20160706_Outfall_Farms_REV_1_ISSUED_FOR_CONSTRUCTION_SHEETS_6_-_10.pdf

PDF 4 MB Posted

Attached to
Wetland Restoration Project - Hyde County, North Carolina - Easement 664532960048W
Solicitation number
AG-2B46-S-16-0011
Issued by

About this file

Drawings 6-10

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L

O

D

L

O

D

L

O

D

L

O

D

LO

D

LO

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

L

O

D

WCS E:

FUNISH AND INSTALL

4' X 5' PRECAST

WATER CONTROL STRUCTURE

TOP OF RISER: 1.65

FIXED PLATE: -0.50

INV. IN: -3.75

EXISTING WATER CONTROL

STRUCTURE AND CMP

TO BE REMOVED AND

PROPERLY DISPOSED

.0

TEMPORARY DEWATERING CONTAINMENT

DEVICE PER PRECAST FABRICATION

ENGINEER AND / OR PERMITTING AGANCY

(TYP.)

73+00

73+82

REMOVE AND DISPOSE OF

EXISTING CMP AND WATER

CONTROL STRUCTURE PER

CONSTRUCTION SPECIFICATIONS

CONTRACTOR SHALL FURNISH AND INSTALL

HEADWALL , ENDWALL AND ADDITIONAL

PIPE SUPPORT (IF NEEDED) PER PRECAST

FABRICATION ENGINEER'S SHOP DRAWINGS.

(TYP.) CONTRACTOR SHALL FURNISH AND INSTALL

SLOPE PROTECTION PER SPECIFICATIONS AND DETAILS

EXISTING PATH

CONTRACTOR SHALL PROVIDE

UNIFORM SLOPE TO EXISTING

DITCH AND WATER CONTROL

STRUCTURE

WSC-E -0+85.00-1+20.00

EXISTING GRADE

MEAN WSE

ELEV: 0.50

REMOVE AND DISPOSE OF

EXISTING WATER CONTROL

STRUCTURE AND CMP PER

CONSTRUCTION SPECIFICATIONS

FURNISH AND INSTALL 1 - 42 IN HDPE

AASHTO M 294 'S' 33.00 LF

INV. IN: -2.35

INV. OUT: -2.35

PROPOSED GRADE

FUNISH AND INSTALL

4' X 5' PRECAST

WATER CONTROL STRUCTURE

WITH HEADWALL

TOP OF RISER: 1.65

FIXED PLATE: -0.50

INV. IN: -2.35

FIXED PLATE

ELEV:-0.50

-Horizontal

GRADE BREAK STA = 0+12.89

ELEV = 1.65

GRADE BREAK STA = 0+20.12

ELEV = 3.15

GRADE BREAK STA = 0+35.34

ELEV = 3.15

GRADE BREAK STA = 0+43.05

ELEV = 1.65

-0+85 -0+50 0+00

0+50

1+00 1+20

CONTRACTOR SHALL FURNISH AND INSTALL

HEADWALL , ENDWALL AND ADDITIONAL

PIPE SUPPORT (IF NEEDED) PER PRECAST

FABRICATION ENGINEER'S SHOP DRAWINGS.

(TYP.)

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

DATE:

PROJ:

DWG:

VERIFY SCALE

SCALE AS SHOWN

W E

T L

A N

D

R

E S

E R

V E

P

R O

G R

A M

O U

T F

A L

L

F

A R

M S

W A

T E

R

C

O N

T R

S

T R

U C

T U

SHEET: of 15

9/14/2012

D S

G N

D

R

C H

K

A P

V D

N o

D

E S

C R

I P

T I O

N A

P V

D B

Y D

A T

E

J D

H S

D L

T L

R J D

H

I S

S U

D

F

B

I

C

O N

S T

R U

C T

I O

N

J D

H

D A

T E

ISSUED FOR BID / CONSTRUCTION

PLAN VIEW

(1" = 20' HORIZ.)

PROFILE VIEW

(1" = 20' HORIZ., 1" = 2.0' VERT.)

HORIZONTAL SCALE: 1" = 20'

20100 40 60

V E

R T

I C

A

S

A

L E

1.0

2.0

4.0

6.0

GENERAL NOTES

1. CONTRACTOR SHALL STOCK PILE EXCESS SPOIL MATERIAL IN SPOIL PILE

AREAS AS SHOWN ON PLAN SHEETS.

2. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL

PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.

3. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED

AND EXISTING GRADE.

4. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL

REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR

DETAILED INFORMATION.

I S

S U

O N

S T

R U

C T

I O

N

J D

H

NORTH 9+00.00-18+00.00

NORTH 18+00.00-27+00.00

9+50

10+00

10+50

11+00

11+50

12+00

12+50

13+00

13+50

14+00

14+50

15+00

15+50

16+00

16+50

17+00

17+50

18+50

19+00

19+50

20+00

20+50

21+00

21+50

22+00

22+50

23+00

23+50

24+00

24+50

25+00

25+50

26+00

26+50

STA:13+75.34

ELEV:2.25

STA:14+77.18

ELEV:2.25

STA:23+09.27

ELEV:2.25

STA:23+39.97

ELEV:2.25

2+00

41+00

41+16

2+00

41+00

NORTH 36+00.00-41+15.62

36+50

37+00

37+50

38+00

38+50

39+00

39+50

40+00

40+50

41+00

STA:36+35.32

ELEV:2.25

STA:38+77.10

ELEV:2.25

12.0'

CONTRACTOR TO INSURE

SMOOTH TRANSITION AND

POSITIVE DRAINAGE TO

EXISTING GRADE (TYP.)

DESIGN HEIGHT

CONTRACTOR SHALL ADD

3" (0.25') OF TOPSOIL FOR CAPPING

O U

T F

A L L

F

A R

M S

N O

R T

H

P

A T

H W

A Y

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

DATE:

PROJ:

DWG:

VERIFY SCALE

9/14/2012

SCALE AS SHOWN

W E

T L A

N

S

E R

O

G R

A M

SHEET: of 15

D S

G N

D

R

C H

K

A P

V D

N o

D

E S

C R

I P

T I O

N A

P V

D B

Y D

A T

E

J D

H S

D L

T L

R J D

H

I S

S U

O N

S T

R U

C T

I O

N

J D

H

D A

T E

PLAN VIEW

SCALE: 1" = 150'

ISSUED FOR BID / CONSTRUCTION

HORIZONTAL SCALE: 1" = 40'

40200 80 120

V E

R T

I C

A L

S

C A

L E

2.0

4.0

8.0

12.0

PROPOSED

WATER CONTROL

STRUCTURE A

(SEE SHEET 4)

EXISTING NORTH PATH

PROPOSED GRADING

START STA: 13+75.34

END STA: 14+77.18

PROPOSED GRADING

START STA: 23+09.27

END STA: 23+39.97

PROPOSED GRADING

START STA: 36+35.32

END STA: 38+77.10

PROFILE VIEW

(1" = 40' HORIZ., 1" = 4.0' VERT.)

GENERAL NOTES

1. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL

PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.

2. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED

AND EXISTING GRADE.

3. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL

REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR

DETAILED INFORMATION.

4. CONTRACTOR TO DISPOSE OF ALL SPOIL, WAIST AND DEBRIS PER

CONSTRUCTION PLANS AND SPECIFICATIONS

NORTH PATHWAY IMPROVEMENT TABLE

START STOP

APPROX.

LENGTH

TOP ELEV.

STA: 13+75.34 STA: 14+77.18 101 L.F. 2.25

STA: 23+09.27 STA: 23+39.97 30 L.F. 2.25

STA: 36+35.32 STA: 38+77.10 241 L.F. 2.25

HORIZONTAL SCALE: 1" = 150'

150750 300 450

SEE TYPICAL PATHWAY

CROSS SECTION (THIS SHEET)

TYPICAL PATHWAY CROSS SECTION

I S

S U

O N

S T

R U

C T

I O

N

J D

H

NORTHWEST 9+00.00-18+00.00

NORTHWEST 18+00.00-27+00.00

9+50

10+00

10+50

11+00

11+50

12+00

12+50

13+00

13+50

14+00

14+50

15+00

15+50

16+00

16+50

17+00

17+50

18+50

19+00

19+50

20+00

20+50

21+00

21+50

22+00

22+50

23+00

23+50

24+00

24+50

25+00

25+50

26+00

26+50

STA:13+75.27

ELEV:2.25

STA:14+77.14

ELEV:2.25

STA:23+09.21

ELEV:2.25

STA:23+39.94

ELEV:2.25

NORTHWEST 36+00.00-41+30.00

36+50

37+00

37+50

38+00

38+50

39+00

39+50

40+00

40+50

41+00

STA:36+35.25

ELEV:2.25

STA:38+77.22

ELEV:2.25

O U

T F

A L L

F

A R

M S

N O

R T

H W

E S

T

P

A T

H W

A Y

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

DATE:

PROJ:

DWG:

VERIFY SCALE

9/14/2012

SCALE AS SHOWN

W E

T L A

S

E R

O

G R

A M

SHEET: of 15

D S

G N

D

R

C H

K

A P

V D

N o

D

E S

C R

I P

T I O

N A

P V

D B

Y D

A T

E

J D

H S

D L

T L

R J D

H

I S

S U

O N

S T

R U

C T

I O

N

J D

H

D A

T E

ISSUED FOR BID / CONSTRUCTION

HORIZONTAL SCALE: 1" = 40'

40200 80 120

V E

R T

I C

A L

S

C A

L E

2.0

4.0

8.0

12.0

PROPOSED

WATER CONTROL

STRUCTURE A

(SEE SHEET 4)

EXISTING NORTH PATH

PROPOSED GRADING

START STA: 23+09.21

END STA: 23+39.94

ELEV: 2.25

PROPOSED GRADING

START STA: 13+75.27

END STA: 14+77.14

ELEV: 2.25

PROPOSED GRADING

START STA: 36+35.25

END STA: 38+77.22

PROPOSED

WATER CONTROL

STRUCTURE B

(SEE SHEET 4)

EXISTING NORTHWEST PATH

PROFILE VIEW

(1" = 40' HORIZ., 1" = 4.0' VERT.)

GENERAL NOTES

1. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL

PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.

2. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED

AND EXISTING GRADE.

3. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL

REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR

DETAILED INFORMATION.

4. CONTRACTOR TO DISPOSE OF ALL SPOIL, WAIST AND DEBRIS PER

CONSTRUCTION PLANS AND SPECIFICATIONS

NORTHWEST PATHWAY IMPROVEMENT TABLE

START STOP

APPROX.

LENGTH

TOP ELEV.

STA: 13+75.27 STA: 14+77.14 102 L.F. 2.25

STA: 23+09.21 STA: 23+39.94 31 L.F. 2.25

STA: 36+35.25 STA: 38+77.22 242 L.F. 2.25

HORIZONTAL SCALE: 1" = 150'

150750 300 450

PLAN VIEW

SCALE: 1" = 150'

SEE TYPICAL PATHWAY

CROSS SECTION (SHEET 7)

I S

S U

O N

S T

R U

C T

I O

N

J D

H

SOUTHWEST 0+00.00-9+00.00

0+50

1+00

1+50

2+00

2+50

3+00

3+50

4+00

4+50

5+00

5+50

6+00

6+50

7+00

7+50

8+00

8+50

STA:0+10.07

ELEV:2.25

SOUTHWEST 9+00.00-18+00.00

9+50

10+00

10+50

11+00

11+50

12+00

12+50

13+00

13+50

14+00

14+50

15+00

15+50

16+00

16+50

17+00

17+50

SOUTHWEST 18+00.00-27+00.00

18+50

19+00

19+50

20+00

20+50

21+00

21+50

22+00

22+50

23+00

23+50

24+00

24+50

25+00

25+50

26+00

26+50

STA:26+13.45

ELEV:2.25

STA:26+65.67

ELEV:2.25

27+50

28+00

28+50

29+00

29+50

30+00

30+50

31+00

31+50

32+00

32+50

33+00

STA:27+35.98

ELEV:2.25

STA:28+54.60

ELEV:2.25

STA:30+04.90

ELEV:2.25

STA:30+96.23

ELEV:2.25

STA:32+76.92

ELEV:2.25

O U

T F

A L L

F

A R

M S

S O

U T

H W

E S

T

P

A T

H W

A Y

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

DATE:

PROJ:

DWG:

VERIFY SCALE

9/14/2012

SCALE AS SHOWN

W E

T L A

S

E R

O

G R

A M

SHEET: of 15

D S

G N

D

R

C H

K

A P

V D

N o

D

E S

C R

I P

T I O

N A

P V

D B

Y D

A T

E

J D

H S

D L

T L

R J D

H

I S

S U

O N

S T

R U

C T

I O

N

J D

H

D A

T E

ISSUED FOR BID / CONSTRUCTION

HORIZONTAL SCALE: 1" = 150'

150750 300 450

EXISTING SOUTHWEST PATH

BASE POINT #2

N: 622145.127

E: 2849817.795

ELEV: 2.155

PROPOSED GRADING

START STA: 0+10.07

END STA: 26+13.45

ELEV: 2.25

PROPOSED GRADING

START STA: 26+65.67

END STA: 27+35.98

ELEV: 2.25

PROPOSED GRADING

START STA: 28+54.60

END STA: 30+04.90

ELEV: 2.25

PROPOSED GRADING

START STA: 30+96.23

END STA: 32+76.92

ELEV: 2.25

PLAN VIEW

SCALE: 1" = 150'

GENERAL NOTES

1. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL

PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.

2. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED

AND EXISTING GRADE.

3. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL

REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR

DETAILED INFORMATION.

4. CONTRACTOR TO DISPOSE OF ALL SPOIL, WAIST AND DEBRIS PER

CONSTRUCTION PLANS AND SPECIFICATIONS

HORIZONTAL SCALE: 1" = 40'

40200 80 120

V E

R T

I C

A L

S

C A

L E

2.0

4.0

8.0

12.0

SOUTHWEST 27+00.00-33+50.00

SOUTHWEST PATHWAY IMPROVEMENT TABLE

START STOP

APPROX.

LENGTH

TOP ELEV.

STA: 0+10.07 STA: 26+13.45 2603 L.F. 2.25

STA: 26+65.67 STA: 27+35.98 71 L.F. 2.25

STA: 28+54.60 STA: 30+04.90 151 L.F. 2.25

STA: 30+96.23 STA: 32+76.92 181 L.F. 2.25

M A

T C

H L I N

E

M A

T C

H L I N

E

SEE TYPICAL PATHWAY

CROSS SECTION (SHEET 7)

S H

E E

T

S H

E E

T

I S

S U

O N

S T

R U

C T

I O

N

J D

H

33+00

33+50

34+00

34+50

35+00

35+50

STA:35+07.96

ELEV:2.25

SOUTHWEST 36+00.00-45+00.00

36+50

37+00

37+50

38+00

38+50

39+00

39+50

40+00

40+50

41+00

41+50

42+00

42+50

43+00

43+50

44+00

44+50

STA:43+20.68

ELEV:2.25

SOUTHWEST 54+00.00-63+00.00

54+50

55+00

55+50

56+00

56+50

57+00

57+50

58+00

58+50

59+00

59+50

60+00

60+50

61+00

61+50

62+00 62+50

STA:57+99.05

ELEV:2.25

STA:58+28.30

ELEV:2.25

STA:58+91.23

ELEV:2.25

STA:59+51.40

ELEV:2.25

O U

T F

A L L

F

A R

M S

S O

U T

H W

E S

T

P

A T

H W

A Y

BAR IS ONE INCH ON

ORIGINAL DRAWING

0 1"

DATE:

PROJ:

DWG:

VERIFY SCALE

9/14/2012

SCALE AS SHOWN

W E

T L A

S

E R

O

G R

A M

SHEET: of 15

D S

G N

D

R

C H

K

A P

V D

N o

D

E S

C R

I P

T I O

N A

P V

D B

Y D

A T

E

J D

H S

D L

T L

R J D

H

I S

S U

O N

S T

R U

C T

I O

N

J D

H

D A

T E

ISSUED FOR BID / CONSTRUCTION

HORIZONTAL SCALE: 1" = 40'

20100 40 60

V E

R T

I C

A L

S

C A

L E

2.0

4.0

8.0

12.0

PROFILE VIEW

(1" = 40' HORIZ., 1" = 4.0' VERT.)

GENERAL NOTES

1. CONTRACTOR SHALL ADHERE TO ALL SEDIMENT AND EROSION CONTROL

PRACTICES AS SPECIFIED WITHIN THIS CONTRACT.

2. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS BETWEEN PROPOSED

AND EXISTING GRADE.

3. SHADED AREAS DEPICTED IN PLAN VIEWS ARE FOR GRAPHICAL

REPRESENTATION ONLY, SEE PROFILES AND TYPICAL CROSS SECTIONS FOR

DETAILED INFORMATION.

4. CONTRACTOR TO DISPOSE OF ALL SPOIL, WAIST AND DEBRIS PER

CONSTRUCTION PLANS AND SPECIFICATIONS

EXISTING SOUTHWEST PATH

EXISTING EAST PATH

PROPOSED

WATER CONTROL

STRUCTURE E

(SEE SHEET 6)

PROPOSED GRADING

START STA: 35+07.96

END STA: 43+20.68

ELEV: 2.25

PROPOSED GRADING

START STA: 57+99.05

END STA: 58+28.30

ELEV: 2.25

PROPOSED GRADING

START STA: 58+91.23

END STA: 59+51.40

ELEV: 2.25

PLAN VIEW

SCALE: 1" = 150'

SOUTHWEST 32+50.00-36+00.00

HORIZONTAL SCALE: 1" = 150'

150750 300 450

SOUTHWEST PATHWAY IMPROVEMENT TABLE

START STOP

APPROX.

LENGTH

TOP ELEV.

STA: 35+07.96 STA: 43+20.68 813 L.F. 2.25

STA: 57+99.05 STA: 58+28.30 30 L.F. 2.25

STA: 58+91.23 STA: 59+51.40 60 L.F. 2.25

S H

E E

T

S H

E E

T

BASE POINT #1

N: 622203.999

E: 2853293.133

ELEV: 1.837

SEE TYPICAL PATHWAY

CROSS SECTION (SHEET 7)

M A

T C

H L I N

E

M A

T C

H L I N

E

I S

S U

O N

S T

R U

C T

I O

N

J D

H

File details come from the government source that posted it. Updated .