| File | Type | Posted |
|---|---|---|
| Pre-Proposal Summary.doc | DOC document | |
| Amendment_2.pdf | ||
| Amendment 2 Continuation.docx | DOCX document | |
| Amendment_1.pdf | ||
| RFP_Walton_Lake_Trail.doc | DOC document | |
| Specifications.docx | DOCX document | |
| Offer Submittal Packet.doc | DOC document | |
| Drawings 1-42.pdf | ||
| R-6_Trail_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
spec_2000
| USDA FOREST SERVICE | ||
| FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS & BRIDGES | ||
| ON FEDERAL HIGHWAY PROJECTS 2003 | ||
| R6 Standard Specifications for Construction and Maintenance of Trails 2005 | ||
| CSI SPECIFICATIONS 2010 | ||
| PROJECT NAME: ARRA TRAILS - WALTON LAKE TRAIL RECONSTRUCTION | ||
| SPECIFICATION LIST | ||
| REVISION | ||
| SPEC # | FS SPECIFICATION | DATE |
| Preface | 3/15/04 | |
| 100-109 | General Requirements | 2003 |
| 101.01 | Terms, Format, and Definitions | 1/22/09 |
| 101.03 | Abbreviations | 6/16/06 |
| 101.04 | Definitions | 3/29/07 |
| 102 | Bid Award and Execution of Contract | 2003 |
| 102.00 | Bid Award and Execution of Contract | 2/16/2005 |
| 103 | Scope of Work | 2003 |
| 103.00 | Scope of Work | 2/16/05 |
| 104 | Control of Work | 2003 |
| 104.00 | Deletions | 6/16/2006 |
| 104.06 | Use of Roads by Contractor | 2/17/05 |
| 104.07 | Other Contracts | 2/17/05 |
| 105 | Control of Material | 2003 |
| 105.02(a) | Material Sources | 1/18/07 |
| 105.02(a) | Material Sources | 3/8/07 |
| 105.02(a) | Material Sources | 2/17/05 |
| 105.05 | Use of Material Found in the Work | 5/12/04 |
| 106 | Acceptance of Work | 2003 |
| 106.01 | Conformity with Contract Requirements | 7/31/07 |
| 106.07 | Deletion | 5/11/04 |
| 107 | Legal Relations and Responsibility to the Public | 2003 |
| 107.05 | Responsibility for Damage Claims | 5/11/2004 |
| 107.06 | Contractor’s Responsibility for Work | 6/16/2006 |
| 107.09 | Legal Relationship of the Parties | 6/16/2006 |
| 107.10 | Environmental Protection | 6/16/2006 |
| 108 | Prosecution and Progress | 2003 |
| 108.00 | Deletion | 2/16/2005 |
| 109 | Measurement and Payment | 2003 |
| 109.00 | Deletions | 2/17/05 |
| 109.02 | Measurement Terms and Definitions | 6/16/06 |
| 151 | Mobilization | 2003 |
| 153 | Contractor Quality Control | 2003 |
| 153.04 | Records | 10/24/07 |
| 155 | Schedules for Construction Contracts | 6/25/05 |
| 155.00 | Delete | 5/11/2004 |
| 171 | Weed and Disease Prevention | 3/30/2005 |
| 203 | Removal of Structures and Obstructions | 2003 |
| 203.01 | Description | 2/25/2005 |
| 207 | Earthwork Geotextiles | 2003 |
| 209 | Structure Excavation and Backfill | 2003 |
| 209.10 | Backfill | 10/23/2007 |
| 209.11 | Compacting | 2/24/2005 |
| 251 | Riprap | 2003 |
| 253 | Gabions and Revet Mattresses | 2003 |
| 557 | Timber Structures | 2003 |
| 601 | Minor Concrete Structures | 2003 |
| 601.00 | Minor Concrete | 2/27/2007 |
| 601.02 | Sampling and Testing Requirements | 3/2/05 |
| 602 | Culverts and Drains | 2003 |
| 602.03 | General | 9/06/2005 |
| 602.06 | Laying Plastic Pipe | 8/5/09 |
| 700 | Materials | 2003 |
| 701 | Cement | 2003 |
| 705 | Rock | 2003 |
| 706 | Concrete and Plastic Pipe | 2003 |
| 709 | Reinforcing Steel and Wire Rope | 2003 |
| 709.01 | Reinforcing Steel | 7/3/07 |
| 711 | Concrete Curing Materials and Admixtures | 2003 |
| 712 | Joint Materials | 2003 |
| 713 | Roadside Improvement Material | 2003 |
| 714 | Geotextile | 2003 |
| 716 | Material for Timber Structures | 2003 |
| 725 | Miscellaneous Material | 2003 |
| CSI Specifications | ||
| Division 2- Site Work | ||
| 02827 | Vinyl Ranch Fence | 2/1/10 |
| 02877 | Recycled Plastic Benches | 2/1/10 |
| Division 5 - Floats | ||
| 05000 | Metals for General Fabrication | 2/1/10 |
| 05007 | Structural Metal Framing for Fishing Platform Float System | 2/1/10 |
| 05107 | Rough Carpentry for Fishing Platform Float System | 2/1/10 |
| 05207 | Slip Resistant Finish for Fishing Platform Float System | 2/1/10 |
| 05307 | Specialties for Fishing Platform Float System | 2/1/10 |
| R6 Specifications for the Construction and Maintenance of Trails | ||
| 900 | General Specifications | |
| 901 | Abbreviations, Acronyms, and Terms | 2005 |
| 902 | Definitions | 2005 |
| 903 | Intent of Contract | 2005 |
| 905 | Control of Materials | 2005 |
| 906 | Measurement and Payment | 2005 |
| 911 | Clearing and Grubbing | 2005 |
| 912 | Excavation and Embankment | 2005 |
| 912 F1 | Excavation and Embankment | 2/2/10 |
| 933 | Trail Stairways | 2005 |
| 935 | Rock Retaining Wall | 2005 |
| 941 | Aggregate Surfacing and Base Course | 2005 |
| 941 F1 | Preparation of Subgrade | 2/2/10 |
| 942 | Hot Bituminous Plant Mix Trail Surfacing | 2005 |
| 961 | Rock, Grid Pavement Units, and Aggregate | 2005 |