03 - Revised Appendix A

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bitterroot National Forest Trapper –Bunkhouse Stewardship

Solicitation No. AG-03R6-S-10-0045 Amendment No. 01, dated 6/23/2010 Appendix A, Page 1 of 10

TRAPPER BUNKHOUSE STEWARDSHIP

APPENDIX A

FUELS TREATMENT, SOILS REHABILITATION &

OTHER SERVICES

Amendment No. 01, dated 6/23/2010 Appendix A, Page 2 of 10

STEWARDSHIP CONTRACT

FUELS TREATMENT, SUBSOILING, SLASH PLACEMENT, and OTHER SERVICES

Unless otherwise agreed to in writing by the Contracting Officer, the Contractor shall perform services according to the following requirements:

1. FUELS REDUCTION AND PRODUCT REMOVAL (TRACTOR) (SCHEDULE OF ITEMS B.1.1)

(a) This specification applies to the following Mandatory and Optional Units:

Mandatory Units 22, 24A, 24B, 20 Optional Units 26, 13, 39, 19, 79, 33B, 33C, 10, 80, 81, 9, 72, 3

(b) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, skidding, processing, hauling, erosion control and slash treatment services.

(c) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B.

2. FUELS REDUCTION AND PRODUCT REMOVAL (SKYLINE) (SCHEDULE OF ITEMS B.1.2)

Mandatory Units 22, 32, 78B, 78A, 20, 27 Optional Units 13, 19, 18, 79, 33A, 33C, 17A, 17B, 17C, 28, 74

(b) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, yarding, processing, hauling, erosion control and slash treatment services.

(c) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the

3. FUELS REDUCTION AND PRODUCT REMOVAL (TRACK LINE MACHINE) (SCHEDULE OF

ITEMS B.1.3)

Mandatory Units 30A, 78B, 27 Optional Units 26, 13, 19, 18, 80, 28, 72, 74,

(b) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, skidding, yarding, processing, hauling, erosion control and slash treatment services.

Amendment No. 01, dated 6/23/2010 Appendix A, Page 3 of 10

(c) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the

4. FUELS REDUCTION AND PRODUCT REMOVAL (TRACTOR SKYLINE SWING) (SCHEDULE

OF ITEMS B.1.4)

Mandatory Units Units 32, 27 Optional Units 17C

(b) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, skidding, yarding, processing, hauling, erosion control and slash treatment services.

(c) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the

5. FUELS REDUCTION AND PRODUCT REMOVAL (HELICOPTER) (SCHEDULE OF ITEMS

B.1.5)

Mandatory Units None Optional Units 45, 46, 47, 48, 49, 50, 21, 30B, A and B

(b) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, yarding, processing, hauling, erosion control and slash treatment services.

(c) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the

6. FUELS REDUCTION AND PRODUCT REMOVAL IN SPECIAL UNITS THAT INCLUDE

RESEARCH SUB-UNITS (SCHEDULE OF ITEMS B.1.6-B.1.11)

Special Units, Mandatory Units: 11, 5A, 5B Special Units, Optional Units: None.

(b) Special Units contain individually identified and named Research Sub-Units with the larger Special Unit boundary. In each Special Unit, the services required will differ between the Non-Research Portions of each Special Unit and the Research Portions of each Special Unit. In addition, the services required in each Research Sub-Unit will also vary.

(c) The Contractor shall perform fuels reduction and product removal services including, but not limited to felling, skidding, yarding, processing, hauling, erosion control and slash treatment services as required by this contract.

Amendment No. 01, dated 6/23/2010 Appendix A, Page 4 of 10

(d) The Contractor shall perform fuels reduction and product removal services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B.

(e) A summary of the work required in Special Units and the Research Sub-Units is provided in the following table. Additional unique specifications applicable in the identified Research Sub-Units follows this table:

Item No.

Special Unit Sub Unit Work Activity Unit Estimated Quantity

B.1.9 and

B.1.10 Unit 11

Tractor AC 197

TLM AC 36

Skyline AC 77

R1 Log Forwarding

(CTL) AC 6

R2 Tractor AC 5 R3 Tractor AC 5

R4 Slashing / Buck, Lop, and Scatter AC 5

R5 Tractor AC 4

R6 Slashing / Buck, Lop, and Scatter AC 5

R7 Slashing / Hand Pile AC 6

R8 Log Forwarding AC 6

R9 No Treatment AC 7

R10 Tractor AC 6

R11 No Treatment AC 6

R12 Slashing / Hand Pile AC 6

Temp Rd. Length Mile 1.5

TLM Trail

Length Mile 0.3

Subsoiling Acres AC 26

Erosions Control

Acres AC 30

Closure to Use by

Others Each 2

Landing Pile

Clean Up Each 60

Amendment No. 01, dated 6/23/2010 Appendix A, Page 5 of 10

Item No.

Special Unit Sub Unit Work Activity Unit Estimated Quantity

B.1.5 and

B.1.6 Unit 5A

Tractor AC 11

TLM AC 34

R1 Tractor AC 5

R2 Slashing / Buck, Lop, and Scatter AC 5

R3 Tractor AC 6

R4 No Treatment AC 7

R5 Slashing / Hand Pile AC 7

R6 Slashing / Hand Pile AC 5

R7 Tractor AC 5

R8 Log Forwarding AC 5

R9 No Treatment AC 5

Temp Rd. Length Mile 0.1

TLM Trail

Length Mile 0.8

Subsoiling Acres AC 6

Acres AC 7

Clean Up Each 27

B.1.7 and

B.1.8 Unit 5B

Tractor AC 21 R10 Tractor AC 6

R11 Slashing / Buck, Lop, and Scatter AC 5

R12 Log Forwarding AC 5

Temp Rd. Length Mile 0.1

Subsoiling Acres AC 3

Acres AC 3

Closure to Use by

Others Each 1

Clean Up Each 3

Amendment No. 01, dated 6/23/2010 Appendix A, Page 6 of 10

7. Creating Temporary Roads (Appendix B) (SCHEDULE OF ITEMS B.1.12)

Mandatory Units 22 Optional Units 26, 19, 18, 79

(b) The Contractor shall perform creation of temporary road services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B, G.6.3.

8. Opening Historic Road (Appendix C) (SCHEDULE OF ITEMS B.1.13)

Mandatory Units 22, 27 Optional Units 19, 79, 33A, 28

(b) The Contractor shall perform opening historic road services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix C.

9. Erosion Control Seeding (Appendix B) (SCHEDULE OF ITEMS B.1.14)

Mandatory Units 30A, 22, 32, 78B, 24A, 24B,78A, 20, 27 Optional Units 26, 13, 39, 19, 18, 79, 33A, 33B, 33C, 17A, 17B, 17C, 10, 80, 81, 9, 28, 72, 74, 3, 45, 46, 47, 48, 49, 50, 21, 30B, A, B

(b) The Contractor shall perform erosion control services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B, K-G.6.0.1#.

10. Landing Clean Up (Appendix B) (SCHEDULE OF ITEMS B.1.15)

Mandatory Units 30A, 22, 32, 78B, 24A, 24B,78A, 20, 27 Optional Units 26, 13, 39, 19, 18, 79, 33A, 33B, 33C, 17A, 17B, 17C, 10, 80, 81, 9, 28, 72, 74, 3, 45, 46, 47, 48, 49, 50, 21, 30B, A, B

(b) The Contractor shall perform landing clean up services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B, K-G.7.

Amendment No. 01, dated 6/23/2010 Appendix A, Page 7 of 10

11. FENCE REMOVAL AND DISPOSAL (SCHEDULE OF ITEMS B.1.16)

The Contractor shall remove and dispose of all barbed wire, wood post, and steel post in Units 26 & 81.

The Contractor shall legally and properly transport and dispose of all removed materials off of Forest Service lands.

12. SUBSOILING AND ROAD OBLITERATION (SCHEDULE OF ITEMS B.1.17)

(a) Landings and Skid trails (Subsoiling and Slash Placement)

Work identified here shall be performed by the Contractor with an excavator and attachment meeting the following description, unless, as a part of an alternate offer, a different solution for achieving the requirements stated below was proposed by the Contractor, and the Contracting Officer accepted that alternate offer (See L. 7(a)(2)):

Excavator size shall range from 45,000 to 50,000 lbs and have at least 140 hp. The designed subsoiling implement (See Section J, Attachments) shall be used on the excavator boom. The subsoiling implement shall be designed with a coulter blade, a curvilinear shank approximately 2 feet long, and a winged tooth with a total wingspan of at least 7 inches. The coulter blade shall be designed to slice through the soil in front of the subsoiling shank to minimize surface disturbance of organic horizons and vegetation. The curved shank in combination with the winged tooth is a critical design feature. The curved shank and winged tooth shall be able to achieve proper soil de-compaction to a depth of 2 feet while preventing detrimental soil mixing and disturbance to soil horizons. The design of the shank and wings will be such that the treated, compacted soil is slightly lifted and well-fractured rather than plowed, mixed, or displaced. Subsoiler design should also consider the ability to place slash, since subsoiling and slash placement shall be completed in one pass.

All Cutting Units, landings and skid trails used by the Contractor shall be subsoiled to a minimum depth of 20 inches, except that the Contracting Officer may agree to lesser depths. Subsurface rocks shall not be pulled to the surface and large supportive roots shall also not be severed. Available slash shall be placed on treated areas in conjunction with subsoiling at a rate of 10 to 15 tons per acre where available. Slash shall consist of clearing or logging slash, stumps or other woody debris, and shall be placed and scattered uniformly on the top of the re-contoured corridor. Subsoiling and slashing shall be completed in one pass to prevent compacting or displacing treated area. The distance between subsoiler shank passes shall typically not exceed 24 inches unless otherwise approved by the Contracting Officer. Treated areas shall span the total width of compaction. Subsoiling shall be kept reasonably current and shall be completed by no later than the last day of performance on each subdivision unless otherwise agreed to by the Contracting Officer.

(b) Temporary Road and Track Line Machine Trail Obliteraion

Unless waived in writing by the Contracting Officer on Temporary Roads and Track Line Machine trails constructed or used by Contractor shall be scarified by the Contractor following use.

Amendment No. 01, dated 6/23/2010 Appendix A, Page 8 of 10

Scarification shall span the width of the compacted areas and shall be done to a depth of not less than 20 inches, and must effectively prepare the ground for seeding.

Notwithstanding the provisions of Appendix B, G.6.3 and G.6.5, unless otherwise agreed, temporary roads accessing Cutting Unit(s) 5A, 5B, 11, 18, 19, 26, and 79 and track line machine trails within Cutting Unit(s) 5A, 11, 13, 18, 19, 26, 27, 28, 30A, 72, 74, 78B, 80 constructed for use with this contract shall be obliterated after they have served the Contractor's purpose. Obliteration shall consist of re-contouring road prism including all cut and fill slopes to natural ground contour. Equipment shall not operate outside the clearing limits. In addition, from 10 to 15 tons per acre where available of clearing or logging slash, stumps or other woody debris shall be placed and scattered uniformly on the top of the re-contoured corridor.

13. EARTH BERMS (CLOSURE TO USE BY OTHERS) (SCHEDULE OF ITEMS B.1.18)

Mandatory Units 22, 27 Optional Units 19, 79, 33A, 81, 28

(b) The Contractor shall perform closure to use by others services in accordance with all of the requirements of this contract, including, but not limited to those outlined in this Appendix A, and the requirements identified in Appendix B, K-F.4.1#.

Solicitation No. AG-03R6-S-10-0045 Amendment No. 01, dated 6/23/2010 Appendix A, Page 9 of 10

15. QUALITY ASSURANCE SURVEILLANCE PLAN / PERFORMANCE REQUIREMENTS

SUMMARY

QASP / PERFORMANCE REQUIREMENTS SUMMARY (PRS)

The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements.

Work Statement Performance

Standard Government Method of Assessment

Incentive/ deduction

Fuels Reduction and Product Removal

Meets 100% Fuels Reduction and Product Removal which includes research sub-units

Appendix B Requirements

Final Fuels Condition

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately. Result in adverse performance assessment.

Creating Temporary Roads

Meets 100% Creating Temporary Roads

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective

Opening Historic Road

Meets 100% Opening Historic Road

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective

Solicitation No. AG-03R6-S-10-0045 Amendment No. 01, dated 6/23/2010 Appendix A, Page 10 of 10

Erosion Control Seeding

Meets 100% Erosion Control

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective

Landing Clean Up

Meets 100% Landing Clean Up

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective

Subsoiling and Slash Placement

Meets 100% subsoiling requirements

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective

Temporary Road and Track Line Machine Trail Obliteration

Meets 100% subsoiling requirements

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective

Earth Berms (Closure to use by others)

Meets 100% Closure to use by others requirement

COR or inspector conduct periodic monitoring and visual inspection

• Rework is required if Contractor fails to meet standard.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

• If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective