Specifications.docx

DOCX document 142 KB Posted

Attached to
RECOVERY - Walton Lake Trail Reconstruction - Ochoco National Forest, Oregon
Solicitation number
AG-0489-S-10-0409
Issued by

About this file

Supplemental Specifications Special Project Specifications and Construction Standards Institute Specifications

View the file

Other files

File Type Posted
Pre-Proposal Summary.doc DOC document
Amendment_2.pdf PDF
Amendment 2 Continuation.docx DOCX document
Amendment_1.pdf PDF
Specification List.xls XLS spreadsheet
RFP_Walton_Lake_Trail.doc DOC document
Offer Submittal Packet.doc DOC document
Drawings 1-42.pdf PDF
R-6_Trail_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.07_nat_us_02_17_2005 Add Subsection.

104.07 Other Contracts.

Walton Lake Campground is currently under construction. Contractor will be required to coordinate construction activities with campground contractor so as not to impede their progress.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.02_nat_us_03_08_2007

105.02 Material Sources.

105.02(a) Contractor-provided sources.

Add the following:

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work will be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area. The following applies to this contract:

A Forest Service weed specialist will inspect proposed sources to determine weed-free status. Provide the Contracting Officer written notification of proposed material sources 14 days prior to use. Written approval of the specific source will be provided to the contractor. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.

105.02_nat_us_02_17_2005 105.02(a) Government Provided Sources.

(a) Government-provided sources. Add the following:

Government-provided sources for this project are identified as follows:

(1) Government-provided mandatory sources.

Obtain material for use as N/A and in the production of aggregates under Sections (301/401/411/etc.) from N/A.

(2) Government-provided optional sources.

Material for use as crushed aggregate and in the production of aggregates under Sections 941(01) may be obtained from Walton Material Source.

Material for use as base course/pit run and in the production of aggregates under Sections 941(06) may be obtained from Winter Material Source.

Material for use as rip rap and in the production of aggregates under Sections 25104, 933(03) and 935(01) may be obtained from Jungle Material Source.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_07_31_2007

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

153 - Contractor Quality Control 153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

Delete Section 155 in its entirety.

171 - Weed and Disease Prevention 171.00_nat_us_03_30_2005 Description

171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.

Material

171.02 Conform to the following Subsection:

Water 725.01

Construction Requirements

171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.

Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.

171.04 Equipment. Use a high pressure washing system.

For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.

For work at a commercial washing facility, use an approved facility.

171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.

171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.

171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.

Measurement

171.08 Do not measure weed prevention for payment.

Payment

171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.

203 - Removal of Structures and Obstructions 203.01_nat_us_02_25_2005

203.01 Description.

Delete and replace with the following:

This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.

209 - Structure Excavation and Backfill 209.10_nat_us_10_23_2007

209.10 Backfill.

(a) General.

Add the following:

Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.

Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:

· Embankment height greater than 6 feet at subgrade centerline.

· Installation in a protected streamcourse.

· Round pipe with a diameter of 48 inches or greater.

· Pipe arches with a span of 50 inches or greater.

· Any box culvert of structure other than pipe culverts.

(b) Pipe culverts.

(1) Pipe culverts with compacted backfill.

Add the following:

Excavate an area on each side of the pipe as needed to effectively achieve compaction requirements. Backfill without damaging or displacing the pipe. Complete backfilling of the trench with suitable material.

209.11_nat_us_02_24_2005

209.11 Compacting.

Delete the subsection and add the following:

Compact backfill using designated compaction method A, B, or C:

Method A. Ensure that backfill density exceeds the density of the surrounding embankment.

Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer using appropriate compaction equipment until visual displacement ceases. For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.

Method C. Determine optimum moisture content and maximum density according to AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

Table 209-1 Sampling and Testing Requirements Add the following:

(2) Compaction methods (A) and (B) do not require AASHTO T-99 or T-310 test methods for foundation fill.

601 - Minor Concrete 601.00_nat_us_02_27_2007 Delete the entire specification and replace it with the following:

Description

601.01 This work consists of constructing minor concrete structures.

Material

601.02 Conform to the following Subsections:

Air-entraining admixtures
711.02
Chemical admixtures
711.03
Coarse aggregate
703.02
Concrete coloring agents
711.05
Curing material
711.01
Fine aggregate
703.01
Fly ash
725.04
Hydraulic Cement
701.01
Joint fillers
702.01
Precast concrete curbing
725.06
Precast concrete units
725.11
Reinforcing steel
709.01
Structural steel
717.01
Water
725.01

601.03 Concrete Composition. Use the designated concrete composition:

(a) Method A. Submit a mix design showing the proposed masses of aggregate, water, and cement per cubic yard of concrete a minimum of 7 days prior to beginning placement. Proportion the cement, aggregate, and water to obtain concrete with good workability.

Composition of Minor Structure Concrete

Property
Specification
Test Method
Slump
4 in maximum
AASHTO T 119
Air content
5 to 7 percent
AASHTO T 152 or T 196
28-day compressive strength
3000 psi
AASHTO T 23 and T 22

(b) Method B. Submit the following information a minimum of 7 days prior to beginning placement:

(1) Type, grading, and sources of aggregate.

(2) Type and source of cement, blended cement, or fly ash.

(3) Saturated surface dry weights of the fine and coarse aggregate in pounds per cubic yard of concrete.

(4) Weight of mixing water in pounds per cubic yard of concrete.

(5) Weight of cement in pounds per cubic yard of concrete.

(6) Admixture type, quantity, and certification by manufacturer.

(7) Air content.

(8) Slump.

(9) 28-day compressive strength.

Furnish concrete containing not less than 680 pound of cement per cubic yard. Ensure that slump is 4 inches or less, as determined by AASHTO T 119.

(c) Method C. Make the concrete using a dry, preproportioned, blended, and bagged mix meeting the requirements of ASTM C 387 and mixed at the jobsite according to the manufacturer’s recommendations.

(d) Fly Ash- or Pozzolan-Modified Concrete. Fly ash may be substituted for cement at the rate of 20 ounces of fly ash per 16 ounces of Portland cement. After substitution, reduce the design aggregate volumes by an amount equal to the net increase in volume of the combined cement and fly ash. Replace no less than 10 percent and no more than 20 percent of the weight of Portland cement required with fly ash at the above rate. For purposes of controlling the maximum water/cement ratio of 0.49, make the water/cement ratio for fly-ash-modified concrete the ratio of the weight of water to the combined weights of Portland cement and 60 percent of the weight of the fly ash.

Extend the standard 28-day curing period for compressive-strength tests for fly-ash modified concrete by 1 day (rounded to the nearest whole day) for each 1.5 percent of Portland cement replaced with fly ash at the selected rate. (Example: If the maximum of 20 percent cement is replaced, the curing period for cylinders is 41 days.)

Construction Requirements

601.04 General. Perform excavation and backfill work according to Section 209. When concrete is cracked, spalling, or scaling, remove concrete to the nearest joint.

Design and construct forms that are free of bulge and warp and allow for removal without injuring the concrete. When concrete contains a retarding admixture, fly ash, or other pozzolan replacement for cement, design the forms for a lateral pressure equal to that exerted by a fluid with a mass of 2.5 ton per cubic yard.

Use wood, metal, or other suitable material for forms. Keep forms clean and coat with a form release agent or form oil before placing concrete.

Place and fasten reinforcing steel according to Subsection 554.08.

601.05 Placing Concrete. Place all reinforcing steel in position and ensure that it is securely held in place by approved supports during placing of concrete. Do not place concrete until the grading, forms, and steel reinforcements have been inspected and approved by the CO. Provide 24 hours written notice prior to placement of any concrete.

Place reinforcing steel according to Section 554.

Discharge all concrete prepared using methods A and B into the forms within the time limits shown in table 601-1. These time limits are based on jobsite ambient air temperature, cement type, and admixture used. Begin counting time from when the cement is introduced into the aggregate. Discharge concrete prepared using method C into the forms within 1-1/2 hours after introducing water to the mixture. Do not retemper concrete. When required cement must be added to the mixer at the jobsite. Do not mix or place concrete when the temperature is, or is expected to be, less than 40 °F unless adequate provisions are made to protect the concrete.

Place concrete to avoid segregation. Use high-frequency internal vibrators for consolidating concrete in the forms. Operate vibrators to produce concrete free of voids, but do not hold them in one place long enough to result in segregation or formation of laitance on the surface.

Method C concrete may be rodded instead of internally vibrated as necessary to remove voids.

Do not use aluminum pipe, conduit, or troughs for transporting concrete. When concrete is pumped, take samples from the discharge stream at the point of placement. Do not apply water to plastic concrete surfaces during finishing operations.

Table 601-1 Concrete discharge time limits.

Cement Type With and Without Admixtures
Time limit (hour)
< 85 oF1
>85 oF1
Type I, IA, II, or IIA
2.0
1.5
Type I, IA, II, or IIA with water reducing or retarding admixture
3.0
2.0
Type III
1.5
1.0
Type III with water reducing or retarding admixture
2.0
1.5

1 Ambient air temperature.

601.06 Curing Concrete. Cure concrete a minimum of 7 days. If high early strength cement is used, cure concrete a minimum of 3 days. Cure according to Subsection 552.15. Finish according to Subsection 552.16 class 2 rubbed finish.

601.07 Acceptance. See Table 601-2 for sampling and testing requirements. Material for minor concrete structures including reinforcing steel, and structural steel for minor structures will be evaluated under Subsections 106.03. The concrete mixture's slump, air content, unit mass, and temperature will be evaluated under Subsections 106.02 and 106.04. See Tables 552-1 and 552-2 for specification limits.

Excavation and backfill will be evaluated under Section 209.

Construction of minor concrete structures will be evaluated under Subsections 106.02 and 106.04.

Measurement

601.08 Measure the Section 601 items listed in the bid schedule according to Subsection 109.02.

Payment

601.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 601 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

The concrete lump sum item will be prorated based on the progress of the work under this Section.

601.02_nat_us_03_02_2005 Table 601-2. Sampling and Testing Requirements.

Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Concrete
Measured and tested for conformance (106.04)
Unit Weight
-
AASHTO T 121
One set per 32 cubic yards but not less than one per day
Point of discharge
-
Upon completion of project
Air content
-
AASHTO T 152 or AASHTO T 196
“
“
-
“
Slump
-
AASHTO T 119
“
“
-
“
Temperature
-
Field Measured
“
“
-
“
Compressive strength
-
AASHTO T 22 & AASHTO T 23
“
Discharge stream at point of placement
-
“

602 - Culverts and Drains 602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

602.06_nat_us_08_05_2009

602.06 Laying Plastic Pipe.

Delete the second paragraph and substitute the following:

Provide soil-tight bell and spigot joints for plastic pipe culverts.

709.01_nat_us_07_03_2007

709.01 Reinforcing Steel.

(b) Reinforcing bars.

Delete paragraph one and replace with the following:

Furnish deformed, grade 60 bars conforming to AASHTO M 31.

(d) Tie bars.

Delete paragraph one and replace with the following:

Furnish deformed, grade 60 bars conforming to AASHTO M 31.

(e) Hook bolts.

Delete paragraph one and replace with the following:

Furnish plain, grade 60 bars conforming to AASHTO M 31 with M14 rolled threads or M16 cut threads. Furnish a threaded sleeve nut capable of sustaining a minimum axial load of 15,000 pounds.

Part 4 - MEASUREMENT AND PAYMENT Method of Measurement Measurement will be the number of linear feet of fence completed, including gates, measured on slope length.

Basis of Payment Payment will be made at the Contract unit price for each linear foot of vinyl fence accepted to the nearest foot.

Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

02827-1 Vinyl Ranch Fence Linear Foot

SECTION 02877

RECYCLED PLASTIC BENCHES

Part 1 - GENERAL

1.01 SUMMARY

A. This section specifies furnishing and installing a commercially available park bench constructed of recycled plastic lumber.

1.02 RELATED SECTIONS

A. Section 05000
B. FP-03 Section 601 Minor Concrete Structures.
C. Contract Plans.

Part 2 - PRODUCTS

2.01 Materials

A. Contractor shall submit, for approval by the Engineer all items to be used inthe construction of this project.
B. Lumber
1. Constructed of 100% recycled HDPE plastic resin lumber withultraviolet stabilizers.
2" x 4” nominal size, 1.5” x 3.5” actual dimension.
2. Cedar tone color that is uniform and consistent throughoutproduct.

C. Hardware As per Section 05000.

2. Bench base and supports will be powder coated structural steel.

3. Fasteners will be galvanized steel.

Part 3 - EXECUTION

3.01 Construction

A. Benches
1. Radius edges on recycled plastic lumber.
2. 2 1/2” square tubing for bench vertical bench supports.
3 . 2 1/2” wide flat stock for bench supports.
4. One arm rest installed at end of bench opposite of clear groundspace.
5. Back rest shall be the entire length of bench.
6. Length of bench as noted on plans.
7. Install as shown on plans and as per specifications.

Part 4 - MEASUREMENT AND PAYMENT Method of Measurement Measurement will be the number of completed Benches furnished and installed.

Basis of Payment Payment will be made at the Contract unit price for each Bench accepted.

Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

02877-1 Bench Each

END OF SECTION

3.1 General

A. Field Measurements – Contractor shall verify measurements in field, as required, for work fabricated to fit job conditions.

B. Metal fabrications shall conform with the latest edition of AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings.

C. Welding shall be by operators qualified by tests as prescribed by the AWS in Standard Qualification Procedure for performance of the type of work required.

D. Weld all shop connections unless noted otherwise. All welds shall be minimum 3/16 inch fillet and sealed for galvanizing.

E. Cut edges true and smooth, free from burrs. Flame cutting not permitted. Bolt holes shall be drilled or punched.

F. Cap all the open ends of all tubes and grind smooth.

G. Remove all weld spatter from exposed surfaces.

01010 -

DIVISION 5 - FLOATS

STRUCTURAL METAL FRAMING FOR FISHING PLATFORM FLOAT SYSTEM 05007

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. This work consist of:

a. The fabrication and installation of all structural metal and miscellaneous metals

b. Metal hardware items, fasteners and indicated on the drawings and as specified.

1.2 RELATED WORK

A. Metals for General Fabrication, Section 05000.

B. Rough Carpentry for Fishing Platform Float System, Section 05107.

C. Slip resistant finish for Fishing Platform Float System , 05207.

D. Specialties for Fishing Platform Float System, Section 05307.

1.3SUBMITTALS
A.Submit shop drawings, to the Engineer for approval, prior to fabrication.

PART 2 – MATERIALS

2.1GENERAL
A.All metal hardware shall be ASTM A 36 steel.
B.Galvanizing - All bolts, pins, rails, angels, and other miscellaneous metals shall be hot dip galvanized after fabrication in accordance with ASTM A 123. Weight of zinc coating to conform to requirements specified under "Weight of Coating" in ASTM A 123.
C.Bolts, nuts, and washers shall conform to ASTM A 307, Grade A, galvanized.
D.Steel pipe shall be scheduled 40 weight.
2.2PLATFORM FLOAT AND GANGWAY
A.Screws for attaching float deck shall be Fastap Plus Exterior Screws with Duracoat, 10 x 3-1/4 " DOC # 314, as manufactured by Fastep, Inc. 13909 N.W. 3rd. Court, Vancouver, Washington 98685, (206) 373-7565 or 1-800-847-4714, FAX (206) 573-7939.
B.Nails shall be common wire nails, size as shown or specified, and shall be hot-dip galvanized.
C.Lag screws shall be made from ASTM A 36 steel, galvanized lengths as shown on drawings.

PART 3 - EXECUTION

3.1GENERAL
A.Field Measurements - verify measurements in field, as required, for work fabricated to fit job conditions.
B.Installations - Provide inserts, fasteners, and cutouts a required.
C.Metal fabrications shall conform with the latest edition of AISC Specifications for the Design, Fabrication and Erection of Structural Steel for Buildings.
D.Welding shall be by operators qualified by tests as prescribed by the AWS in Standard Qualification Procedure for performance of the type of work required.
E.Weld all shop connections unless noted otherwise. All welds shall be minimum 3/16 inch fillet and sealed for galvanizing.
F.Provide metals connectors at all structural joints as specified.

G. Chase or tap out threads of nuts welded to hinge backing plates after galvanization.

ROUGH CARPENTRY FOR FISHING PLATFORM FLOAT SYSTEM 05107

PART 1 - GENERAL

1.1DESCRIPTION OF WORK
A.This work consist of:

a. The construction and installation of all rough carpentry items as indicated on the drawings and as specified

b. The construction of fishing platform floats, gangway and railings.

c. Recycled Plastic: Cross rails under floats shall be constructed with 100% recycled plastic lumber

d. Recycled Wood-Plastic Composites: Decking shall be constructed of 100% recycled wood-plastic composite lumber

1.2DELIVER, STORAGE AND HANDLING
A.Protection - Lumber and millwork shall be protected from damage during and after delivery to the site.
1.3RELATED WORK

A. Metal for General Fabrication, Section 05000.

B. Structural Metal Framing for Fishing Platform Float System, Section 05007.

C. Slip Resistant Finish for Fishing Platform Float System, Section 05207.

D. Specialties for Fishing Platform Float System, Section 05307.

PART 2 - MATERIALS

2.1 GENERAL

A. WCLIB Requirements - All lumber, unless otherwise noted, shall be Douglas Fir, S4S, and shall meet all requirements as noted in the "Standard Grading and Dressing Rules No. 16" of the WCLIB.

B. APA Standards - Plywood shall bear the D.F.P.A. grade trademark of the APA. Softwood plywood shall be manufactured in accordance with Product Standard PSI - 65; hardwood plywood shall be manufactured in accordance with Product Standard PS51-71.

C. Protection - Lumber and millwork shall be protected from damage and dampness during and after deliver to the site.

2.2 FLOATS

A. Sawn timber components shall be select structural Coastal Douglas Fir for decking, railings, 4" x 6" deck supports and walers, pressure-treated to conform to AWPA C-2 with ACZA to a retention of 0.60 pounds per cubic foot. Coastal Douglas Fir members being manufactured to the requirements of this specification shall be handled and produced in accordance with Industry Best Management Practices (BMP'S) for the protection of ACZA treated material. BMP'S for the production of ACZA material requires:

a. Material to be free of surface residue. Manufacturing good housekeeping practices shall be observed to insure a minimum of sawdust, surface residue, and other foreign material on the wood product to treatment.

b. A final aqua ammonia steaming period to insure uniformity of color. After the pressure period and the treating solution has been removed from the retort, the treated material shall be aqua steamed for a minimum of one hour at 212 degrees F with a 2% aqua ammonia solution. After aqua steaming and the aqua ammonia is removed from the retort a final vacuum for two hours at 180 degrees F shall be applied.

c. Kiln drying of material after treatment to insure fixation of preservative and stability of appearance. Material shall be dried to a final moisture content of 30% in the treated zone by the oven dry method.

B.Remaining sawn timber components shall be No. 2 Hemlock-Fir or better (frame, blocking) as graded by WCLIB, pressure-treated to conform to AWPA C-18 with ACZA or CCA to a retention of 0.60 pound per cubic foot.
C.Plywood shall be Grade CDX Exterior, Pressure-treated to conform to AWPA C-9 with ACZA or CCA to a retention of 0.60 pounds per cubic foot.
D.Incise wood members prior to treatment, all four sides, including decking.
E.Recycled plastic lumber used for cross rails under floats shall be manufactured from 100% plastic blended mix of high density polyethylene (HDPE) and other plastics, color brown, as manufactured by RESCO Plastics, Inc., Coos Bay, Oregon (541)269-2572, BTW industries, Inc., Hollywood, Florida (888) 685-7570, or Marine Plastic Lumber, Olympia, Wa (360) 956 - 3422.
F.Recycled wood-plastic composite lumber used for all decking shall be manufactured from a 100% recycled-content, wood-plastic composite. Composite shall be 48% recycled plastic and 52% waste wood fiber. Plastic content shall be a mixture of high-density and low-density polyethylene. Wood fiber shall be red cedar chips. Composite lumber shall be “ChoiceDek” 2" x 6" grooved decking board as manufactured by Advanced Environmental Recycling Technologies, FM 2169HC, Box 10, Junction, TX (915) 446-3430.
G.Fasten plywood to float frame with 8d galvanized box nails, with 6" spacing at all supports.

PART 3 - EXECUTION

3.1 FLOAT

A. Handle lumber and treat penetration damage in accordance with AWPA M4. Field cuts and holes shall be treated in accordance with AWPA Standard M4.

B. Provide flat washers under all heads and nuts bearing on wood.

C. Install all decking with 1/8” spacing between deck boards.

D. Deck screws to be driven to 1/8” below the deck surface. Use two screws per 2" x 6" deck at each framing member. See Section 05000 for deck screw requirements.

E. Frame, decking and 4" x 6" deck supports shall be continuous length. No splices shall be permitted.

PART 4 - MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. Measurement will be made of wood platform float completed in accordance with these specifications and drawings.

4.2 PAYMENT

A. Payment will be at the contract unit price for each pay unit accepted.

Payment will be under:

Pay Item DESCRIPTION PAY UNIT

05107(01)A Fishing Platform Float System , furnish and install Ea.

05107(01)B Install platform Float Ea.

(Government Furnished)

SLIP RESISTANT FINISH FOR FISHING PLATFORM FLOAT SYSTEM 05207

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. This work consist of the application of a slip resistant deck coating for platform float and gangway.

1.2RELATED WORK
A.Rough Carpentry for Fishing Platform Float System, Section 05107

PART 2 – MATERIALS

2.1FLOATS
A.Deck coating for platform float and gangway shall be Elasto-Seal Primer with finish coats of brown non-skid Kote-A-Deck as manufactured by Oregon Research and Development, 1920 McGilchrist St S.E., Salem, Oregon 97302.

PART 3 - EXECUTION

3.1FLOAT
A.Coat surface of all float and gangway. Prime with Elasto-Seal and paint with two coats brown non-skid Kote-A-Deck. Apply coating system in complete accordance with manufacturer's instructions.

SPECIALTIES FOR FISHING PLATFORM FLOAT SYSTEM 5307

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. This work consists of furnishing, installation, and construction of speciality items as indicated on the drawings and as specified. These speciality items include

a. Reinforced neoprene belting.

b. Expanded polystyrene flotation.

c. Recycled Plastic Lumber, see Section 05107, Rough Carpentry for Fishing Platform Float System.

1.2 SUBMITTALS

A. The contractor shall submit for approval by the Engineer, all items that are intended to be used in the construction of this project.

1.3 RELATED WORK

A. Metal for General Fabrication, Section 05000.

B. Structural Metal Framing for Fishing Platform Float System, Section 05007.

C Rough Carpentry for Fishing Platform Float System , Section 05107.

D Slip resistant finish for Fishing Platform Float System, section 05207.

2.1 PLATFORM FLOATS

A. Belting shall be placed over all joints between boarding floats. Belting shall be #3LC 300 7/32 x BB, available from Capital Industrial Supply Co., P.O. Box 511, Wilsonville, Oregon 97707. Telephone (503) 682-3555.

B. Flotation units for wood floats shall be molded expanded polystyrene, size as shown on the drawings. Water absorption of flotation units shall be less than two percent (2%) by volume in accordance with ASTM C-272.

PART 3 - EXECUTION

3.1 PLATFORM FLOATS

A. Attach belting with #8 x 1-1/2" flat head galvanized wood screws 6" O.C., fasten to only one float at each joint. Trim and fit the belting so it lays flat on deck and does not ride up on bull rail blocking.

C. Polystyrene flotation units shall be furnished in the sizes shown on the drawings. Use of smaller pieces to provide equivalent amount of flotation shall not be allowed. Position polystyrene flotation units inside float frame as shown on the drawings.

912 F1 2/2010 Section 912- Excavation and Embankment 912.01 Add the following to the second paragraph of this subsection:

This shall also include excavation and embankment for site preparation work for the construction and installation of recreation facilities related to trail construction such as bench pads, picnic and parking areas and fences.

Construction

912.03 Use and Disposal of Excavated Material

Delete the third paragraph and replace with the following:

Remove and dispose of excess and unsuitable excavation at designated sites or as shown in the drawings.

Delete the fourth paragraph and replace with the following:

Rocks over 4” in greatest dimensions shall be conserved and utilized in construction of headwalls, rock curbs and rip rap.

912.04 Trailway Excavation and Embankment

Delete the subsection and replace with the following:

912.04 Excavation and Embankment

Any deviations in vertical and horizontal alignment from those shown on the drawings shall be approved by the Engineer.

Construct embankments with suitable compacted material at an appropriate moisture content or as approved by the Engineer. Compaction of embankments; subgrades for parking and picnic areas, and bench pads shall be by mechanical vibratory roller approved by the Engineer. Operate compaction equipment over the entire area until visual displacement ceases with a minimum of three passes.

Finish excavated areas to be smooth and uniform and shaped to conform to the typical sections.

941 F1 2/2010

Section 941- Aggregate Surfacing and Base Course 941.05 Delete the first sentence and replace with the following:

Prepare and finish trailbed, and areas where site preparation has occurred for other construction items, as per Section 912.

image2.emf oleObject1.bin image3.emf

Microsoft_Office_Word_97_-_2003_Document1.doc

SEQ CHAPTER \h \r 1SECTION 05000 - METALS FOR GENERAL FABRICATION

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK

A. This work consists of:

1. The fabrication and installation of all structural metal and miscellaneous metals.

2. Metal hardware items, fasteners, and connectors as indicated on the drawings and as specified.

1.2 RELATED WORK

A. General Concrete, FP-03 Section 601

B. Rough Carpentry For Boarding Floats, Section 05107

C.

Recycled Plastic Benches, Section 02877.

2.1 GENERAL

A. Material Identification - Sheet metal materials shall be plainly marked with weight or thickness of materials and manufacturer's name.

B. All metal hardware shall be ASTM A 36 steel.

C. Galvanizing - Hot dip galvanize items after fabrication in accordance with ASTM A 123. Weight of zinc coating to conform to requirements specified under "Weight of Coating" in ASTM A 123.

D. Bolts, nuts, and washers shall conform to ASTM A 307, Grade A, galvanized.

E. Bolts, nuts, and washers shall be Grade 18-8 stainless steel.

F. Lag bolts shall be made from ASTM A 36 steel, galvanized lengths as shown on drawings.

G. Screws and fasteners that come in contact with pressure treated wood shall be stainless steel.

H. Steel pipe shall be Schedule 40 and/or Schedule 120 double extra strong as indicated on the drawings.

2.2 WOOD FLOATS

A. Screws attaching the composite decking shall be Fastap Poly2 exterior screws with Duracoat XT coating, #9x 3”, as manufactured by Fastap, Inc. 13909 NW 3rd Court, Vancouver, WA 98685. Phone (206) 373-7565 or (800) 847-4714, Fax (206) 573-7939.

PART 3 - EXECUTION

3.1 GENERAL

A. Field Measurements – Contractor shall verify measurements in field, as required, for work fabricated to fit job conditions.

B. Metal fabrications shall conform with the latest edition of AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings.

C. Welding shall be by operators qualified by tests as prescribed by the AWS in Standard Qualification Procedure for performance of the type of work required.

D. Weld all shop connections unless noted otherwise. All welds shall be minimum 3/16 inch fillet and sealed for galvanizing.

E. Cut edges true and smooth, free from burrs. Flame cutting not permitted. Bolt holes shall be drilled or punched.

F. Cap all the open ends of all tubes and grind smooth.

G. Remove all weld spatter from exposed surfaces.

01010 -