Amendment 2 Continuation.docx
DOCX document 13 KB Posted
- Solicitation number
- AG-0489-S-10-0409
About this file
Amendment No. 2 - Continuation drawing and clause changes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Summary.doc | DOC document | |
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| Specification List.xls | XLS spreadsheet | |
| RFP_Walton_Lake_Trail.doc | DOC document | |
| Specifications.docx | DOCX document | |
| Offer Submittal Packet.doc | DOC document | |
| Drawings 1-42.pdf | ||
| R-6_Trail_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 2 of Amendment No. 2 to Solicitation AG-0489-S-10-0409 Walton Lake Trail Reconstruction – Ochoco National Forest
b. On sheet 17 Picnic Area add the following:
The Contractor shall provide a 6” break in the curb at two (2) corners. The 6” shall be measured between the inside corners of the break. The break at each corner shall be configured identically. Finish ends/edges in a workmanlike manner.
c. On sheet 38 under the Anchor Detail make the following correction:
The Anchor shall be positioned vertically below the platform edge at each side. Each of the 3/8” PROOF COIL CHAINS shall be fastened at the opposite side of the platform so the chains crisscross, instead of vertically as shown. Adjust the length of chain appropriately.
d. Under solicitation section I-2 Clauses Incorporated By Reference add the following:
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2005)
File details come from the government source that posted it. Updated .