BidAmendmentNo2.pdf

PDF 75 KB Posted

Attached to
Construction of Chattooga River District Ranger Office, Tallulah Falls GA
Solicitation number
AG-435H-S-08-0006
Issued by

About this file

1. Bid Amendment No. 2

View the file

Other files

File Type Posted
BidAbstract.pdf PDF
ApparentLowBidder.doc DOC document
BidAmendment5.doc DOC document
revisedS2.2rev030508.pdf PDF
BidAmendmentNo4.pdf PDF
addedsection02227.pdf PDF
1_BidAmendmentNo3.pdf PDF
BidAmendmentNo3.pdf PDF
revisedspecsTOC.pdf PDF
revisedC1-4-rev022108.pdf PDF
addedChattoogaBoringReport.pdf PDF
addedC1-1A.pdf PDF
addedsection04720.pdf PDF
revisedC1-1-rev021808.pdf PDF
PreBidMeetingNotes.doc DOC document
PreBidAttendees.pdf PDF
LEEDbriefing.doc DOC document
revisedEsheets1.1-1.2-4.1.pdf PDF
BidAmendmentNo1.pdf PDF
specsdivisions15and16.pdf PDF
2_NoteonSpecificationsandDrawings.doc DOC document
specsdivisions1-14.pdf PDF
ArchitecturalDrawings.pdf PDF
StructuralDrawings.pdf PDF
1_NoteonSpecificationsandDrawings.doc DOC document
Chattooga_River_Office_IFB.pdf PDF
Mech-Elec-PlumbingDrawings.pdf PDF
fs-2400-4_and_general_conditions.doc DOC document
NoteonSpecificationsandDrawings.doc DOC document
CivilDrawings.pdf PDF
OF-17 new.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

2 Feb 21, 2008

6. ISSUED BY:

USDA Forest Service Chattahoochee-Oconee National Forests 1755 Cleveland Highway Gainesville, GA 30501

7. ADMINISTERED BY (If other than 6.):

9A. AMENDMENT OF SOLICITATION NUMBER

AG-435H-S-08-0006

Construction of Chattooga River District Office [ x ]

9B. DATED (see item 11)

1/30/2008

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

8. NAME AND ADDRESS OF CONTRACTOR

CODE FACILITY

10B. DATED (see item 13)

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

A. THIS CHANGE IS ISSUED PURSUANT TO:

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (specify type of modification and authority )

E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

Continued on following page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

MARCIA O’CONNOR

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY /s/ Marcia O’Connor 2/21/2008

(signature of authorized person) (signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

Solicitation

AG-435H-S-08-0006

2 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

2 Feb 20, 2008

1. The bid opening date is changed to March 11, 2008 at 2:00pm. The location stays the same.

2. Replace drawing sheets C1.1 and C1.4. Add drawing sheet C1.1A (Staking Plan).

3. Add Specification Section 04720, Cast Stone. Replace Table of Contents to include the new section.

4. The Site and Subsurface Conditions Report is provided with this amendment.

5. Clarifications on pre-bid conference information:

a) There is no sheet C3.2.

b) The structural drawings for the roof are correct as shown. The end rafters which some read as sloped members, and therefore a hip roof, are not sloped. The end rafters are horizon and in the same plane as the roof. The end rafters step up the as the side wall raises and rest (attached) on the end wall. Detail 3/S6 on sheet S-6 shows this condition.

File details come from the government source that posted it. Updated .