20160831_DT_Sheet-15_DETAILS_AND_TYPICAL_SECTION_REV_2.pdf
PDF 755 KB Posted
- Solicitation number
- AG-2B46-S-16-0011
About this file
Revised page 15 in the Construction Drawings
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PONDING HEIGHT
FLOW
F
L
O
W
24" MIN.
STEEL
TRENCH DETAIL
FILTER FABRIC SHALL BE IN ACCORDANCE
WITH CONSTRUCTION SPECIFICATIONS
STEEL POST
5 FT. POST LENGTH (MIN.), 1.25 LBS./FT. WEIGHT
(MIN.) 1-3/8 INCHES WIDE (MIN.), 14 SQUARE
INCHES ANCHOR PLATE SURFACE AREA (MIN.)
MAX. SEDIMENT LEVEL 0.25 FT.
36" MIN.
ATTACH FABRIC TO POSTS IN
ACCORDANCE WITH CONSTRUCTION
SPECIFICATIONS
NOTE:
1. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
2. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY. 0.5 FT. MAXIMUM RECOMMENDED STORAGE HEIGHT.
3. REMOVED SEDIMENT SHALL BE DEPOSITED IN SPOIL AREA AS SHOWN ON CONSTRUCTION
DRAWINGS.
4"X8" TRENCH WITH
COMPACTED BACKFILL
8' MAXIMUM SPACING WITH WIRE
SUPPORT FENCE; 6' MAXIMUM SPACING
WITHOUT WIRE SUPPORT FENCE
ATTACH FILTER FABRIC
SECURELY TO UPSTREAM
SIDE OF POST
" H.G.
BALLAST CHAIN
FOR WEIGHT
FLOTATION
CHAIN TENSIONED THROUGH
S.S. STRESS PLATES, VIA
HOOK AND RING CONNECTION
ANCHOR POINTS
CURTAIN MEMBRANE
ANCHOR POINTS
" GAL
CABLE
CHANNEL BOTTOM
FLOW DIRECTION
CHANNEL BANK
CHANNEL BANK
TURBIDITY CURTAIN
EXTENDS TO BOTTOM
OF CHANNEL
ANCHOR POINTS
ANCHOR POINTS
SECTION VIEW
PLAN VIEW
NOTE: INSTALL AND MAINTAIN TURBIDITY CURTAIN IN ACCORDANCE WITH MANUFACTURE'S
SPECIFICATIONS. CONTRACTOR SHALL SUBMIT TO ENGINEER THE PRODUCT CUT SHEET,
INSTALLATION SPECIFICATIONS, AS WELL AS A MAINTENANCE PLAN/SCHEDULE FOR REVIEW
AND CONCURRENCE. ANCHORING STRUCTURES SHALL BE CONSTRUCTED AND/OR
INSTALLED PER MANUFACTURE'S RECOMMENDATIONS FOR PROPER LATERAL FORCE
REQUIREMENTS.
MIN. 20.0' BERM
1 1
VARIES
MIN. 20.0' BERM
M
A X
DESIGNED BORROW AREA
VARIES
LIMITS OF DISTURBANCE PER PLANS AND SPECIFICATIONS
V A
R I E
S
DEBRIS AND SPOIL AREA
TYPICAL BORROW AREA CROSS-SECTION
M
A X
VARIES
DEBRIS AND SPOIL AREA
(NTS.)
MAX. DEPTH 4.0 FEET AFTER
CLOSING THE BORROW AREA
C
LIFTING HOLE
REF.
B DIA.
O.D.
BOLT DIA. = M
PROJECTION = P
BOLT CIRCLE = BC.
22 1/2 °
22 1/2 °
22 1/2 °
22 1/2 °
A DIA.
D2
No. NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
FRAME
SEAT
RETAINER RING
HEX HEAD BOLT / NUT
COVER
HINGE ARM
PIVOT LUG
HINGE PIN
BUSHING
WASHER
SPRING PIN
HEX HEAD BOLT / NUT
6" CONCRETE HEADWALL
DESIGNED BY FABRICATION
ENGINEER
DEADMAN
(TYP.)
PROPOSED 5' X 4' WATER CONTROL STRUCTURE
PROPOSED 57 STONE SUBGRADE
PROPOSED TIDEGATE
CONNECTING CABLE
(TYP.)
HEADWALL FOOTING BELOW
(TYP.)
PROPOSED PIPE
TOE OF SLOPE
AREA OF SLOPE PROTECTION CLASS A RIP-RAP
SHALL BE PLACED 5 FOOT PAST THE TOE OF SLOPE
TO THE TOP OF THE RISER. ELEVATION DEPTH
OF STONE SHALL BE 18 INCHES. STONE SHALL BE
UNDER LAID WITH NON-WOVEN GEO-TEXTILE.
TOP OF STRUCTURE ELEVATION
TYPICAL SLOPE PROTECTION FOR
BOTH HEADWALL / ENDWALL
TOE OF SLOPE
NON-WOVEN
GEO-TEXTILE
TOP OF STRUCTURE
ELEVATION
TOE OF SLOPE
NON-WOVEN
GEO-TEXTILE
TOP OF STRUCTURE
ELEVATION
2:1 MAX. SIDE SLOPE
2:1 MAX. SIDE SLOPE
PROPOSED HEADWALL / ENDWALL
PROPOSED STRUCTURE
PROPOSED STRUCTURE
PROPOSED HEADWALL / ENDWALL
NTS
SILT FENCE
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
DATE:
PROJ:
DWG:
VERIFY SCALE
SCALE AS SHOWN
W E
T L
A N
D
R
E S
E R
V E
P
R O
G R
A M
O U
T F
A L
L
F
A R
M S
D E
T A
I L S
A
N D
T
Y P
I C
A L
S
E C
T I O
N
SHEET: of 15
9/14/2012
D S
G N
D
R
C H
K
A P
V D
N o
D E
S C
R I P
T I O
N A
P V
D B
Y D
A T
E
J D
H S
D L
T L R
J D
H
I S
S U
F
O
B
I
C
O N
S T
R U
C T
I O
N
J D
H
I S
S U
O N
S T
R U
C T
I O
N
J D
H
D A
T E
ISSUED FOR BID / CONSTRUCTION
CONCEPTUAL HEADWALL / ENDWALL PLAN VIEW
TURBIDITY CURTAIN DETAILS
NTS
NTS
TIDE GATE ELEVATION VIEW
NTS
SEE FABRICATION NOTE (DETAIL SHEET 14)
GATE SPECIFICATIONS:
1. THE WORK COVERED UNDER THIS SPECIFICATION SHALL CONSIST OF FURNISHING AND INSTALLING THE TIDE GATES IN THE QUANTITIES, SIZES AND LOCATION AS SET FORTH IN THE PLANS, SPECIFICATIONS AND BID DOCUMENTS.
2. TIDE GATES SHALL BE A MEDIUM DUTY AUTOMATIC DRAINAGE, THE CONTRACTOR SHALL SUBMIT TO THE PROJECT ENGINEER TECHNICAL
SPECIFICATIONS OF TIDE GATE 6 WEEKS PRIOR TO INSTALLATION.
3. THE FOLLOWING REQUIREMENTS ARE MINIMUM AND MUST BE MET BY THE TIDE GATE MANUFACTURER UNLESS OTHERWISE APPROVED IN WRITING BY THE
ENGINEER.
THE FRAME, COVER, AND HINGE LINK SHALL BE ALUMINUM ALLOY 6061 - T6, ALL SURFACES SHALL HAVE A MILL FINISH.
THE HINGE MECHANISM (BOLTS, WASHERS AND NUTS) SHALL BE TYPE 304 STAINLESS STEEL MEETING THE REQUIREMENTS OF ASTM F 593.
THE "SEAL" THAT INTERFACES THE RIM OF THE RING AND THE HEAD SHALL BE COMPOSED OF NEOPRENE RUBBER ASTM D 2000.
4. ALL WELDING SHALL BE MIG (METAL ARC INERT GAS) IN ACCORDANCE WITH THE REQUIREMENTS OF MILITARY AND FEDERAL SPECIFICATIONS MIL-W-45205.
THE TIDE GATE SHALL BE DESIGNED AND CONSTRUCTED TO WITHSTAND A MINIMUM SEATING HEAD OF THIRTY (30) FEET AND SHALL BE ADJUSTABLE (IN
BOTH THE VERTICAL AND HORIZONTAL DIRECTIONS) TO BE FREE FLOWING ON THE UNSEATING HEAD SIDE. THE TIDE GATE SHALL BE PACKAGED IN A
SECURE MANNER TO REDUCE MOVEMENT OR DAMAGE DURING NORMAL SHIPPING.
CONNECTION TO PRECAST CONCRETE ENDWALLS SHALL BE DESIGNED BY PRECAST FABRICATION ENGINEER AND SUBMITTED TO NRCS PROJECT
ENGINEER FOR APPROVAL. FABRICATION ENGINEER SHALL ALSO SUBMIT ANY AND ALL TIDE GATE DESIGN CALCULATIONS TO NRCS PROJECT ENGINEER
FOR APPROVAL. THIS INFORMATION SHALL BE INCLUDED IN THE SUBMITTAL AS OUTLINE ABOVE IN ITEM B.2.B.
TIDE GATE INSTALLATION INSTRUCTIONS FOR CORRUGATED HDPE-S PIPE:
1. CLEAN THE INSIDE TWELVE INCHES AT THE END OF THE PIPE THAT WILL RECEIVE THE TIDE GATE.
2. APPROXIMATELY THREE (3) INCHES FROM THE END, APPLY A DOUBLE BEAD OF SEALANT (SIKA-FLEX OR EQUAL) ALL AROUND THE INSIDE OF
THE HDPE PIPE.
3. SLIDE THE 12 INCH LONG 3/16 THICK SMOOTH ALUMINUM STUB, FLANGED TO MATCH TIDE GATE, COATED WITH MARINE ADHESIVE SEALANT INTO
THE HDPE PIPE.
4. INSTALL SIX (6) 5/8 INCH ALUMINUM BOLTS EVEN SPACED AROUND THE HDPE PIPE AND THROUGH THE ALUMINUM STUB. THE ALUMINUM BOLTS
WILL HAVE FLAT WASHER ON THE HEAD END AND A FLAT WASHER AND LOCKING NUT ON THE THREADED END. BOLTS SHALL BE INSTALLED
WITH THE BOLT HEAD ON THE INSIDE OF THE PIPE.
5. THE ABOVE INFORMATION IS ONLY SUGGESTED INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE
APPROPRIATE INSTALLATION SEQUENCE/NEEDS IN ORDER TO ENSURE A WATER TIGHT SEAL AND CORRECT FUNCTIONING OF THE TIDE GATE.
TYPICAL SLOPE PROTECTION DETAIL
NTS
LOCKING EYE DETAIL
(BOTH SIDES)
NTS
I S
S U
O N
S T
R U
C T
I O
N
J D
H
S A
O A r e a n g i n e e r i n g P
R O
J E
C T
S
O u t f a l l
F a r m s
C o n s t r u c t i o n
D r a w i n g s S h e e t s
U p d a t e d
D
T
S h e e t d w g
P
M
D
W G
T o
P
D F p c
File details come from the government source that posted it. Updated .