BidAmendmentNo4.pdf
PDF 78 KB Posted
- Solicitation number
- AG-435H-S-08-0006
About this file
Amendment No. 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| ApparentLowBidder.doc | DOC document | |
| BidAmendment5.doc | DOC document | |
| revisedS2.2rev030508.pdf | ||
| addedsection02227.pdf | ||
| 1_BidAmendmentNo3.pdf | ||
| BidAmendmentNo3.pdf | ||
| revisedspecsTOC.pdf | ||
| revisedC1-4-rev022108.pdf | ||
| addedChattoogaBoringReport.pdf | ||
| addedC1-1A.pdf | ||
| addedsection04720.pdf | ||
| revisedC1-1-rev021808.pdf | ||
| BidAmendmentNo2.pdf | ||
| PreBidMeetingNotes.doc | DOC document | |
| PreBidAttendees.pdf | ||
| LEEDbriefing.doc | DOC document | |
| revisedEsheets1.1-1.2-4.1.pdf | ||
| BidAmendmentNo1.pdf | ||
| specsdivisions15and16.pdf | ||
| 2_NoteonSpecificationsandDrawings.doc | DOC document | |
| specsdivisions1-14.pdf | ||
| ArchitecturalDrawings.pdf | ||
| StructuralDrawings.pdf | ||
| 1_NoteonSpecificationsandDrawings.doc | DOC document | |
| Chattooga_River_Office_IFB.pdf | ||
| Mech-Elec-PlumbingDrawings.pdf | ||
| fs-2400-4_and_general_conditions.doc | DOC document | |
| NoteonSpecificationsandDrawings.doc | DOC document | |
| CivilDrawings.pdf | ||
| OF-17 new.pdf |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)
4 Mar 6, 2008
6. ISSUED BY:
USDA Forest Service Chattahoochee-Oconee National Forests 1755 Cleveland Highway Gainesville, GA 30501
7. ADMINISTERED BY (If other than 6.):
9A. AMENDMENT OF SOLICITATION NUMBER
AG-435H-S-08-0006
Construction of Chattooga River District Office [ x ]
9B. DATED (see item 11)
1/30/2008
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
8. NAME AND ADDRESS OF CONTRACTOR
CODE FACILITY
10B. DATED (see item 13)
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ x ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if applicable)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
A. THIS CHANGE IS ISSUED PURSUANT TO:
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (specify type of modification and authority )
E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Continued on following page.
The Bid Opening Date is NOT changed; it remains March 11, 2008 at 2:00pm
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)
MARCIA O’CONNOR
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY /s/ Marcia O’Connor 3/6/08
(signature of authorized person) (signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)
PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
Solicitation
AG-435H-S-08-0006
2 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)
4 Mar 6, 2008
1. Add Section 02227 Rock Removal.
2. Replace Sheet 2.2 with the revised sheet provided with this amendment.
3. Change all references for 1/2” Gypsum Wallboard (GWB) to 5/8”. Use 5/8” GWB throughout.
4. Question: Section 07115 calls for spray or roll-on waterproofing; plans call for stick-on sheets. Which is correct? Answer: Section 07115 of the specifications is the correct LEED compliant waterproofing.
5. Question: Is moisture resistant GWB to be used behind ceramic tile or is cementitious backer board?
Answer: Moisture resistant GWB is OK on wet walls, however cement board should be used on the elevated bathroom floor as detail “A” on A4.4