RFP_Walton_Lake_Trail.doc

DOC document 601 KB Posted

Attached to
RECOVERY - Walton Lake Trail Reconstruction - Ochoco National Forest, Oregon
Solicitation number
AG-0489-S-10-0409
Issued by

About this file

Request For Proposals - SF1442 Schedule of Pay Items terms conditions solicitation provisions

View the file

Other files

File Type Posted
Pre-Proposal Summary.doc DOC document
Amendment_2.pdf PDF
Amendment 2 Continuation.docx DOCX document
Amendment_1.pdf PDF
Specification List.xls XLS spreadsheet
Specifications.docx DOCX document
Offer Submittal Packet.doc DOC document
Drawings 1-42.pdf PDF
R-6_Trail_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-0489-S-10-0409

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

X NEGOTIATED (RFP)

3. DATE ISSUED

04/13/10

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

378791

6. PROJECT NO.

7. ISSUED BY

CODE

0489
8. ADDRESS OFFER TO

EROC Northwest Contracting Office @ Umpqua National Forest

2900 NW Stewart Parkway – Room 220

Roseburg, OR 97470

EROC Northwest Contracting Office @ Umpqua National Forest

2900 NW Stewart Parkway – Room 220

Roseburg, OR 97470

9. FOR INFORMATION

CALL:

A. NAME

See block 10 B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) See block 10

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

RECOVERY – WALTON LAKE TRAIL RECONSTRUCTION

OCHOCO NATIONAL FOREST

LOOKOUT MT. RANGER DISTRICT

Price Range: The Government’s estimate is between $100,000 and $250,000.

This solicitation is issued under the provisions of the American Recovery and Reinvestment Act of 2009.

TAS::12 1102::TAS RECOVERY

NOTE: Address/Mail/Deliver proposals to BLOCK 8 address. Bid guarantees must be received no later than the specified closing date. Bid Bonds must be originals.

Technical Contacts: Steve Pickert 511-416-6513 Contract Specialist: Dennis Danz 541-957-3230

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving

FORMCHECKBOX

award, X notice to proceed. This performance period is FORMCHECKBOX mandatory, X negotiable. (*See Part I Section F.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

X YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

TEN (10)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 9;00 A.M. (hour) local time 05/13/10 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee X is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS: PLACE AMOUNTS IN SECTION B

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

1. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

TABLE OF CONTENTS

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

Schedule of Pay Items

Notes

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1
Scope Of Contract/Description of Work
C-2
Project Location
C-3
Price Range
C-4
Pre-Proposal Meeting
C-5
AGAR 452.211-73 Attachments To Statement Of Work/Specifications
C-6
Standard Specifications
C-7
FAR 52.211-3Availability of Specifications or Product Descriptions Not Listed in the GSA Index of Federal Specifications and Standards
C-8
Product Substitutions
C-9
Bonding

SECTION D – PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E – INSPECTION AND ACCEPTANCE

E-1
FAR 52.252-2 Clauses Incorporated by Reference
E-2
AGAR 452.246-70 Inspection and Acceptance
E-3
Conformity With Plans and Specifications

SECTION F – DELIVERIES OR PERFORMANCE

F-1
FAR 52. 252-2 Clauses Incorporated by Reference
F-2
FAR 52. 211-10 Commencement, Prosecution, And Completion Of Work
F-3
Suspension of Work For Other Than Government’s Convenience

SECTION G - CONTRACT ADMINISTRATION DATA

G-1
Government Furnished Property
G-2
AGAR 452.215-73 Post-Award Conference
G-3
Designation of Contracting Officer’s Representative
G-4
Designation of Inspector
G-5
Notification of Subcontracting

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1
FAR 52.236-4 Physical Data
H-2
Specific Work Requirements
H-3
Submittals, Shop Drawings, Material Certifications and Testing Reports
H-4
Landscape Preservation
H-5
Industrial Fire Precaution Levels
H-6
Use of Premises
H-7
Permits and Responsibilities
H-8
Salvage Rights
H-9
Value Engineering
H-10
Final Cleanup
H-11
Costing of Claims or Modifications
H-12
Payment for Materials Delivered Off The Site
H-13
Payment For Incidental Items
H-14
Payment for Performance and Payment Security Expenses
H-15
Release of Performance and Payment Bonds
H-16
Order of Precedence – Construction

SECTION I - CONTRACT CLAUSES

I-1
FAR 52.252-2 Clauses Incorporated By Reference
I-2
FAR 52.503-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
I-3
FAR 52.204-7 Central Contractor Registration
I-4
FAR 52.204-11 American Recovery and Reinvestment Act – Reporting Requirements
I-5
FAR 52.222-39 Notification of Employee Rights Concerning Payment of Union Dues or Fees
I-6
FAR 52.222-54 Employment Eligibility Verification
I-7
FAR 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods - Buy American Act - Construction Materials
I-8
FAR 52.228-1 Bid Guarantee
I-9
AGAR 452.228-70 Alternative Forms of Security

SECTION J - LIST OF ATTACHMENTS

· List Of Attachments

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

Note regarding VETS-100

K-1
AGAR 452.219-70 Size Standard and NAICS Code Information
K-2
FAR 52.204-8 Annual Representations And Certifications
K-3
FAR 52.209-5 Certification Regarding Responsibility Matters
K-4
FAR 52.219-28 Post-Award Small Business Program Representation
K-5
FAR 52.223-13 Certification of Toxic Chemical Release Reporting
K-6
Government Employees, Former USDA Employees And USDA Retirees

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L-1
FAR 52.252-1 Solicitation Provisions Incorporated By Reference
L-2
FAR 52.216-1 Type Of Contract
L-3
FAR 52.222-5 Davis Bacon Act – Secondary Site of the Work
L-4
FAR 52.222-23 Notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity for Construction
L-5
FAR 52.225-22 Notice Of Required Use of American iron, Steel, and Other Manufactured Goods - Buy American Act - Construction Materials
L-6
FAR 52.233-2 Service Of Protest
L-7
FAR 52.236-27 Site Visit (Construction)
L-8
Technical and Business Proposal
L-9
AGAR 452.215-72 Amendments to Proposals
L-10
Notice of Required Bid Guarantee
L-11
Facsimile Bid Bonds Not Acceptable
L-12
Proposal Submission Documents

SECTION M – EVALUATION FACTORS FOR AWARD

M-1
Evaluation of Offers
M-2
Award Determination

PART I—THE SCHEDULE

SCHEDULE OF ITEMS

WALTON LAKE TRAIL RECONSTRUCTION

ITEMNO.
DESCRIPTION
PAY UNIT
EST. QTY.
UNIT PRICE
TOTAL PRICE
15101
Mobilization
Lump Sum
All
XXXXX
$__________
20301A
Removal of Bridges
Each
4
$________
20301B
Removal of Fishing Platform
Each
1
$_________
$__________
20301C
Removal of Benches
Each
3
$_________
$__________
20301D
Removal of Culvert
Each
1
$_________
$__________
20304
Removal Curb Logs
Lump Sum
All
XXXXX
$__________
20701
Earthwork geotextile

type separation

Square Yard
356
$_________
$__________
25104A
Keyed riprap, class 2
Cubic Yard
390
$_________
$__________
25104B
Keyed riprap, class 4
Cubic Yard
30
$________
$__________
25303
Gabions,

galvanized or aluminized coated

Lump Sum
All
XXXXX
$__________
55706A
Treated structural timber,

glued laminated

Lump Sum
All
XXXXX
$__________
55706B
Treated structural timber, g

lue laminated

Lump Sum
All
XXXXX
$__________
60101
Concrete, method B
Cubic Yard
5
$________
$__________
60103
Concrete, method A
Lump Sum
All
XXXXX
$__________
60201A
15 inch pipe culvert
Foot
32
$________
$__________
60201B
12 inch pipe culvert
Foot
10
$________
$__________
60901
Portland cement concrete curb type,

cast in place, 12 inch depth

Foot
150
$________
$__________
ITEMNO.
DESCRIPTION
PAY UNIT
EST. QTY.
UNIT PRICE
TOTAL PRICE
911(03)
Clearing and grubbing
Lump Sum
All
XXXXX
$__________
912(01)
Excavation
Lineal Foot
4436
$________
$__________
912(03)
Excavation
Lump Sum
All
XXXXX
$___________
933(02)
Stairway type, Rock
Each
1
$________
$__________
935(01)
Rock Retaining Wall
Square Yard
47
$________
$__________
941(02)
Aggregate Surfacing , grading B

compaction method b

Cubic Yard
292
$_________
$__________
941(06)
Base Course, grading 6” minus,

compaction method b

Cubic Yard
143
$________
$__________
942(02)
Hot Bituminous Plant Mix Trail Surfacing
Ton
78
$________
$__________
02827-1
Vinyl Ranch Fence
Lineal Feet
140
$________
$__________
02877-1
Recycled Plastic Bench
Each
4
$________
$__________
05107(01)A
Fishing Platform Float System
Each
1
$________
$__________
TOTAL
$__________

Offeror Name:

Mailing Address:

City, State, Zip:

Phone

Phone

Fax

E-Mail:

DUNS NUMBER:

TAX IDENTIFICATION NUMBER (TIN):

NOTES

BID Items: Offerors must bid on all payment items. If Offeror does not intend to charge for an Item, a price of 0” or “NO COST” should be shown.

Bond Premiums: Bond premiums shall be included under item 15101 Mobilization. See payment terms covered under specification section 151 Mobilization and the standard contract payment clauses.

Proposal Submission Documents: See Section L for a list of required Proposal Submission Documents and other instructions

Central Contractor Registration: Prior to any contract award Contractors must be currently registered in the Central Contractor Registration (CCR) System, which established Electronic Fund Transfer for payment purposed under federal contracts. See Section I (52.204-7).

Ref: http://www.ccr.gov Representation and Certifications: Contractors shall provide Representations and Certifications electronically via the On line Representations and Certifications Application (ORCA). See Section K (52.204-8) for requirements.

Ref: http//orca.bpn.gov Veteran Information: Contractors must register with VETS-100 for contracts awarded in excess of $100,000. See Section K (52.222-38) for requirements.

Ref: http://www.vets100.cudenver.edu

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1
SCOPE OF CONTRACT / DESCRIPTION OF WORK

This project consists of reconstructing Walton Lake Trail and constructing associated facilities within the Walton Lake Campground. Length of Trail #809 is 4,361 feet. Approximately 1,000 feet of trail will be reconstructed with an asphalt surface to ADA standards and the remaining will be reconstructed to an aggregate surfaced trail. A picnic area, floating fishing platform, benches and an accessible turnout will be constructed to ADA standards. Two bridges will be replaced with glue-laminated slabs.

C-2
PROJECT LOCATION

This project is located approximately 31 Miles East of Prineville, Oregon. To reach the beginning of the project, travel east from Prineville, Oregon on US HWY. 26 appoximately14 miles to Crook County Road 123. Travel northeast on CCR 123 approximately 8.4 miles to Forest Road 22. Travel north and east on Forest Road 22 approximately 8 miles to Walton Lake Campground. The trail is accessed from the north side of the boat ramp.

C-3
PRICE RANGE

The Government’s estimate is in the range between $100,000 and $250,000 for all items, including options.

C-4
PRE-PROPOSAL MEETING

A Pre-Proposal Meeting has been established for this project. See Section L.

C-5
ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(AGAR 452.211-73)(FEB 1988)

The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.

C-6
STANDARD SPECIFICATIONS

The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03 U.S. Customary Units) are applicable to this project. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

R-6 Customary Specifications for Construction and Maintenance of Trails, Pacific Northwest Region, July 2005 are applicable to this project. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. .

These documents are hereby incorporated by reference and are not physically attached to this solicitation/contract. See below for sources to obtain these specifications.

Supplemental Specifications, Special Project Specifications and Construction Standards Institute Specifications are also included herein in full text.

C-7
AVAILABILITY OF SPECIFICATIONS OR PRODUCT DESCRIPTIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS AND STANDARDS (FAR 52.211-3) (JUN 1988)

The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:

Specification
Address

Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects

FP-03

U.S. Customary Units Superintendent of Documents

U.S. Government Printing Office

Washington, D.C. 20402

866-512-1800 http://bookstore.gpo.gov/ http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm

ASTM Standards
American Society for Testing and Materials

P.O. Box C700

100 Bar Harbor Drive

West Conshohocken, PA 19428-2959

(610) 832-9585 http://www.astm.org

AASHTO Standards
American Association of State

Highway and Transportation Officials

444 North Capitol Street, NW

Suite 249

Washington, D.C., 20001

(206) 624- 5800 http://www.aashto.org

Federal Specifications
Federal Specification (GSA)

Specifications & Consumer Information Distribution Section

Washington Navy Yard, Bldg. 197

Washington, DC 20407

Manual on Uniform Traffic Control Devices
http://mutcd.fhwa.dot.gov
OSHA
Occupational Safety and Health Administration

1906 Smith Tower Building

506 Second Avenue

Seattle, WA 98104

OSHA Standards
US Department of Labor

Federal Office Bldg., Rm 6048

909 First Avenue

Seattle, WA 98174

(206) 442-5930

C-8
PRODUCT SUBSTITUTION

Any modification of items, designs, materials, products or equipment (including Government Furnished Property) made necessary because of a substitutions requested by the Contractor will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be granted prior to award.

C-9
BONDING

See Section I clause (incorporated by reference) FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (JUL 2004) for contract bonding requirements

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E-1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

E-2
AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)

(a) The Contracting Officer or the Contracting Officer’s duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed on the project unless otherwise agreed to.

E-3
CONFORMITY WITH PLANS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.

SECTION F--DELIVERIES OR PERFORMANCE

F-1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F-2
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) Alternate I(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 (ten) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than NOVEMBER 1, 2010. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by June 15, 2010. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

F-3
SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.

SECTION G--CONTRACT ADMINISTRATION DATA

G-1
GOVERNMENT FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

Property to be Furnished
Delivery Point
Time of Delivery
Item No.
Location- township and range
Time or day needed
Aggregate surface material for Item 941(02)
Walton Material Source
As needed
Base rock material for Item 941(06)
Winter Material Source
As needed
Riprap material for Item 25104A & 25104B
Jungle Material Source
As needed
G-2
POST AWARD CONFERENCE (AGAR 452.215-73) (Nov 1996)

A post award conference with the successful offeror is required. It will be scheduled and held soon after the date of contract award. The conference will be held at a mutually agreed location.

G-3
DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G-4
DESIGNATION OF INSPECTOR

The Contracting Officer’s Representative may designate project inspectors to secure compliance with the terms and conditions of the contract.

G-5
NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:

a. The name, address and telephone number of the subcontractor.

b. The date upon which the subcontract was entered into and its duration.

c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

d. Documentation of the subcontractor's representative authority. Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H-1
FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual survey. Materials for all excavation work are unclassified.

(b) Weather conditions suitable for ground excavation are normally expected in May through September.

H-2
SPECIFIC WORK REQUIREMENTS

Access points to trail will be located and approved by the Engineer prior to use.

Only hand-used equipment will be allowed to cross walkway at station 32+45 and cross the bridge at station 33+15.

Walton Lake campground is currently under construction. Contractor will need to coordinate activities with campground contractor.

Campground will remain closed to public through 2010 construction season.

Open roads shall be signed as required by MUTCD during hauling of materials.

H-3
SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS AND TESTING REPORTS

Submittals:

The following shall be submitted on this project:

Title
Reference.
Time of Government Approval after Submittal
Health and Safety Plan (Accident Prevention)
107.08 FAR 52.236-13
5 days
Materials for vinyl fence
CSI 02827
5 days
Recycled Plastic Benches
CSI 02877
5 days
Engineered Spill Prevention Plan
Requirements in this section covering Spill hazards for specified volumes
7 days
Fire Plan and Fire Tool Certification
Fire Protection, Precaution, and Prevention requirements in this section or included as an attachment to the contract
N/A
Proposed Progress Schedule
Schedules For Construction Contracts (FAR 52.236-15)
N/A
Designation of Representative
Superintendence By The Contractor (FAR 52.236-6)
N/A
Drug Free Workplace Policy
Drug-Free Workplace (FAR 52.223-6)
N/A
SF1413 Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorships
Subcontracts (Labor Standards) (FAR 52.236-11)
N/A
Payroll Records WH347
Payrolls And Basic Records (FAR 52.222-8)
N/A
ARRA Reports
American Recovery And Reinvestment Act—Reporting Requirements (FAR 52.204-11) – see Section I
N/A

SHOP DRAWINGS

The following shop drawings shall be submitted on this project:

Title
Referenced By Specification No.
Time of Government Approval after Submittal
Fishing Platform Float System
CSI 05007
14 days
Treated Structural Timber, Glued Laminated
557
14 days

MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Title
Referenced By Specification No.
Asphalt
942
Concrete
601
Geotextile
714
HDPE Plastic Culverts
602
H-4
LANDSCAPE PRESERVATION

a. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.

b. Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

c. Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live steams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

d. Prevention of Oil Spills – If the Contractor maintains storage facilities for oil or oil products on project Area, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

e. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

H-5
INDUSTRIAL FIRE PRECAUTION LEVELS

The Contractor shall comply with the Fire Protection and Suppression requirements found elsewhere in the contract.

H-6
USE OF PREMISES

(a) Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes. One camp unit will be allowed at the project site for use by a watchman.

(b) A storage site will be permitted at a designated site within the project area or nearby. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.

(c) Potable water and sanitary facilities are not available for use during construction.

(d) The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads needed as direct access routes from material sources to the project site for performance of work under this contract.

Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over-width permits.

H-7
PERMITS AND RESPONSIBILITIES

All other permits (unless noted elsewhere) are not required to be obtained by the Contractor due to project’s Federal status. The lack of permits will not have negative impacts to the Contractor’s license and ability to work within the city in the future. Contractor is responsible, as noted above, to comply with all codes, laws and regulations applicable to this work.

H-8
SALVAGE RIGHTS

No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

H-9
VALUE ENGINEERING

Value engineering change proposals which change the service or function of a facility or produce irreconcilable conflicts with management objectives will not be considered.

The following work is excluded from consideration under the Value Engineering clause:

NONE

H-10
FINAL CLEANUP

Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to camp refuse such as tin cans, aluminum foil, glass, paper, garbage, used engine oil, oil filters, oil cans, grease cartridges, etc. The Contractor shall also remove and dispose of upon completion of construction, all stakes, old culverts, guardrail, flagging, and similar debris within the project area. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed off National Forest Land and in accordance with State and Local disposal requirements.

H-11
COSTING OF CLAIMS OR MODIFICATIONS

The cost principles and procedures in Subpart 31.2 of the Federal Acquisition Regulations shall be used in the pricing of contract claims and modifications, and for determining costs under terminated contracts, except, where actual costs cannot be determined from the Contractor's accounting records. Allowable ownership and operating costs for owned or rented equipment shall be determined from "The Construction Equipment Ownership and Operating Expense Schedule," U.S. Army Corps of Engineers Publication EP 1110-1-8, published by the U.S. Government Printing Office, to the extent that this publication contains a listing of the equipment being cost, or of similar equipment. Comparable equipment rate publications may be used as mutually agreed. During periods of suspension of work pursuant to a contract clause, the allowance for equipment ownership shall not exceed the amount for standby cost as determined by this schedule.

H-12
PAYMENT FOR MATERIALS DELIVERED OFF THE SITE

As provided in FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, material acquired for incorporation into the project, and stored off site by the Contractor, may, at the option of the Contracting Officer, be included in progress payments. Prior to payment, such material will be subject to Government inspection and must be stored separately from other materials, and be identified as, "PROPERTY OF THE UNITED STATES, Project Name and Contract Number." In addition, the Contractor shall furnish the Government with a right of ingress and egress to the property together with right of removal.

H-13
PAYMENTS FOR INCIDENTAL ITEMS

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with plans, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered indirect to and included in the payment for items shown.

H-14
PAYMENT FOR PERFORMANCE AND PAYMENT SECURITY EXPENSES

It is mutually agreed that the premium costs for performance bonds, payment bonds and alternative payment protections furnished for this contract are included in the total amount bid for other items and that any payment to the Contractor for the cost of bonds made in accordance with FAR 52.232-5 refers only to corporate sureties listed in the current Department of Treasury Circular 570 and no advance payment will be made for bond premiums where other than corporate surety bonds are furnished. Bond premiums as used in this paragraph and FAR 52.232-5 shall include any Small Business Administration fees paid in connection with SBA guaranteed corporate surety bonds.

H-15
RELEASE OF PERFORMANCE AND PAYMENT BONDS

Performance and payment security furnished under this contract must be retained by the Government for a minimum of one year after acceptance of all work under the contract including any applicable warranty period. Performance and payment security other than corporate or individual surety bonds will be returned to the Contractor one year after completion of work if no claims against these bonds have been filed at that time.

H-16
ORDER OF PRECEDENCE--CONSTRUCTION

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions (Sections K, L & M) (3) Special Contract Requirements (Section H) (4) Contract Clauses (excluding the specifications and drawings)(i.e. Section I) (5) Supplemental Specifications (6) Standard Specifications

(7) Drawings, figured dimensions over scaled dimensions

(8) Drawings, large scale over small scale

(9) Drawings – Schedules on drawings over notations on drawings

(10) Shop Drawings

(11) Other Documents, Exhibits, and Attachments

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (JUL 2004)

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)

52.203-7 Anti-Kickback Procedures (JUL 1995)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007)

52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.215-2 Audit and Records -- Negotiation (MAR 2009) Alt I (MAR 2009) 52.219-8 Utilization of Small Business Concerns (MAY 2004) 52.222-3 Convict Labor (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (DEVIATION - JAN 2010)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-21 Prohibition of Segregated Facilities (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998)

52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-50 Combating Trafficking in Persons (SEP 2007)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-14 Toxic Chemical Release Reporting (AUG 2003)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997)

52.228-11 Pledges of Assets (FEB 1992)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.228-15 Performance and Payment Bonds – Construction (NOV 2006)

52.229-3 Federal, State, and Local Taxes (APR 2003)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-17 Interest (OCT 2008)

52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

52.233-1 Disputes (JULY 2002)

52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by The Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984)

52.236-26 Preconstruction Conference (FEB 1995)

52.242-13 Bankruptcy (JUL 1995)

52.243-4 Changes (AUG 1987)

52.244-6 Subcontracts for Commercial Items (MAR 2009)

52.245-1 Property Records (JUN 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.248-3 Value Engineering – Construction (SEP 2006)

52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction) (APR 1984)

52.252-6 Authorized Deviations in Clauses (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

I-2
52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAR 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111–5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

I-3
52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

I-4
52.204-11 – AMERICAN RECOVERY AND REINVESTMENT ACT—REPORTING REQUIREMENTS (MAR 2009)

“Contract,” as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.

“First-tier subcontract” means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.

“Jobs created” means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act).