move tread U/S
47+05 Begin BC
47+27 End BC
47+52
Move tread U/S turnpike (TP) over roots
47+80 End TP
48+58 GD left
49+10 GD left
50+10 GD left
51+18 GD left
51+66 BC step
53+08 GD left
Looking Glass Trail Assessment Log 12
53+78 GD left
54+11 Remove old timbers, begin incised trail, possibly TP
54+33 End TP
54+66 GD left
55+23 Eliminate SB by constructing BC climbing turn. Improve and extend U/S drainage
#17
55+49 End BC climbing turn
56+81 Begin incised tread and install BC
56+98 End BC
57+65 GD left Remove timbers and close social trail
57+90 End incised
57+94 GD left
58+08 Begin incised tread and install BC
58+41 End incised tread and end BC
58+50 Move tread U/S GD left
58+64 Cut large root and re-establish tread U/S
Looking Glass Trail Assessment Log 13
58+75 Remove timbers and begin incised tread *install long BC steps*
#18
59+23 GD left
59+52 Remove timbers end BC also end incised trail
59+58 GD left
59+64 Move tread 3’ U/S, fill and compact soil over roots
59+82 End U/S relo
#19
59+85 GD left
60+11 Begin incised tread and BC steps
60+44 End BC steps
60+65 Remove timbers and move tread U/S
Looking Glass Trail Assessment Log 14
60+70 GD right
61+10 GD right
61+30 Begin incised tread and BC
61+58 End BC
61+62 GD right
61+92 Begin Incised tread and BC
62+23 End Incised tread and BC
62+82 GD left
63+65 GD left 63+96 Remove log pile on left to establish O/S
64+46 GD left
65+20 GD left
65+31 Install BC steps around SB
65+44 End BC move tread U/S
66+05 Begin incised tread and BC
66+25 End BC
67+03 BC step
#20
67+45 Begin incised tread BC steps
67+66 End incised tread and BC steps
Looking Glass Trail Assessment Log 15
68+40 GD left
69+13 Remove burm on left and elevate tread to achieve O/S
69+17
Begin BC
69+32 End BC
69+37 Severe incising, begin BC
69+66 End BC
70+06 Build stone retainer wall on D/S side approx. 36” high
70+15 GD right
70+19 Begin filling incised tread, fill and compact
70+33 End fill
70+59 GD right Punch burm
70+91 Move tread back U/S above 6” oak
71+10 End U/S relo
71+10 Heavily eroded short cut trail, possibly install fence or other barricade to stop travel #21
Photo not available
71+63 SB incised BC steps
71+80 End BC steps
72+04 Construct stone wall or rail on left
72+19 End wall/rail
72+25 GD left
72+78 GD left punch burm
Looking Glass Trail Assessment Log 16
72+98 Punch burm rock crib steps to elevate tread for drainage
73+06 End rock crib
73+07 Build rock steps to left of bedrock in tread #22
Photo not available
73+23
Move tread U/S and begin L crib
73+41 End L crib
73+48 Begin incised tread and deburm
73+67 End incised tread and deburm
73+82 Move tread U/S and begin L crib
74+10 End L crib
74+14 GD right
Station Comment Picture or Additional Comments
74+45 Begin BC
74+53 End BC
Looking Glass Trail Assessment Log 17
74+55 Reinforce social trail to view on right
#23
74+64 Begin incised tread and BC
75+08 End incised tread and BC
75+30 Begin L crib
75+45 End L crib
75+78 Deburm left
75+85 Deburm left
76+02 Deburm left use soil to raise tread
76+16 End deburm
76+20 GD left Cut large roots
77+30 Begin L crib Move tread above 10” oak
77+50 End L crib
77+70 BC steps
Looking Glass Trail Assessment Log 18
77+80 Begin BC
Armor U/S drainage due to seep
#24
77+94 End BC steps
78+12 Begin BC Move tread U/S
78+32 End BC
78+63 GD right
79+23 BC steps Elevate tread enough to move water off apex of SB
79+30 End BC steps
79+50 Move tread U/S and deburm
79+56 End U/S deburm
79+72 Begin barrier to close short cut
79+82 End barrier
Looking Glass Trail Assessment Log 19
79+87 Build stone wall in SB to bring grade up enough to allow water off apex, build stone crib steps up to wall?
#25
80+20 Rock out crop if possible move tread U/S of out crop to use rock as retainer.
80+52 Knick right O/S tread armor seep
80+72 End armoring
80+80
Move tread U/S 4’ and re-establish I/S to allow drainage at apex
81+57 Remove timber deburm and re-establish O/S
81+83 End deburm & O/S
82+19 Remove log and regrade lower leg of SB
82+29 Remove old steps and rebuild with BC steps
82+57 End BC steps
82+82 BC steps To cover roots
82+92 End BC steps
83+68 Regrade SB
Looking Glass Trail Assessment Log 20
84+48 GD left
85+41 NFGD Deburm left
85+60 Remove log
85+98 GD left
86+23 Regrade SB
86+35 End SB
86+63 Move tread U/S above 12” oak (blazed)
87+07 GD right
88+00 GD right
88+51 GD right
89+49 Large Knick
89+57 BC over roots
89+80 BC steps Left around climbing turn move tread U/S
89+94 End climbing turn
91+31 Remove log and build step
91+95 GD left
92+45 GD left
93+45 Begin incised trail and BC
Looking Glass Trail Assessment Log 21
93+73 End incised trail and BC
94+00 BC step
94+17 BC step
94+40 GD left
94+54 Move tread 6’ up hill, re-establish O/S and cover roots
95+26 GD left Tie in new tread with old
95+32 Begin wide incised trail
95+71 BC steps
95+81 End BC steps
95+92 GD left LRO
96+00 Begin BC
96+45
End of wide incised trail *may possibly be cheaper to relo trail between 95+32 and 96+45
96+46 Begin BC
96+55 End BC steps
96+68 Begin incised tread and BC
97+05 End incised tread and BC
Looking Glass Trail Assessment Log 22
97+51 Deep incised trail begin BC
#26
97+88 Remove stump
97+92 End deep incised trail and BC steps
98+30 Severe incising begin BC
98+54 GD left & end
BC
99+77 GD left
100+30 Move trail U/S approx 15’ above 14” maple (flagged)
#27
Looking Glass Trail Assessment Log 23
100+77 Tie in new tread with old
101+78 Remove hazardous leaner and root wad, re-establish tread approx 10’ U/S
102+27 GD left
103+10 GD left LRO
103+18 Begin incised tread and BC
103+42
End incised tread and BC
104+34 Cut hazardous tree U/S, begin moving tread U/S above flagged tree
104+92 Continue moving tread U/S to avoid large roots on 36” oak
105+72 Tie in new tread with old
106+25
Begin incised trail and BC
106+75 GD left LRO End incised trail and BC
Trail Assessment Log November 25, 2009 Looking Glass Trail
Station Comment Picture or Additional Comments
106+86 Begin major incising due to width, possible BC along with compacted fill
#28
107+45 End incising
107+60 GD right Begin major
#29
*in photos 28 & 29 trail has eroded to approx 8’ wide*
109+00 End major
109+14 GD right 109+23 Begin major incising 8’wide 3’deep
110+41 End major
110+75 GD left
LRO
111+09 Begin incised tread and BC
111+38 End incised tread and BC
111+77 GD right Begin incised tread, deburm and regrade
112+19 Begin BC 113+12 End BC
113+20 GD right Remove log 113+28 Begin incised tread and BC
113+51 GD right Punch burm continue BC 113+84 Build crib steps and continue BC 113+91 GD right
End steps, punch burm *still incised severely and possibly continue
BC*
#30
Looking Glass Trail
Station Comment Picture or Additional Comments
114+55 GD right
115+13 GD right
115+58 End
115+84 GD right 116+26 Repair wash on left begin BC steps 116+38 End BC
116+54 GD right
116+65 Begin incised tread and BC 117+15 End incised tread and BC 117+21 GD right 117+48 Begin deep incised tread and BC steps
118+68 End deep incised tread and BC steps
118+96 Begin incised tread and BC steps
119+28
Prune blazed pine
119+65 GD left
LRO
Still incised
121+18 End incised tread and BC 121+30 GD left
121+42 Begin incised tread and BC 122+30 End BC trail incised to bedrock 122+90 End bedrock, trail still incised possibly BC
Looking Glass Trail
Station Comment Picture or Additional Comments
124+13 Helipad on left trail still incised
#31
125+49 GD right
126+49 NFGD Clean out and re grade 126+87 GD left 128+04 GD left
Still severely incised and very wet BC or L crib as needed
#32
128+31 GD left 129+20 GD left Still incised, BC
131+55 End incised tread
131+82 GD left 132+21 GD left 132+83 GD left
133+18 GD left
133+47 Clean out spring crossing, already armored
133+89
Improve tread on down hill side
134+10 Begin incised tread and BC
134+54 Rock ledge 134+75 GD left
136+45 Still severely incised, BC 136+60 GD right
LRO
Still incised
136+94 End incising and BC
137+20 GD right
Looking Glass Trail
Station Comment Picture or Additional Comments
137+90 Begin incised tread and BC
139+86 GD right End incised tread and BC 141+65 Begin BC Slightly incised 141+95 End BC
142+11 Social trail on right, possible GD 142+60 Begin incised tread and BC 144+60 GD left 145+43 Begin incised tread and BC
*142+60 to 145+36 tread is mostly bedrock* 146+30 End incised tread and BC
146+74 GD left
147+09 Begin incised tread and BC
147+94 End BC Begin bedrock
148+65 End bedrock
Trail still incised
149+00 GD left Trail still incised
#33
150+82 End bedrock and incised tread 150+93 GD left
151+06 Begin incised tread and BC 152+38 End incised tread and BC 153+03 GD right Begin slightly incised tread 154+76 GD right End of slightly incised tread
156+01 Remove log and re grade for GD left
156+50 Begin slightly incised tread
157+18 Begin severe incised tread and BC
157+75 GD right Still severely incised
158+18 End severely incised tread and BC
159+40 Begin D/S and incised tread
159+65 GD left Crib up tread to allow for drainage
160+51 End of incised tread on D/S, begin bedrock
161+81 End bedrock
Incised continues, root and compaction
162+19 Begin steep D/S on bedrock ledges
162+62 End of bedrock ledges, begin incised tread with root and compaction *severe incising*
162+62 #34 looking U/S
162+62
#35 looking D/S Still severely incised. BC as needed
163+44 End of severe incised tread
163+49 GD right
163+85 End of Trail
#36
| Looking Glass Trail Assessment Log |
| Trail Assesment Log Looking Glass rev2.pdf |
| trail assessor log page 17 |
| trail assessor log page 18 |
| trail assessor log page 19 |
| trail assessor log page 20 |
| trail assessor log page 21 |
File details come from the government source that posted it. Updated .