PREPARED BY
NATURAL RESOURCES CONSERVATION SERVICE
WETLAND RESERVE PROGRAM
LOCATION MAP
NTS.
VICINITY MAP
NTS.
PROJECT DESCRIPTION:
THE PURPOSE OF THIS PROJECT IS TO RESTORE THE WETLAND
HYDROLOGY AND ECOLOGY WITHIN OUTFALL FARMS WETLANDS
RESERVE PROGRAM CONSERVATION EASEMENT BOUNDARY.
IMPROVEMENTS WILL INCLUDE HYDROLOGIC ENHANCEMENT,
HYDROLOGY ATTENUATION, AND WATER QUALITY IMPROVEMENTS.
HYDE COUNTY
SWAN QUARTER
SITE
O
UTFALL CANAL RO
AD
CALL 48 HOURS
BEFORE YOU DIG
800-632-4949
Natural Resources Conservation Service
United States Department of Agriculture
E sm t:
4H
W
H
Y D
E C
O U
N
TY
, N .C
D
S G
N
D R
C
H K
A
P V
D
N o.
D E
S C
R
IP
TI
O
N A
P V
D B
Y D
A
TE JD
H S
D L
TL
R
JD
H
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/1
7/
JD
H
/1
7/
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/0
5/
JD
H
/0 5/
D
A
TE
-0
6-
ISSUED FOR BID / CONSTRUCTION
Sheet List Table Sheet Number Sheet Title
1 COVER SHEET
2 GENERAL NOTES
3 OVERALL SITE PLAN
4 WATER CONTROL STRUCTURE A - B
5 WATER CONTROL STRUCTURE C - D
6 WATER CONTROL STRUCTURE E
7 NORTH PATHWAY
8 NORTHWEST PATHWAY
9 SOUTHWEST PATHWAY
10 SOUTHWEST PATHWAY
11 WEST SOUTH PATHWAY
12 SOUTH PATHWAY
13 SOUTH PATHWAY
14 DETAILS
15 DETAILS AND TYPICAL SECTION
WRP
WRP
WRP
W R
P W
R P
WRP
WRP
WRP
W
RP
WRP WRP
WRP
WRP
WRP
WRP
WRP
WRP
O U
TF
A
LL
F
A R
M S
G E
N E
R A
L N
O
TE
S
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
DATE:
PROJ:
DWG:
SHEET: of 15
VERIFY SCALE
9/14/2012
SCALE AS SHOWN
W E
TL
A
N D
R E
S E
R V
E P
R O
G R
A M
SURVEY AND GENERAL NOTES:
1. CONTROL POINT 1 WAS SET WITH A TRIMBLE R8 SYSTEM LOGGING DATA FOR A
STATIC OBSERVATION POINT THIS DATA WAS THEN SENT TO OPUS TO DEVELOP
CONTROL. CONTROL FROM THIS OPUS SOLUTION WAS CALCULATED AS N: 622,145.13
SFT; E: 2,849,817.80 SFT; AND ELEV. 2.16 SFT (NC STATE PLANE 3200 GRID [NAD 83 AND
NAVD 88]). THIS OPUS SOLUTION WAS RECEIVED ON AUGUST 18, 2014. ALL OTHER
SURVEY POINTS TIED TO THIS POINT TO ESTABLISH THE LOCAL GRID. CONTRACTOR
SHALL FIELD VERIFY ALL SURVEY CONTROL POINTS WITHIN THREE (3) WEEKS OF
RECEIPT OF THE NOTICE TO PROCEED. CONTRACTOR SHALL CONTACT NRCS
PROJECT ENGINEER WITHIN FOUR (4) WEEKS OF RECEIPT OF NOTICE TO PROCEED
WITH ANY CONTROL POINT DISCREPANCIES, AFTER SUCH TIME HAS PASSED IT WILL
BE THE ASSUMPTION THAT ALL CONTROL POINTS AS SHOWN ON THE PLANS ARE IN
GOOD STANDING AND CONTRACTOR AGREES WITH PUBLISHED COORDINATES.
2. THIS SURVEY WAS CONDUCTED BY NRCS STAFF WHICH ARE NOT LICENSED SURVEYORS
WITHIN THE STATE OF NORTH CAROLINA. THEREFORE, ALL ELEVATION DATA SHALL BE FIELD
VERIFIED BY THE CONTRACTOR AND THEN COORDINATED WITH THE ENGINEER. THESE
PLANS WERE PREPARED WITH THE FIELD INFORMATION AT THE TIME OF PROJECT SURVEY. IT
IS POSSIBLE THAT FIELD CONDITIONS AT THE TIME OF CONSTRUCTION VARY FROM THESE
PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY FIELD CONDITIONS SUCH AS
ELEVATIONS, DEPTHS, ETC PRIOR TO PROCEEDING WITH WORK. SURVEY DATA COLLECTION
WAS VERY SPARSE DUE TO FIELD CONDITIONS, THEREFORE, ALL ELEVATIONS SHOULD BE
CHECKED IN THE FIELD BY CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
CONTACT PROJECT ENGINEER IMMEDIATELY UPON DISCOVERING ELEVATIONS WHICH ARE
DIFFERENT THAN THOSE SHOWN ON THE PLANS.
3. NRCS SHALL HOLD THE CONTRACTOR TO ± 0.05 FT. TOLERANCE ON ALL WATER
CONTROL STRUCTURES, AND TO ± 0.1 FT. TOLERANCE ON ALL OTHER CONSTRUCTION
AND INSTALLED ITEMS.
4. MAINTAIN, RELOCATE OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS
AND STAKES WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO
PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL MONUMENT(S) IN A
TIMELY MANNER AND AT THE CONTRACTORS EXPENSE.
5. EXISTING TOPOGRAPHY, STRUCTURES AND SITE FEATURES ARE SHOWN SCREENED
AND/OR LIGHT-LINED . NEW FINISHED GRADE, STRUCTURES AND SITE FEATURES ARE
SHOWN AS HEAVY-LINED.
6. ELEVATIONS GIVEN ARE TO SETTLED GRADE UNLESS OTHERWISE SHOWN
7. ALL SLOPES SHALL BE 5:1 OR FLATTER UNLESS OTHERWISE SPECIFIED. SLOPE
UNIFORMLY BETWEEN CONTOURS AND SPOT ELEVATIONS SHOWN.
RECOMMENDED CONSTRUCTION SEQUENCE
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST TO NRCS PROJECT ENGINEER TWO
WEEKS IN ADVANCE FOR ANY DEVIATION FROM THE FOLLOWING SCHEDULE, FOR ANY
UNFORESEEN CIRCUMSTANCE.
1. CONTRACTOR SHALL ACCESS THE PROJECT AS SHOWN ON SHEET 3 OF THIS PLAN
SET.
2. CONTRACTOR SHALL INSTALL SEDIMENT AND EROSION CONTROL PRACTICES AS
SHOWN IN THE PLANS, SPECIFICATIONS AND /OR AS REQUIRED BY PERMITTING
AUTHORITIES.
3. CONSTRUCTOR SHALL INSTALL DE-WATERING DEVICES PER WATER CONTROL
STRUCTURE FABRICATION ENGINEER, FOLLOWING REVIEW AND CONCURRENCE BY
NRCS ENGINEER.
4. COMMENCE PATHWAY GRADING AS DIRECTED IN THE PLANS AND SPECIFICATIONS.
5. REMOVE AND DISPOSE OF EXISTING PIPES AND/OR WATER CONTROL STRUCTURE
AS DIRECTED IN THE PLANS AND SPECIFICATIONS.
6. COMMENCE WATER CONTROL STRUCTURE INSTALLATION AT LOCATION
DESIGNATED IN PLANS AND SPECIFICATIONS.
7. SEED AND PLANT AREAS IN ACCORDANCE WITH CONSTRUCTION SPECIFICATIONS.
SEEDING SHALL BE CONDUCTED IMMEDIATELY FOLLOWING A BID ITEM BEING
BROUGHT TO FINAL GRADE.
8. CONDUCT PUNCH LIST WALK THROUGH, WITH GOVERNMENT REPRESENTATIVE,
PROJECT ENGINEER, AND PROJECT INSPECTOR.
9. ADDRESS PUNCH LIST ITEMS.
10. STABILIZE THE SITE, IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
11. UPON STABILIZATION, REQUEST APPROVAL FOR THE REMOVAL OF TEMPORARY
SEDIMENT AND EROSION CONTROL DEVICES.
12. REMOVE TEMPORARY SEDIMENT AND EROSION CONTROL DEVICES, AFTER
APPROVAL FROM PROJECT ENGINEER.
13. REMOVE EQUIPMENT FROM PROJECT AREA.
AREA OF PROPOSED
SPOIL PILES
WRP
SOIL BORING LOCATION
TP
5:1
L1
ALIGNMENT CURVE MARKERC1
TSF
TS
F
TSF
TS
F
2.35
SLOPE
SPOT ELEVATION
PROPOSED CONTOUR LINE
EMBANKMENT AND SLOPE
DRAINAGEWAY OR DITCH
BRUSH/TREE LINE
WETLAND RESERVE PROGRAM
CONSERVATION EASEMENT
LIMITS
CENTER LINE, BUILDING, ROAD, ETC.
N 1000.00 E 1000.00
STRUCTURE, BUILDING OR FACILITY
LOCATION POINT- COORDINATES
DRAINAGE OR DITCH FLOW
DIRECTION
LIMITS OF DISTURBANCELOD LOD
SILT FENCESF SF
WATER CONTROL STRUCTURE
STRUCTURE
250 EXISTING CONTOUR LINE
ALIGNMENT LINE MARKER
TREE PROTECTION FENCING
OVERHEAD ELECTRICAL LINEOHE OHE
PROFILE BAND LEGEND
0+00
STATION
PROPOSED
ELEVATION
EXISTING
ELEVATION
LEGEND
D S
G N
D
R
C H
K
A P
V D
N o.
D E
S C
R
IP
TI
O
N A
P V
D B
Y D
A
TE JD
H S
D L
TL
R
JD
H
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/1
7/
JD
H
/1
7/
D
A
TE
-0
6-
SHEET KEY MAP
STA = STATION
BM = BENCHMARK
TBM = TEMPORARY BENCHMARK
IP = IRON PIN (FOUND OR SET)
ELEV / EL = ELEVATION
INV = INVERT ELEVATION
H = HEIGHT
HDPE = HIGH-DENSITY POLYETHYLENE
LF = LINEAR FOOT
MAX = MAXIMUM
MIN = MINIMUM
No. / # = NUMBER
TOB = TOP OF BANK
TOS = TOE OF SLOPE
DBT = DITCH BOTTOM
RCP = REINFORCED CONCRETE PIPE
CMP = CORRUGATED METAL PIPE
GALV =` GALVANIZED
SF = SILT FENCE
LOD = LIMITS OF DISTURBANCE
WRP = WETLAND RESERVE PROGRAM
WRE = WETLAND RESERVE EASEMENT
CONC = CONCRETE
W/ = WITH
NCDOT = NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION
NTS = NOT TO SCALE
WCS = WATER CONTROL STRUCTURE
SL = SLOUGH
PC = POINT OF CURVATURE
PT = POINT OF TANGENT
PVI = POINT OF VERTICAL INTERSECTION
PVE = POINT OF VERTICAL INTERSECTION
ELEVATION
R 20 = RADIUS OF 20.0'
TYP. = TYPICAL
ESMT = EASEMENT
I.D. = INSIDE DIMENSION
TH = SOIL BORING TEST HOLE
MS = MAIN STEM
LS = LOG SILL
CL = COVER LOG
LV = LOG VANE
CV = LOG CROSS VANE
RW = ROOT WAD
HB = HABITAT STRUCTURE
BMA = BRUSH MATTRESS
LR = LOG ROLL
LP = LEAF PACK
BLDR = BOULDER
ABBREVIATIONS / ACRONYMS
ISSUED FOR BID / CONSTRUCTION
WRE WETLAND RESERVE EASEMENT
LIMITS
WCS - B
SHEET 4
WCS - C
SHEET 5
WCS - D
SHEET 5
WCS - A
SHEET 4
WCS - E
SHEET 6
NORTH PATHWAY
SHEET 7
NORTHWEST
PATHWAY
SHEET 8
SOUTHWEST
PATHWAY
SHEET 9 - 10
WEST SOUTH
PATHWAY
SHEET 11
SOUTH PATHWAY
SHEET 12 - 13
EAST PATHWAY
CONTROL POINT
IRON PIN SET / CONSTRUCTION
BENCHMARK
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/0
5/
JD
H
/0 5/
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD LOD LOD LOD
LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD LOD LOD LOD LOD
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
W R
P W
R P
W R
P W
R P
W R
P W
R P
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
W
RP
W
RP
W
RP
W
RP
W
RP
W
RP
WRP WRP WRP WRP WRP WRP WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
O U
TF
A
LL
F
A R
M S
O V
E R
A
LL
S
IT
E P
LA
N
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
DATE:
PROJ:
DWG:
VERIFY SCALE
9/14/2012
SCALE AS SHOWN
W E
TL
A
N D
R E
S E
R V
E P
R O
G R
A M
SHEET: of 15
D S
G N
D
R
C H
K
A P
V D
N o.
D E
S C
R
IP
TI
O
N A
P V
D B
Y D
A
TE JD
H S
D L
TL
R
JD
H
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/1
7/
JD
H
/1
7/
D
A
TE
-0
6-
ISSUED FOR BID / CONSTRUCTION
PROPOSED
WATER CONTROL
STRUCTURE A
(SEE SHEET 4)
PROPOSED
WATER CONTROL
STRUCTURE B
(SEE SHEET 4)
PROPOSED
WATER CONTROL
STRUCTURE E
(SEE SHEET 6)
PROPOSED
WATER CONTROL
STRUCTURE C
(SEE SHEET 5)
PROPOSED
WATER CONTROL
STRUCTURE D
(SEE SHEET 5)
CONSTRUCTION
IRON PIN SET
N: 622,203.88 sFT E: 2,853,293.16 sFT ELEV: 1.83 sFT
GRID - LOCAL
APPROXIMATE
WRE BOUNDARY
OUTFALL CANAL ROAD
NOTE:
SEE INDIVIDUAL SHEETS FOR
LIMITS OF DISTURBANCE
HORIZONTAL SCALE: 1" = 600'
6003000 1200 1800
EXISTING NORTH PATH
EXISTING
NORTHWEST PATH
OUTFALL CANAL
EXISTING WEST SOUTH PATH
EXISTING SOUTH PATH
EXISTING EAST PATH
PROPOSED
NORTH PATH
GRADING
(SEE SHEET 7)
PROPOSED
NORTHWEST PATH
GRADING
(SEE SHEET 8)
PROPOSED
SOUTHWEST PATH
GRADING
(SEE SHEETS 9 - 10)
PROPOSED
WEST SOUTH PATH
GRADING
(SEE SHEETS 11)
PROPOSED SOUTH PATH
GRADING (SEE SHEETS 12 - 13)
NO GRADING REQUIRED
ON EAST PATH EXCEPT
AT STRUCTURE LOCATION
GENERAL NOTES
1. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL
PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.
2. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED
AND EXISTING GRADE.
3. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL
REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR
DETAILED INFORMATION.
4. CONTRACTOR TO DISPOSE OF ALL SPOIL, WAIST AND DEBRIS PER
CONSTRUCTION PLANS AND SPECIFICATIONS
PROPOSED BORROW
AREA APPROX.13.20 AC
CONTROL POINT #1
N: 622145.13 sFT E: 2849817.80 sFT ELEV: 2.16 sFT
GRID: NC - 3200
OPUS SOLUTION 08/18/2014
BM
ACCESS SITE VIA BRIDGE
AND FARM PATH
APPROXIMATE
LIMITS OF
DISTURBANCE
APPROXIMATE
LIMITS OF
DISTURBANCE
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/0
5/
JD
H
/0 5/
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD LOD LOD LOD
LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D LOD LOD LOD LOD LOD
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
W R
P W
R P
W R
P W
R P
W R
P W
R P
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
W
RP
W
RP
W
RP
W
RP
W
RP
W
RP
WRP WRP WRP WRP WRP WRP WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
WRP
O U
TF
A
LL
F
A R
M S
O V
E R
A
LL
S
IT
E P
LA
N
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
DATE:
PROJ:
DWG:
VERIFY SCALE
9/14/2012
SCALE AS SHOWN
W E
TL
A
N D
R E
S E
R V
E P
R O
G R
A M
SHEET: of 15
D S
G N
D
R
C H
K
A P
V D
N o.
D E
S C
R
IP
TI
O
N A
P V
D B
Y D
A
TE JD
H S
D L
TL
R
JD
H
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/1
7/
JD
H
/1
7/
D
A
TE
-0
6-
ISSUED FOR BID / CONSTRUCTION
PROPOSED
WATER CONTROL
STRUCTURE A
(SEE SHEET 4)
PROPOSED
WATER CONTROL
STRUCTURE B
(SEE SHEET 4)
PROPOSED
WATER CONTROL
STRUCTURE E
(SEE SHEET 6)
PROPOSED
WATER CONTROL
STRUCTURE C
(SEE SHEET 5)
PROPOSED
WATER CONTROL
STRUCTURE D
(SEE SHEET 5)
CONSTRUCTION
IRON PIN SET
N: 622,203.88 sFT E: 2,853,293.16 sFT ELEV: 1.83 sFT
GRID - LOCAL
APPROXIMATE
WRE BOUNDARY
OUTFALL CANAL ROAD
NOTE:
SEE INDIVIDUAL SHEETS FOR
LIMITS OF DISTURBANCE
HORIZONTAL SCALE: 1" = 600'
6003000 1200 1800
EXISTING NORTH PATH
EXISTING
NORTHWEST PATH
OUTFALL CANAL
EXISTING WEST SOUTH PATH
EXISTING SOUTH PATH
EXISTING EAST PATH
PROPOSED
NORTH PATH
GRADING
(SEE SHEET 7)
PROPOSED
NORTHWEST PATH
GRADING
(SEE SHEET 8)
PROPOSED
SOUTHWEST PATH
GRADING
(SEE SHEETS 9 - 10)
PROPOSED
WEST SOUTH PATH
GRADING
(SEE SHEETS 11)
PROPOSED SOUTH PATH
GRADING (SEE SHEETS 12 - 13)
NO GRADING REQUIRED
ON EAST PATH EXCEPT
AT STRUCTURE LOCATION
GENERAL NOTES
1. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL
PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.
2. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED
AND EXISTING GRADE.
3. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL
REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR
DETAILED INFORMATION.
4. CONTRACTOR TO DISPOSE OF ALL SPOIL, WAIST AND DEBRIS PER
CONSTRUCTION PLANS AND SPECIFICATIONS
PROPOSED BORROW
AREA APPROX.13.20 AC
CONTROL POINT #1
N: 622145.13 sFT E: 2849817.80 sFT ELEV: 2.16 sFT
GRID: NC - 3200
OPUS SOLUTION 08/18/2014
BM
ACCESS SITE VIA BRIDGE
AND FARM PATH
APPROXIMATE
LIMITS OF
DISTURBANCE
APPROXIMATE
LIMITS OF
DISTURBANCE
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/0
5/
JD
H
/0 5/
LOD LOD
LOD LOD LOD LOD LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LODLODLODLOD
LO
D
LO
D
LO
D
LOD
LOD
WCS C:
FUNISH AND INSTALL
4' X 5' PRECAST WATER CONTROL
STRUCTURE WITH HDPE-S PIPE
AND TIDE GATE
TOP OF RISER: 1.65
FIXED PLATE: -0.50
INV. IN: -2.35
0.0
0.
0.0 0.0
0.
0.
0.0
TEMPORARY DEWATERING CONTAINMENT
DEVICE PER PRECAST FABRICATION
ENGINEER AND / OR PERMITTING AGANCY
(TYP.)
CONTRACTOR SHALL FURNISH AND INSTALL
HEADWALL , ENDWALL AND ADDITIONAL
PIPE SUPPORT (IF NEEDED) PER PRECAST
FABRICATION ENGINEER'S SHOP DRAWINGS.
(TYP.) CONTRACTOR SHALL FURNISH AND INSTALL
SLOPE AND SCOUR PROTECTION PER
SPECIFICATIONS AND DETAILS.
REMOVE AND DISPOSE OF
EXISTING CMP AND WATER
CONTROL STRUCTURE PER
CONSTRUCTION SPECIFICATIONS
0+
0+
0+
43+00
44+00
EXISTING PATH
EXISTING PATH
EXISTING PATH
CONTRACTOR SHALL PROVIDE
UNIFORM SLOPE TO EXISTING
DITCH AND WATER CONTROL
STRUCTURE
WSC-C -0+75.00-1+20.00
FURNISH AND INSTALL 1 - 42 IN HDPE
AASHTO M 294 'S' 30.00 LF
INV. IN: -2.35
INV. OUT: -2.35
EXISTING GRADE
FUNISH AND INSTALL
4' X 5' PRECAST
WATER CONTROL STRUCTURE
WITH HEADWALL
TOP OF RISER: 1.65
FIXED PLATE: -0.50
INV. IN: -2.35
MEAN WSE
ELEV: 0.50
GRADE BREAK STA = 0+19.63
ELEV = 1.65
GRADE BREAK STA = 0+27.28
ELEV = 3.15
GRADE BREAK STA = 0+40.02
ELEV = 3.15
GRADE BREAK STA = 0+47.92
ELEV = 1.65
PROPOSED GRADE
PROPOSED TIDE GATE PER
PLANS AND SPECIFICATIONS
INV. ELEV: -2.35
FIXED PLATE
ELEV:-0.50
5:
-Horizontal
-5:1
-0+75 -0+50 0+00
-2 .5
0+50
0.
1+00 1+20
REMOVE AND DISPOSE OF
EXISTING CMP AND WATER
CONTROL STRUCTURE PER
CONSTRUCTION SPECIFICATIONS
CONTRACTOR SHALL FURNISH AND INSTALL
HEADWALL , ENDWALL AND ADDITIONAL
PIPE SUPPORT (IF NEEDED) PER PRECAST
FABRICATION ENGINEER'S SHOP DRAWINGS.
(TYP.)
RIP-RAP SCOUR PROTECTION
WIDTH 2X PIPE DIAMETER BY 2X
PIPE DIAMETER, DEPTH 12 INCHES.
CLASS A RIP-RAP PER SPECIFICATIONS.
UNDERLAY WITH CLASS 1
NON-WOVEN GEO-TEXTILE MATERIAL
RIP-RAP SHALL NOT IMPEDE
TIDE GATE FUNCTION.
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
WCS D:
FURNISH AND INSTALL DUAL (2)
4' X 5' PRECAST WATER CONTROL
STRUCTURES WITH HDPE-S PIPE
AND TIDE GATE,
RISERS TO BE JOINED IN PLACE
TOP OF RISER: 1.65
FIXED PLATE: -0.50
INV IN -3.25'
OWNER TO RELOCATE BUILDING
AND REMOVE FUEL TANK
AREA TO BE FILLED AND
GRADED TO MATCH EXISTING
0.0
0.0
TEMPORARY DEWATERING CONTAINMENT
DEVICE PER PRECAST FABRICATION
ENGINEER AND / OR PERMITTING AGANCY
(TYP.)
REMOVE AND DISPOSE OF
EXISTING CMP AND WATER
CONTROL STRUCTURE AND
EXISTING HEADWALL PER
CONSTRUCTION SPECIFICATIONS
0+00
0+50
0+84
CONTRACTOR SHALL FURNISH AND INSTALL
HEADWALL , ENDWALL AND ADDITIONAL
PIPE SUPPORT (IF NEEDED) PER PRECAST
FABRICATION ENGINEER'S SHOP DRAWINGS.
(TYP.) CONTRACTOR SHALL FURNISH AND INSTALL
SLOPE AND SCOUR PROTECTION PER
SPECIFICATIONS AND DETAILS
EXISTING PATH
TEMPORARY DEWATERING CONTAINMENT
DEVICE PER PRECAST FABRICATION
ENGINEER AND / OR PERMITTING AGANCY
(TYP.)
CONTRACTOR SHALL PROVIDE
UNIFORM SLOPE TO EXISTING
DITCH AND WATER CONTROL
STRUCTURE
WSC-D -0+75.00-1+50.00
FURNISH AND INSTALL 2 - 42 IN HDPE
AASHTO M 294 'S' 72.00 LF
INV. IN: -2.35
INV. OUT: -2.35
MEAN WSE
ELEV: 0.50
PROPOSED GRADE
EXISTING GRADE
FUNISH AND INSTALL DUAL (2)
4' X 5' PRECAST
WATER CONTROL STRUCTURE
WITH HEADWALL
TOP OF RISER: 1.65
FIXED PLATE: -0.50
INV. IN: -2.35
FIXED PLATE
ELEV:-0.50
PROPOSED TIDE GATE PER
PLANS AND SPECIFICATIONS
INV. ELEV: -2.35
5:
Horizontal
-5:1
GRADE BREAK STA = 0+10.11
ELEV = 1.65
GRADE BREAK STA = 0+17.77
ELEV = 3.15
GRADE BREAK STA = 0+49.32
ELEV = 3.15
GRADE BREAK STA = 0+56.99
ELEV = 1.65
-0+75 -0+50 0+00 0+50
2.
3.
1+00 1+50
REMOVE AND DISPOSE OF EXISTING
CMP AND WATER CONTROL STRUCTURE
AND EXISTING HEADWALL PER
CONSTRUCTION SPECIFICATIONS
CONTRACTOR SHALL FURNISH AND INSTALL
HEADWALL , ENDWALL AND ADDITIONAL
PIPE SUPPORT (IF NEEDED) PER PRECAST
FABRICATION ENGINEER'S SHOP DRAWINGS.
(TYP.)
RIP-RAP SCOUR PROTECTION
WIDTH 2X PIPE DIAMETER BY 2X
PIPE DIAMETER, DEPTH 12 INCHES.
CLASS A RIP-RAP PER SPECIFICATIONS.
UNDERLAY WITH CLASS 1
NON-WOVEN GEO-TEXTILE MATERIAL
RIP-RAP SHALL NOT IMPEDE
TIDE GATE FUNCTION.
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
DATE:
PROJ:
DWG:
VERIFY SCALE
SCALE AS SHOWN
W E
TL
A
N D
R E
S E
R V
E P
R O
G R
A M
O U
TF
A
LL
F
A R
M S
W A
TE
R
C O
N
TR
O L
S
TR
U C
TU
R
E C
D
9/14/2012
SHEET: of 15
D S
G N
D
R
C H
K
A P
V D
N o.
D E
S C
R
IP
TI
O
N A
P V
D B
Y D
A
TE JD
H S
D L
TL
R
JD
H
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/1
7/
JD
H
/1
7/
D
A
TE
-0
6-
PLAN VIEW
(1" = 20' HORIZ.)
PROFILE VIEW
(1" = 20' HORIZ., 1" = 2.0' VERT.)
HORIZONTAL SCALE: 1" = 20'
20100 40 60
V E
R
TI
C A
L S
C A
LE
: 1
.0
1.0
2.0
4.0
6.0
ISSUED FOR BID / CONSTRUCTION
GENERAL NOTES
1. CONTRACTOR SHALL STOCK PILE EXCESS SPOIL MATERIAL IN SPOIL PILE
AREAS AS SHOWN ON PLAN SHEETS.
2. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL
PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.
3. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED
AND EXISTING GRADE.
4. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL
REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR
DETAILED INFORMATION.
IS
S U
E D
F O
R B
ID
C O
N S
TR
U
C
TI
O N
/0
5/
JD
H
/0 5/
File details come from the government source that posted it. Updated .