Bid Schedule 8-6-10.pdf

PDF 18 KB Posted

Attached to
RECOVER - OXBOWS FLOODPLAIN RESTORATION
Solicitation number
AG-1535-S-10-0018
Issued by

About this file

New Bid Schedule

View the file

Other files

File Type Posted
Sampling Locations.pdf PDF
RFI Question.docx DOCX document
Exceedances Summary.pdf PDF
Oxbows Full Set 8-6-10_2.pdf PDF
NAE-2010-1107 IP.PDF PDF
Construction Specs COMPLETE_final 8-6-10.pdf PDF
Amend6.pdf PDF
Oxbows Permit.pdf PDF
SumCo RFI.doc DOC document
Amend5.pdf PDF
Amend4.pdf PDF
Bid Schedule 6-1-10.docx DOCX document
Amend3.pdf PDF
RI1_dvb.htm HTM file
Request for Informatio1.docx DOCX document
Amend1.pdf PDF
Amend2.pdf PDF
SF1442.pdf PDF
Bid Schedule and Clauses.docx DOCX document
Attachment 2 Oxbows Construction Specs 6-1-10.docx DOCX document
Oxbows Construction Drawings 6-1-10.pdf PDF
ATTACH 1 General Decision Number.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule - Oxbows Floodplain Restoration Project

Bid Item

Sub Level 1 Description

NRCS

Spec.

No.

Supp'l Spec.

No. Units QTY

Unit Price

Total Price

1 Temporary Facilities and Controls - - - -

Temporary Construction Entrance and Access Roads 5 - LS 1

2 Staging and Stockpile Area 5 - LS 1 Erosion and Sediment Control

Installation of Silt Fence and Hay Bales 5 - LS 1

4 Removal of Silt Fence and Hay Bales - - LS 1

Removal of Temporary Facilities and Controls - - LS 1

2 Cofferdam and Dewatering - - - - Installation and Removal of Cofferdam - - - - 1 Phase I - Dike Removal 11 - LS 1

Phase II - Oxbow 2 Connection Channel 11 - LS 1

Phase III - Oxbow 3 Connection Channel 11 - LS 1

Phase V -Oxbow 1 Connection Channel 11 - LS 1

Execution of Dewatering Requirements - - - - 5 Phase I - Dike Removal 11 - LS 1

Phase II - Oxbow 2 Connection Channel 11 - LS 1

Phase III - Oxbow 3 Connection Channel 11 - LS 1

Phase V -Oxbow 1 Connection Channel 11 - LS 1

3 Site Work - - - - 1 Clearing and Grubbing 2,4 - LS 1

Clearing Oxbow 2 and 3 Connection Culvert 1 - LS 1

3 Soil/Sediment Excavation 21 - CY 650 4 Grading/Fill 23 - CY 100 5 Furnish and Place Riprap 61 - CY 15 6 Top Soil 26 - CY 1400 7 Coconut Fiber Matting - 401 SY 1400

Geo-Grid Material/Installation (Tensar

TX5) - 402 SY 265

9 Log Crib - 405 LF 340 10 Log Check Dam - 403 LS 1 11 Foot Bridge - 404 LS 1 12 Stone Crossing 25 - LS 1 13 Seeding/ Vegetation 6 - LS 1 14 Concrete Removal 3 - LS 1 4 Mobilization/Demobilization 8 - LS 1

TOTAL: