Bid Schedule 6-1-10.docx
DOCX document 20 KB Posted
- Attached to
- RECOVER - OXBOWS FLOODPLAIN RESTORATION
- Solicitation number
- AG-1535-S-10-0018
About this file
Bid Schedule dated 7/23/2010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sampling Locations.pdf | ||
| RFI Question.docx | DOCX document | |
| Exceedances Summary.pdf | ||
| Oxbows Full Set 8-6-10_2.pdf | ||
| NAE-2010-1107 IP.PDF | ||
| Construction Specs COMPLETE_final 8-6-10.pdf | ||
| Amend6.pdf | ||
| Oxbows Permit.pdf | ||
| SumCo RFI.doc | DOC document | |
| Bid Schedule 8-6-10.pdf | ||
| Amend5.pdf | ||
| Amend4.pdf | ||
| Amend3.pdf | ||
| RI1_dvb.htm | HTM file | |
| Request for Informatio1.docx | DOCX document | |
| Amend1.pdf | ||
| Amend2.pdf | ||
| SF1442.pdf | ||
| Bid Schedule and Clauses.docx | DOCX document | |
| Attachment 2 Oxbows Construction Specs 6-1-10.docx | DOCX document | |
| Oxbows Construction Drawings 6-1-10.pdf | ||
| ATTACH 1 General Decision Number.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule - Oxbows Floodplain Restoration Project
| Bid Item |
| Sub Level 1 |
| Description |
| NRCS Spec. No. |
| Supp'l Spec. No. |
| Units |
| QTY |
| Unit Price |
| Total Price |
Temporary Facilities and Controls
| - |
| - |
| - |
| - |
| 1 |
| Temporary Construction Entrance and Access Roads |
| 5 |
| - |
| LS |
| 1 |
| 2 |
| Staging and Stockpile Area |
| 5 |
| - |
| LS |
| 1 |
Erosion and Sediment Control
| 3 |
| Installation of Silt Fence and Hay Bales |
| 5 |
| - |
| LS |
| 1 |
| 4 |
| Removal of Silt Fence and Hay Bales |
| - |
| - |
| LS |
| 1 |
| 5 |
| Removal of Temporary Facilities and Controls |
| - |
| - |
| LS |
| 1 |
Cofferdam and Dewatering
| - |
| - |
| - |
| - |
Installation and Removal of Cofferdam
| - |
| - |
| - |
| - |
| 1 |
| Phase I - Dike Removal |
| 11 |
| - |
| LS |
| 1 |
| 2 |
| Phase II - Oxbow 2 Connection Channel |
| 11 |
| - |
| LS |
| 1 |
| 3 |
| Phase III - Oxbow 3 Connection Channel |
| 11 |
| - |
| LS |
| 1 |
| 4 |
| Phase V -Oxbow 1 Connection Channel |
| 11 |
| - |
| LS |
| 1 |
Execution of Dewatering Requirements
| - |
| - |
| - |
| - |
| 5 |
| Phase I - Dike Removal |
| 11 |
| - |
| LS |
| 1 |
| 6 |
| Phase II - Oxbow 2 Connection Channel |
| 11 |
| - |
| LS |
| 1 |
| 7 |
| Phase III - Oxbow 3 Connection Channel |
| 11 |
| - |
| LS |
| 1 |
| 8 |
| Phase V -Oxbow 1 Connection Channel |
| 11 |
| - |
| LS |
| 1 |
Site Work
| 1 |
| Clearing and Grubbing |
| 2,4 |
| - |
| LS |
| 1 |
| 2 |
| Clearing Oxbow 2 and 3 Connection Culvert |
| 1 |
| - |
| LS |
| 1 |
| 3 |
| Soil/Sediment Excavation |
| 21 |
| - |
| CY |
| 2100 |
| 4 |
| Grading/Fill |
| 23 |
| - |
| CY |
| 100 |
| 5 |
| Furnish and Place Riprap |
| 61 |
| - |
| CY |
| 15 |
| 6 |
| Top Soil |
| 26 |
| - |
| SY |
| 2750 |
| 7 |
| Coconut Fiber Matting |
| - |
| 401 |
| SY |
| 2750 |
| 8 |
| Geo-Grid Material/Installation (Tensar TX5) |
| - |
| 402 |
| SY |
| 265 |
| 9 |
| Log Crib |
| - |
| 405 |
| LF |
| 340 |
| 10 |
| Log Check Dam |
| - |
| 403 |
| LS |
| 1 |
| 11 |
| Foot Bridge |
| - |
| 404 |
| LS |
| 1 |
| 12 |
| Stone Crossing |
| 25 |
| - |
| LS |
| 1 |
| 13 |
| Seeding/ Vegetation |
| 6 |
| - |
| LS |
| 1 |
| 14 |
| Concrete Removal |
| 3 |
| - |
| LS |
| 1 |
| Mobilization/Demobilization |
| 8 |
| - |
| LS |
| 1 |
TOTAL:
File details come from the government source that posted it. Updated .