General Decision Number: RI100001 07/16/2010 RI1
Superseded General Decision Number: RI20080001
State: Rhode Island
Construction Types: Building, Heavy (Heavy and Marine) and Highway
Counties: Rhode Island Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE
CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 03/26/2010 3 04/16/2010 4 05/28/2010 5 06/18/2010 6 06/25/2010 7 07/16/2010
ASBE0006-008 09/01/2009
Rates Fringes
Asbestos Worker/Insulator Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems.....................$ 35.25 19.88
ASBE0201-004 06/01/2005
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.65 9.95
BOIL0029-001 10/01/2009
Rates Fringes
BOILERMAKER......................$ 38.25 17.04
BRRI0001-001 03/01/2010
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 33.80 18.65
BRRI0001-002 03/01/2010
Rates Fringes
Marble Setter, Terrazzo Worker & Tile Setter.............$ 33.80 19.50
BRRI0001-003 03/01/2010
Rates Fringes
Marble, Tile & Terrazzo Finisher.........................$ 28.80 18.40
* CARP0094-001 06/06/2010
Rates Fringes
CARPENTER: SOFT FLOOR LAYER......$ 30.90 21.43
Diver Tender.....................$ 31.90 21.43 Diver............................$ 43.42 21.43
MILLWRIGHT.......................$ 31.90 21.43
Piledriver.......................$ 31.90 21.43
WELDER...........................$ 31.90 21.43
FOOTNOTES:
When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.
Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.
Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.
The designated piledriver, known as the "monkey": $1.00 per hour additional.
ELEC0099-002 06/01/2009
Rates Fringes
ELECTRICIAN......................$ 34.08 53.34%
Teledata System Installer........$ 25.56 12.1%+10.36
FOOTNOTES:
Work of a hazardous nature, or where the work height is 30
ft. or more from the floor, except when working OSHA-approved lifts: 20% per hour additional.
Work in tunnels below ground level in combined sewer outfall:
20% per hour additional.
ELEV0039-001 01/01/2010
Rates Fringes
ELEVATOR MECHANIC................$ 42.13 20.035+A+B
FOOTNOTES:
A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0057-001 06/01/2010
Rates Fringes
Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, subterranean & other marine and heavy construction work) GROUP 1.....................$ 32.90 19.85+a GROUP 2.....................$ 28.52 19.85+a GROUP 3.....................$ 25.67 19.85+a GROUP 4.....................$ 31.95 19.85+a GROUP 5.....................$ 31.62 19.85+a GROUP 6.....................$ 28.60 19.85+a GROUP 7.....................$ 32.52 19.85+a
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
FOOTNOTES:
Hazmat work: $2.00 per hour additional.
Tunnel work: $2.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Digging machine, Ross Carrier, crane, lighter, locomotive, derrick, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer & vacuum truck.
GROUP 2: Fireman & oiler.
GROUP 3: Oiler on crawler backhoe.
GROUP 4: Bulldozer, bobcat, tractor, grader, scraper, pippin-type backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).
GROUP 5: Well-point installation crew.
GROUP 6: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.
GROUP 7: Boat & tug operator.
ENGI0057-002 11/01/2009
Rates Fringes
Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects which are incidental to highway construction projects) GROUP 1....................$ 28.05 19.10+a GROUP 2....................$ 26.58 19.10+a GROUP 3....................$ 20.63 19.10+a GROUP 4....................$ 23.33 19.10+a GROUP 5....................$ 27.03 19.10+a GROUP 6....................$ 26.65 19.10+a GROUP 7....................$ 22.30 19.10+a GROUP 8....................$ 23.68 19.10+a GROUP 9....................$ 25.63 19.10+a GROUP 10....................$ 26.10 19.10+a GROUP 11....................$ 26.48 19.10+a
FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.
PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator
GROUP 2: Fireman
GROUP 3: Oiler
GROUP 4: Oiler on truck crane, gradall & crawler crane
GROUP 5: Pippin type backhoe, front end loader (less than 3 yds.), bulldozer & scraper
GROUP 6: Roller, bobcat, street sweeper
GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor
GROUP 8: Stone crusher
GROUP 9: Mechanic & welder
GROUP 10: Shovel operator, front end loader & dragline
GROUP 11: Well point installation crew
ENGI0057-003 06/01/2010
BUILDING CONSTRUCTION
Rates Fringes
Power Equipment Operator GROUP 1....................$ 32.17 19.85+a GROUP 2....................$ 31.95 19.85+a GROUP 3....................$ 27.95 19.85+a GROUP 4....................$ 25.10 19.85+a GROUP 5....................$ 31.25 19.85+a GROUP 6....................$ 30.82 19.85+a GROUP 7....................$ 28.14 19.85+a
BOOM LENTHS, INCLUDING JIBS:
150 ft. and over: + $1.25 180 ft. and over: + $2.25 210 ft. and over: + $3.25 240 ft. and over: + $4.25 270 ft. and over: + $6.25 300 ft. and over: + $7.25
PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
FOOTNOTE: Hazmat work: $2.00 per hour additional. Tunnel work: $2.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Digging machine, Ross carrier, crane, lighter, locomotive, derrick, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck
GROUP 2: Economobile-type equipment, forklift, concrete pump & on-site concrete plant
GROUP 3: Fireman & oiler
GROUP 4: Oiler on crawler backhoe
GROUP 5: Bulldozer, bobcat, tractor, grader, scraper, pippin-type backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)
GROUP 6: Well point installation crew
GROUP 7: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor
IRON0037-001 06/01/2009
Rates Fringes
IRONWORKER.......................$ 30.45 19.47
LABO0271-001 12/01/2008
BUILDING CONSTRUCTION
Rates Fringes
LABORER
GROUP 1.....................$ 25.10 16.00
GROUP 2.....................$ 25.35 16.00
GROUP 3.....................$ 25.85 16.00
GROUP 4.....................$ 26.10 16.00
GROUP 5.....................$ 27.10 16.00
LABORERS CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]
GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator
GROUP 3: Pre-Cast Floor & Roof Plank Erectors
GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster
GROUP 5: Toxic Waste Remover
LABO0271-002 06/01/2009
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
LABORER
COMPRESSED AIR
Group 1....................$ 42.53 16.75 Group 2....................$ 32.05 16.75 Group 3....................$ 44.53 16.75
FREE AIR
Group 1....................$ 34.60 16.75 Group 2....................$ 32.05 16.75 Group 3....................$ 36.60 16.75
LABORER
Group 1....................$ 25.10 16.75 Group 2....................$ 25.35 16.75 Group 3....................$ 26.10 16.75 Group 4....................$ 18.60 16.75 Group 5....................$ 27.10 16.75
OPEN AIR CAISSON,
UNDERPINNING WORK AND
BORING CREW
Bottom Man.................$ 31.10 16.75 Top Man & Laborer..........$ 30.15 16.75
TEST BORING
Driller....................$ 31.55 16.75 Laborer....................$ 30.15 16.75
LABORER CLASSIFICATIONS
GROUP 1: Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries
GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;
Pipelayer; Pipe trench bracer
GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster
GROUP 4: Flagger & signaler
GROUP 5: Toxic waste remover
LABORER - COMPRESSED AIR CLASSIFICATIONS
GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air
GROUP 2: Change house attendant, powder watchperson, top person on iron
GROUP 3: Hazardous waste work within the "HOT" zone
LABORER - FREE AIR CLASSIFICATIONS
GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator
GROUP 2: Change house attendant, powder watchperson
GROUP 3: Hazardous waste work within the "HOT" zone
PAIN0011-005 06/01/2009
Rates Fringes
PAINTER
Brush, Roller, Taper, Wall Cover.......................$ 27.65 15.27 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 29.65 15.27 Spray, Sand & Water Blasting....................$ 28.65 15.27
PAIN0011-006 06/01/2010
Rates Fringes
GLAZIER..........................$ 32.03 15.40
FOOTNOTES:
SWING STAGE: $1.00 per hour additional.
PAID HOLIDAYS: Labor Day & Christmas Day.
PAIN0011-011 06/01/2010
Rates Fringes
Painter (Bridge Work)...........$ 39.83 15.82
PAIN0035-008 06/01/2009
Rates Fringes
Sign Painter.....................$ 24.81 13.22
PLAS0040-001 06/07/2009
BUILDING CONSTRUCTION
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.75 19.70
PLASTERER........................$ 30.50 18.95
FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.
PLAS0040-002 07/20/2009
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.00 15.15
PLUM0051-002 03/01/2010
Rates Fringes
Plumbers and Pipefitters.........$ 34.36 24.47
ROOF0033-004 01/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 29.45 17.70
SFRI0676-001 01/01/2010
Rates Fringes
SPRINKLER FITTER.................$ 39.50 17.85
SHEE0017-002 07/01/2006
Rates Fringes
Sheet Metal Worker...............$ 29.60 22.61
TEAM0251-001 05/01/2009
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 25.71 14.0525+A+B
GROUP 2....................$ 25.86 14.0525+A+B
GROUP 3....................$ 25.91 14.0525+A+B
GROUP 4....................$ 25.96 14.0525+A+B
GROUP 5....................$ 26.06 14.0525+A+B
GROUP 6....................$ 26.21 14.0525+A+B
GROUP 7....................$ 26.46 14.0525+A+B
GROUP 8....................$ 26.16 14.0525+A+B
GROUP 9....................$ 26.41 14.0525+A+B
GROUP 10....................$ 26.66 14.0525+A+B
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Washington's Birthday, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.
B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.
Tunnel rate for trucks actually going underground - add .40 per hour to rate according to equipment.
On equipment used to haul powder add .25 per hour above rate according to axle.
All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Pick-up trucks, station wagons, & panel trucks
GROUP 2: Stake body on low beds
GROUP 3: Two-axle dump truck
GROUP 4: Three-axle dump truck
GROUP 5: Four- and five-axle equipment
GROUP 6: Low-bed or boom trailer
GROUP 8: Special earth-moving equipment, under 35 tons
GROUP 9: Special earth-moving equipment, 35 tons or over
GROUP 10: Tractor trailer
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5 (a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Other files
| File | Type | Posted |
|---|---|---|
| Sampling Locations.pdf | ||
| RFI Question.docx | DOCX document | |
| Exceedances Summary.pdf | ||
| Oxbows Full Set 8-6-10_2.pdf | ||
| NAE-2010-1107 IP.PDF | ||
| Construction Specs COMPLETE_final 8-6-10.pdf | ||
| Amend6.pdf | ||
| Oxbows Permit.pdf | ||
| SumCo RFI.doc | DOC document | |
| Bid Schedule 8-6-10.pdf | ||
| Amend5.pdf | ||
| Amend4.pdf | ||
| Bid Schedule 6-1-10.docx | DOCX document | |
| Amend3.pdf | ||
| Request for Informatio1.docx | DOCX document | |
| Amend1.pdf | ||
| Amend2.pdf | ||
| SF1442.pdf | ||
| Bid Schedule and Clauses.docx | DOCX document | |
| Attachment 2 Oxbows Construction Specs 6-1-10.docx | DOCX document | |
| Oxbows Construction Drawings 6-1-10.pdf | ||
| ATTACH 1 General Decision Number.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .