01_amend_01_Section_B.pdf

PDF 205 KB Posted

Attached to
Bitterroot National Forest, Trapper - Bunkhouse Stewardship, IRSC Federal contract opportunity
Solicitation number
AG-03R6-S-10-0045
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

02 - Revised Section B

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-03R6-S-10-0045

Trapper-Bunkhouse IRSC Stewardship/Bitterroot NF Amendment No. 01, dated 6/23/2010 Page 2 of 60

PART I – THE SCHEDULE

SECTION B - SERVICES AND PRICES

Darby Ranger District Bitterroot National Forest Ravalli County, Montana

NOTE

: Price Proposals MUST be provided on ALL Items in Schedules B. 1, Mandatory and Option Work Activities Price Schedule and B. 2, Timber Removal Price Schedule.

B. 1 SCHEDULE OF ITEMS

MANDATORY AND OPTION WORK ACTIVITIES PRICE SCHEDULE

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL

B.1.1

Fuels Reduction (Tractor): This item includes felling, skidding, processing and hauling services in accordance with Appendices A & B.

Fuels Reduction (Tractor) Mandatory Units 22, 24A, 24B, 20

AC

62 $_________ $_________

Fuels Reduction (Tractor) Optional Units

Optional Unit 26 105 $_________ $_________ Optional Unit 13 129 $_________ $_________ Optional Unit 39 28 $_________ $_________ Optional Unit 19 36 $_________ $_________ Optional Unit 79 2 $_________ $_________ Optional Unit 33B 2 $_________ $_________ Optional Unit 33C 3 $_________ $_________ Optional Unit 10 40 $_________ $_________ Optional Unit 80 31 $_________ $_________ Optional Unit 81 138 $_________ $_________ Optional Unit 9 49 $_________ $_________ Optional Unit 72 20 $_________ $_________ Optional Unit 3 24 $_________ $_________

Amendment No. 01, dated 6/23/2010 Page 3 of 60

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

B.1.2

Fuels Reduction (Skyline): This item includes felling, yarding, processing and hauling services in accordance with Appendices A & B.

Fuels Reduction (Skyline) Mandatory Units 22, 32, 78B, 78A, 20, 27

AC

236 $_________ $_________

Fuels Reduction (Skyline)

Optional Unit 13 173 $_________ $_________ Optional Unit 19 86 $_________ $_________ Optional Unit 18 21 $_________ $_________ Optional Unit 79 44 $_________ $_________ Optional Unit 33A 37 $_________ $_________ Optional Unit 33C 19 $_________ $_________ Optional Unit 17A 12 $_________ $_________ Optional Unit 17B 14 $_________ $_________ Optional Unit 17C 23 $_________ $_________ Optional Unit 28 71 $_________ $_________ Optional Unit 74 136 $_________ $_________

B.1.3

Fuels Reduction (Track Line Machine): This item includes creating track line machine trails, felling, skidding, yarding processing, and hauling services in accordance with Appendices A & B.

Fuels Reduction (Track Line Machine) Mandatory Units 30A, 78B, 27 Estimated Trail Length: 0.8 Miles

61 $_________ $_________

Fuels Reduction (Track Line Machine)

Estimated Trail Length: 4.1 miles

Optional Unit 26 83 $_________ $_________ Optional Unit 13 19 $_________ $_________ Optional Unit 19 30 $_________ $_________ Optional Unit 18 16 $_________ $_________ Optional Unit 80 40 $_________ $_________ Optional Unit 28 5 $_________ $_________ Optional Unit 72 35 $_________ $_________ Optional Unit 74 20 $_________ $_________

B.1.4

Fuels Reduction (Tractor Skyline Swing): This item includes felling, skidding, yarding, processing and hauling services in accordance with Appendices A & B.

Fuels Reduction (Tractor Skyline Swing) Mandatory Units 32, 27 AC

60 $_________ $_________

Fuels Reduction (Tractor Skyline Swing) Optional Units 17C

21 $_________ $_________

Amendment No. 01, dated 6/23/2010 Page 4 of 60

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

B.1.5

Fuels Reduction (Helicopter): This item includes felling, skidding, yarding, processing and hauling services in accordance with Appendices A & B.

Fuels Reduction (Helicopter) Mandatory Units: None

0 $_________

$ N/A___

Fuels Reduction (Helicopter)

Optional Unit 45 10 $_________ $_________ Optional Unit 46 3 $_________ $_________ Optional Unit 47 4 $_________ $_________ Optional Unit 48 3 $_________ $_________ Optional Unit 49 10 $_________ $_________ Optional Unit 50 13 $_________ $_________ Optional Unit 21 15 $_________ $_________ Optional Unit 30B 31 $_________ $_________ Optional Unit A 31 $_________ $_________ Optional Unit B 27 $_________ $_________

Special Units: Special Units contain individually identified and named Research Sub-Units within the larger Special Unit boundary. Since Special Units and the Research Sub-Units within them must be treated in different ways, the Contractor shall refer to Appendix A to identify the services being performed in each Special Unit and the embedded Research Sub-Units.

Appendix A identifies the services to be performed in the Special Units and Research Sub-Units, and those services must also be performed while also meeting the requirements outlined in Appendix B.

B.1.6

Special Unit 5A Non-Research Portion of Unit

B.1.7

Special Unit 5A Research Portion of Units (R1-R9)

B.1.8

Special Unit 5B

B.1.9

Special Unit 5B Research Portion of Units (R10-R12)

B.1.10

Special Unit 11

B.1.11

Special Unit 11 Research Portion of Units (R1-R12)

Amendment No. 01, dated 6/23/2010 Page 5 of 60

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

B.1.12

This item includes Creating Temporary Roads services in accordance with Appendices A & B.

Creating Temporary Roads Mandatory Units: 22 MI

.3 $_________ $_________

Creating Temporary Roads Optional Units 26, 19, 18, 79

2.5 $_________ $_________

B.1.13

This item includes Opening Historic Roads services in accordance with Appendices A & C.

Opening Historic Road Mandatory Units: 22, 27 MI

1.9 $_________ $_________

Opening Historic Road Optional Units 19, 79, 33A, 28

2.7 $_________ $_________

B.1.14

This item includes Erosion Control Seeding services in accordance with Appendices A & B.

Erosion Control Seeding Mandatory Units: 30A, 22, 32, 78B, 24A, 24B,78A, 20, 27

AC

Erosion Control Seeding Optional Units: 26, 13, 39, 19, 18, 79, 33A, 33B, 33C, 17A, 17B, 17C, 10, 80, 81, 9, 28, 72, 74, 3, 45, 46, 47, 48, 49, 50, 21, 30B, A, B

123 $_________

B.1.15

This item includes Landing Clean Up services in accordance with Appendices A & B.

Landing Clean Up Mandatory Units: 30A, 22, 32, 78B, 24A, 24B, 78A, 20, 27

Each

Landing Clean Up Optional Units: 26, 13, 39, 19, 18, 79, 33A, 33B, 33C, 17A, 17B, 17C, 10, 80, 81, 9, 28, 72, 74, 3, 45, 46, 47, 48, 49, 50, 21, 448 $_________

B.1.16

This item includes Fence Removal and Disposal services in accordance with Appendix A.

Fence Removal and Disposal Mandatory Units: None FT

$____N/A

Fence Removal and Disposal Optional Units: 26, 81

10,600 $_________

Amendment No. 01, dated 6/23/2010 Page 6 of 60

DESCRIPTION UNIT ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

B.1.17a

This item includes Subsoiling and Slash Placement services in accordance with Appendix A.

Subsoiling and Slash Placement:

Landings and Skid Trails Mandatory Units: 30A, 22, 32, 78B, 24A, 24B,78A, 20, 27

26 $_________ $_________

Subsoiling and Slash Placement:

Landings and Skid Trails Optional Units: 26, 13, 39, 19, 18, 79, 33A, 33B, 33C, 17A, 17B, 17C, 10, 80, 81, 9, 28, 72, 74, 3, 45, 46, 47, 48, 49, 50, 21, 116 $_________ $_________

B.1.17b

This item includes Temporary Road and Track Line Machine Trail Obliteration services in accordance with Appendix A.

Temporary Road and Track Line Machine Trail Obliteration Mandatory Units: 30A, 22, 78B, 27

MI

1.1

Temporary Road and Track Line Machine Trail Obliteration Optional Units: 26, 13, 19, 18, 79, 80, 28, 72, 74

6.6 $_________

B.1.18

This item includes Earth Berm services in accordance with Appendices A & B.

Earth Berms (Closure to Use By Others Mandatory Units: 22, 27 EA

Earth Berms (Closure to Use By Others Optional Units: 19, 79, 33A, 81, 28

6 $_________

B.1.19

This item includes Road Maintenance services in accordance with Appendix C.

Road Maintenance – Entire Contract Area. Insert Total from the Table on Page 8 here.

(See Appendix C for detailed specs)

LS 1 $_________ $_________

Amendment No. 01, dated 6/23/2010 Page 7 of 60

B. 2 TIMBER REMOVAL PRICE SCHEDULES

MANDATORY TIMBER REMOVAL PRICE SCHEDULE (See Appendix B, Timber Removal Specifications):

SPECIES

PRODUCT

QUANTITY

UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

ALL

SPECIES Sawtimber

18,464

TON

$1.00

(Top Wood)

ALL

SPECIES

Non sawtimber 3,488 TON $0.33

Fixed $0.33

$1,151.04

OPTIONAL TIMBER REMOVAL PRICE SCHEDULE (See Appendix B, Timber Removal Specifications):

MINIMUM

ACCEPTABLE

(FLAT)

ALL

SPECIES Sawtimber 39,951 TON $1.00

Same rate entered for Mandatory Sawtimber

(Top Wood)

ALL

SPECIES

Non sawtimber 11,545 TON $0.33

Fixed $0.33

$3,809.85

TIMBER SUBJECT TO AGREEMENT

MINIMUM

ACCEPTABLE

(Fixed)

Landing Piles (Biomass) Unestimated TON $0.01

$0.01

NOTE 1: These Schedules are for Pricing/Payment Purposes. See Section L for Business Proposal Requirements.

NOTE 2: Offer for non-saw and biomass are fixed amounts.

NOTE 3: The Optional Items (Optional Fuels Reduction Units) identified under B.1.1 – B.1.18 above are Items that may be exercised at the Government’s option in accordance with Paragraph I. 5 herein.

NOTE 4: The Optional Timber Removal (Timber Removal in Optional Fuels Reduction Units) identified under B. 2 above is to be performed at the Government’s option. Non-sawtimber may be removed at the Contractor’s option in accordance with Appendix B, K-C.2.1.1#, K-E.2.2.5, and will be paid for according to the rates identified in B. 2.

Amendment No. 01, dated 6/23/2010 Page 8 of 60

The following Road Maintenance work item specifications are located in Appendix C. Work items are displayed here separately for Government evaluation purposes. The Contractor will receive 1 Lump Sum payment for all items.

ITEM B.1.19: Road Maintenance - Schedule of Items

Item Number Description

Method of Measurement

Pay Unit

Estimated Quantity

Unit Price Total Price

Mobilization LS 1 $_______ $_________

T-101 Surface Blading LS 1 $_______ $_________

T-103 Dust Abatement LS 1 $_______ $_________

T-108 Slide Removal and Slump Repair LS 1 $_______ $_________

T-301 Ditch Cleaning LS 1 $_______ $_________

T-310 Minor Drainage Structures LS 1 $_______ $_________

T-506 Clearing Roadway Vegetation LS 1 $_______ $_________

T-508 Seeding LS 1 $_______ $_________

Total Lump Sum for Item B.1.19 (Take this total and insert it on the Schedule of Items on Page 5) $_________

B. 3 LAND MANAGEMENT ACTIVITIES

Performance of land management activities shall be in accordance with Section C – Description and Specifications. Payment for Land Management Work Activities in Schedule B. 1, will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Mandatory Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.

B. 4 SUMMARY OF WORK BY UNIT AND OPTIONAL UNIT PRIORITY RANKING

(a) A list of all Mandatory and Optional Units, with the exception of Mandatory Special Units 5A, 5B and 11 is attached in Section J (Attachment 03). The list attached in Section J contains a summary of the work by unit for all Mandatory and Optional Units except for Mandatory Special Units 5A, 5B and 11. Section J, Attachment 03 lists the Optional Units in order of Government priority. The Contracting Officer reserves the right to change the order of Government priority.

(b) See Section J, Appendix A for a summary of work by unit for Mandatory Special Units 5A, 5B, and 11.

(c) The following table contains a basic summary of all of the mandatory and optional units.

Amendment No. 01, dated 6/23/2010 Page 9 of 60

Sale Name: Trapper Bunkhouse Stewardship

Unit Acres System EYD Vol/Ac Volume Landing

Ac.

Burn Piles

Skd Trl Ac.

Subsoil Acres

TLM trail Acres

Temp. Rd.

Acres

Erosion Control Acres

3 24 T 1000 6.85 164.40 0.4 2 1.92 2.32 2.32

5A 27 T 1100 6.59 177.93 0.4 2 2.16 2.76 0.2 2.76

5 CTL 500 6.59 32.95 0.2 1 0.4 0.6 0.6

34 TLM 400 6.59 224.06 1.2 24 1.02 2.4 1.2 3.42

5B 27 T 1100 6.59 177.93 0.4 2 2.16 2.76 0.2 2.76

5 CTL 500 6.59 32.95 0.2 1 0.4 0.6 0.6

9 49 T 830 6.85 335.65 0.6 3 3.92 4.52 4.52 10 40 T 465 7.49 299.60 0.8 4 3.2 4 4

217 T 700 6.59 1430.03 4.2 21 17.36 22.66 1.1 22.66

12 CTL 500 6.59 79.08 0.2 1 0.96 1.16 1.16

77 S 600 6.59 507.43 1.3 26 2.31 1.3 3.61

36 TLM 600 6.59 237.24 0.6 12 1.08 1 0.4 2.08

129 T 990 7.49 966.21 1.6 8 10.32 11.92 11.92 173 S 1320 7.49 1295.77 3.45 69 5.19 3.45 8.64

19 TLM 800 7.49 142.31 0.5 10 0.57 1.6 1.1 2.17

17A 12 S 745 7.49 89.88 0.2 4 0.36 0.2 0.56 17B 14 S 745 7.49 104.86 0.25 5 0.42 0.25 0.67

17C

21 TSS 1188 7.49 157.29 0.4 2 1.68 0.4 2.08

23 S 745 7.49 172.27 0.4 8 0.69 0.4 1.09

21 S 600 6.59 138.39 0.45 9 0.63 0.85 0.4 1.48

16 TLM 600 6.59 105.44 0.35 7 0.48 0.65 0.3 1.13

36 T 660 6.59 237.24 0.6 3 2.88 3.48 3.48

30 TLM 630 6.59 197.70 0.65 13 0.9 1.05 0.4 1.95

86 S 630 6.59 566.74 1.95 39 2.58 2.45 0.5 5.03

12 T 500 6.85 82.20 0.05 1 0.96 1.01 1.01 27 S 825 6.85 184.95 0.35 7 0.81 0.35 1.16

21 15 H 2000 9.10 136.50 1 1 0 1 1

16 T 770 6.85 109.60 0.2 1 1.28 1.48 1.48 42 S 1000 6.85 287.70 0.75 15 1.26 1.25 0.5 2.51

24A 28 T 800 6.85 191.80 0.4 2 2.24 2.64 2.64 24B 6 T 1530 6.85 41.10 0 0 0.48 0.48 0.48

105 T 700 11.24 1180.20 1.2 6 8.4 12.5 2.9 12.5

83 TLM 500 11.24 932.92 3.05 61 2.49 6.74 1.2 6.74

22 TSS 800 6.85 150.70 0.4 2 1.76 0.4 2.16

77 S 900 6.85 527.45 1.55 31 2.31 1.55 3.86

35 TLM 800 6.85 239.75 0.7 14 1.05 1 0.3 2.05

71 S 600 6.85 486.35 1.6 32 2.13 1.6 3.73

5 TLM 600 6.85 34.25 0.1 2 0.15 0.3 0.2 0.45

30A 14 TLM 350 6.85 95.90 0.65 13 0.42 1.35 0.7 1.77

30B 31 H 2000 9.10 282.10 1 1 0 1 1

Amendment No. 01, dated 6/23/2010 Page 10 of 60

38 TSS 875 6.85 260.30 0.6 3 3.04 0.6 3.64

18 S 360 6.85 123.30 0.3 6 0.54 0.3 0.84

33A 37 S 565 7.49 277.13 0.25 5 1.11 0.25 1.36 33B 2 T 360 7.49 14.98 0.2 1 0.16 0.36 0.36

33C 3 T 360 7.49 22.47 0.2 1 0.24 0.44 0.44

19 S 565 7.49 142.31 0.45 9 0.57 0.45 1.02 39 28 T 540 7.49 209.72 0.6 3 2.24 2.84 2.84 45 10 H 1500 9.10 91.00 1 1 0 1 1 46 3 H 1500 9.10 27.30 1 1 0 1 1 47 4 H 1500 9.10 36.40 1 1 0 1 1 48 3 H 1500 9.10 27.30 1 1 0 1 1 49 10 H 1500 9.10 91.00 1 1 0 1 1 50 13 H 1500 9.10 118.30 1 1 0 1 1

20 T 1220 6.85 137.00 0.4 2 1.6 2 2

35 TLM 600 6.85 239.75 0.4 8 1.05 1.1 0.7 2.15

136 S 800 6.85 931.60 2.8 56 4.08 2.8 6.88

20 TLM 800 6.85 137.00 0.4 8 0.6 0.8 0.4 1.4

78A 30 S 1100 6.85 205.50 0.2 4 0.9 0.2 1.1

78B

12 TLM 800 6.85 82.20 0.15 3 0.36 0.25 0.1 0.61

42 S 1100 6.85 287.70 0.5 10 1.26 0.5 1.76

44 S 1060 6.59 289.96 0.5 10 1.32 0.8 0.3 2.12 2 T 260 6.59 13.18 0.2 1 0.16 0.36 0.36

31 T 330 7.49 232.19 0.8 4 2.48 3.28 3.28

40 TLM 330 7.49 299.60 1.65 33 1.2 3.15 1.5 4.35

81 138 T 620 7.49 1033.62 2 10 11.04 13.04 13.04 A 31 H 1500 1.72 53.32 1 1 0 1 1 B 27 H 1500 1.26 34.02 1 1 0 1 1

Total 2518 18254.97 54.9 650.0 123.3 149.0 8.5 6.1

Method Acres Ave. EYD Volume % Vol. Vol/Ac Total Erosion Control Acres 192.8 T 940 742 7057 39% 7.51

S 949 792 6619 36% 6.98

TLM 379 601 2968 16% 7.83

CTL 22 500 145 1% 6.59

TSS 81 954 568 3% 7.02

H 147 1600 897 5% 6.10 Total 2518 5189.075 18254.97

ITEM B.1.19: Road Maintenance - Schedule of Items