United States Department of Agriculture Natural Resources Conservation Service
STATEMENT OF WORK
Building Envelope Improvement (672) Missouri
Exhibit 2c - March 2016 1
These deliverables apply to this individual practice. For other planned practice deliverables refer to those specific Statements of Work.
DESIGN
Deliverables:
1. Design documents that demonstrate criteria in NRCS practice standard have been met and are compatible with planned and applied practices
a. Practice purpose(s) as identified in the conservation plan.
b. List of required permits to be obtained by the client and regulations to be met
c. List of facilitating practices
d. Practice standard criteria-related computations and analyses to develop plans and specifications including but not limited to:
i. Insulation R-value,
ii. Building U-value
iii. Energy star rating of doors or windows
iv. Additional performance rating values for all installed components
v. Emission reductions requirements, if needed
2. Written plans and specifications, when necessary, including sketches and drawings shall be provided to the client that adequately describes the requirements to install the practice and obtain necessary permits.
3. Operation and maintenance plan
4. Certification that the design meets practice standard criteria and comply with applicable laws and regulations
5. Design modifications during installation as required
INSTALLATION
Deliverables
1. Pre-installation conference with client is recommended
2. Verification that client has obtained required permits, as needed
3. Installation guidance as needed
4. Facilitate and implement required design modifications with client and original designer, as needed
5. Advise client/NRCS on compliance issues with all federal, state, tribal, and local laws, regulations and NRCS policies during installation
6. Certification that the installation process and materials meets design requirements
CHECK OUT
Deliverables
1. Records of application
a. Extent of practice units applied (Digital photo recommended to document installation).
b. Actual materials used
2. Certification that the application meets conditions described in energy audit and is in compliance with permits
3. Progress reporting
REFERENCES
• NRCS Field Office Technical Guide (eFOTG), Section IV, Conservation Practice Standard Building Envelope Improvement - 672
• NRCS National Environmental Compliance Handbook
• NRCS Cultural Resources Handbook