ELECTRIC_DRAWINGS.pdf
PDF 10 MB Posted
- Solicitation number
- AG-02RC-S-13-0042
About this file
Attachment J-3 Electrical Drawings 14 pages
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment2Pgs2_3.docx | DOCX document | |
| Amendment2page1.doc | DOC document | |
| QuestionsAnswers2.docx | DOCX document | |
| Amendment1page1.doc | DOC document | |
| Amendment1Pgs2_3.docx | DOCX document | |
| FinalQuestionsAnswers.docx | DOCX document | |
| Amend1Pg4OxidationDitchTypical.pdf | ||
| SiteTourNotes.docx | DOCX document | |
| AttendanceList.docx | DOCX document | |
| Fenn_Civil__Part3.pdf | ||
| Fenn_Civil__Part1.pdf | ||
| Fenn_Civil__Part2.pdf | ||
| FennFinalRFP.doc | DOC document | |
| Fenn_Civil__Part4.pdf | ||
| FENNSpecialProjectSpecifications.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUSSELL ENGINEERING
CONSULTING AND DESIGN
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
ELECTRICAL INDEX SHEET
E0.0 14
INDEX OF ELECTRICAL SHEETS
E0.0 ELECTRICAL INDEX SHEET
E1.0 NORTH HOMES AREA SITE ELECTRICAL
E1.1 NORTH HOMES AREA PHOTOS
E2.0 RANGER STATION AREA SITE ELECTRICAL
E2.1 RANGER STATION AREA PHOTOS
E3.0 MOBILE HOMES AREA SITE ELECTRICAL
E3.1 MOBILE HOMES AREA PHOTOS
E4.0 CEDAR FLATS AREA #1 SITE ELECTRICAL
E4.1 CEDAR FLATS AREA #1 PHOTOS
E5.0 CEDAR FLATS AREA #2 SITE ELECTRICAL
E5.1 CEDAR FLATS AREA #2 PHOTOS
E6.0 LIFT STATION DETAILS
E6.1 LIFT STATION STRUCTURE DETAIL
E6.2 TRENCH DETAILS
PROJECT GENERAL NOTES
1. SPECIFIC ELECTRICALONLY TRENCHING REQUIREMENT: ALL TRENCH BACKFILL COMPACTION SHALL
BE IN ACCORDANCE WITH THE CIVIL ENGINEERING DRAWINGS AND SPECIFICATIONS.
2. CONTRACTOR SHALL PROVIDE ALL TESTING (QUALITY CONTROL) FOR THIS PROJECT.
3. SPECIFIC ELECTRICALONLY TRENCHING REQUIREMENT: SURFACE RESTORATION SHALL BE IN
ACCORDANCEWITH THE CIVIL ENGINEERING DRAWINGS AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL OBTAIN STATE AND LOCAL PERMITS FOR THIS PROJECT.
5. THE CONTRACTOR SHALL FIELD VERIFYALL UNDERGROUND UTILITIES. ALL COSTS ASSOCIATED
WITH UTILITY LOCATING AREAT THE CONTRACTOR’S EXPENSE.
6. ALL DEMOLISHED EQUIPMENT SHALL BE RECYCLED.
7. THE WORD ‘LIFT STATION’ MEANSA LIFT STATION, DOSING STATION, OR OTHER EQUIPMENT CONSIST- ING OF ACONTROL PANEL, AWET WELL WITH DUPLEX PUMPS, ANDA FLOAT SYSTEM FOR CONTROL.
8. THE WORD ‘CONTRACTOR’ MEANS THE GENERAL CONTRACTORANDALL OF THE SUB-CONTRACTORS
ASA TEAM.
9. FOR EACH OF THE CONNECTIONS BETWEEN THE CONTROL PANEL TO THE WET WELLAND SEPTIC TANK, A CONDUIT SEAL OFF IS REQUIRED. SEE SHEET E6.0 FOR DETAILS OF THE INSTALLATION OF THE
CONDUIT SEAL OFF.
10. VERIFYALL DIMENSIONS WITH THE CIVIL ENGINEERING DRAWINGS AS THE CIVIL ENGINEERING
DRAWINGS AREAUTHORITATIVE.
11. TRENCHING IN ACCORDANCE WITH THE TRENCHING DETAILS. JOINT USE WITH SEWERAND/OR WATER LINE INSTALLATION IS REQUIRED WHEN POSSIBLE TO MINIMIZE COSTS AND SITE DISRUPTIONS.
WHERE THE ELECTRICAL DRAWINGS CONFLICT WITH THE CIVIL ENGINEERING DRAWINGS, THE CIVIL
ENGINEERING DRAWINGS GOVERNS.
12. PHOTOS ARE INCLUDED TO HIGHLIGHT SPECIFIC ASPECTS OF THE PROJECT CONDITIONS AND
REQUIREMENTS.
13. CATALOG SHEETS DESCRIBING EQUIPMENTARE INCLUDEDWITH THE SPECIFICATIONS.
14. THE CONTRACTOR SHALL OBTAIN ACOMPLETE SET OF DRAWINGS INCLUDING ELECTRICALAND CIVIL ENGINEERING DRAWINGS. WITHOUTA FULL SET OF DRAWINGS AND SPECIFICATIONS, THE CON- TRACTOR WILL BE MISSING IMPORTANT INFORMATION WHICH WILL BE DETRIMENTAL TO COMPLETING
THE PROJECT.
15. UNLESS OTHERWISE INDICATED, THE WIRING METHOD WILL BE THWN COPPER CONDUCTORS IN
CONDUIT. THE CONDUIT SHALL BE EMTABOVE GRADE, SCHEDULE 80 PVC BELOW GRADE.
16. THE UTILITY IS IDAHO COUNTY LIGHTAND POWER, A COOPERATIVE HEADQUARTERED IN
GRANGEVILLE.
17. THE CO (CONTRACTING OFFICER) HASAS-BUILT DRAWINGS OF THE SITE WITH RESPECT TO VARIOUS PHASES OF THE WORK PREVIOUSLY DONE. THE ENGINEER CANNOT VERIFY THEIR ACCURACY, BUT
THEY MAY HAVE SOME UTILITY FOR THE CONTRACTOR.
18. THE WORDS CO OR C.O. MEAN THE US FOREST SERVICE CONTRACTING OFFICER OR THEIR REPRE-
SENTATIVE.
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E1.0 14
SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE
0 20' 40’ 80’ 120’
NORTH HOMESAREASITE ELECTRICAL
SHEET SPECIFIC NOTES
1. FURNISH AND INSTALL LIFT STATION CONTROL PANELAND SEPTIC TANK ALARM
BOX ON SIDE OF GARAGE AS INDICATED TO REPLACE THE EXISTING CONTROL PAN-
EL. SEE PHOTOS SHEET E1.1.
2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL
PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT
PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS. INSTALL IN CON-
DUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT
REQUIREMENTS LISTED ON SHEET E0.0.
3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH
OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS
(2 HOTS, 1GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND
THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH MOTOR SUP-
PLY BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT.
4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEP-
TIC TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS
A SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CONDUIT IN ACCOR-
DANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT REQUIREMENTS
LISTED ON SHEET E0.0.
5. FURNISH AND INSTALLA NEW 30 AMP CIRCUIT FROM THE EXISTING METER ON THE
SIDE OF THE HOUSE TO THE NEW LIFT STATION CONTROL PANEL. CONNECT THE
ALARM BOX TO THE LIFT STATION PANEL RECEPTACLE CIRCUIT.
6. LOCATION OF EXISTING METER AND FUSIBLE SWITCH.
NOTE 1
NOTE 4
NOTE 5
NOTE 6
NOTES 2,3
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
NORTH HOMES AREA PHOTOS
E1.1 14
PHOTO E1.1-1 EXISTING PANEL SERVICE
THIS EXISTING METER AND FUSIBLE SWITCH SUP-
PLIES THE EXISTING LIFT STATION PANEL.
DEMOLISH THE EXISTING FUSIBLE SWITCH AND
RECEPTACLE.
RETAIN METER.
FURNISH AND INSTALLA NEW FUSIBLE SWITCH
FS-1 IN THE SAME LOCATION AS THE EXISTING
FUSIBLE SWITCH.
BOND THE FUSIBLE SWITCH ENCLOSURE, SUP-
PLY NEUTRAL CONDUCTOR, THE LOAD NEUTRAL
CONDUCTOR, AND THE LOAD GROUND WIRE TO:
A COLD WATER PIPE AND
A NEW 5/8 INCH BY 8 FOOT COPPER CLAD STEEL
GROUND ROD AND TO THE EXISTING SERVICE
GROUND.
THE RECEPTACLE IS NOT REINSTALLED.
FUSE WITH 30 AMP CLASS R FUSES.
PHOTO E1.1-2 EXISTING FUSIBLE SWITCH AND
RECEPTACLE
PHOTO E1.1-3 NEW PANEL FEEDER
FURNISH AND INSTALLA NEW FEEDER FROM THE
NEW FUSIBLE SWITCH TO THE NEW LIFT STATION
PANEL.
THE FEEDER SHALL CONSIST OF 4 — #8 COPPER
TWHN CONDUCTORS (2 HOTS, 1 NEUTRAL, 1
GROUND) IN CONDUIT IN ACCORDANCE WITH THE
GENERAL PROJECT REQUIREMENTS LISTED ON
SHEET E0.0.
ROUTE THE FEEDER FROM THE METER BACK
AROUND THE HOUSE
AROUND THE GARAGE
TO THE NEW LIFT STATION PANEL LOCATION.
OBSERVATION OF CONDUIT GOING INTO THE
GROUND FROM THE EXISTING FUSIBLE SWITCH
AND COMING UP FROM THE GROUND INTO THE
EXISTING LIFT STATION PANEL SUGGESTS THAT
THE EXISTING PANEL SUPPLY COULD BE
INSTALLED IN UNDERGROUND CONDUIT.
THE CONTRACTOR MAY ELECT TO REUSE THE
EXISTING CONDUIT IF IT IS CONTINUOUS, LARGE
ENOUGH, AND A BELOW GRADE EXAMINATION AT
EACH END INDICATES THAT IT IS STILL USABLE
FROM A CORROSION POINT OF VIEW.
PHOTO E1.1-4 NEW PANEL FEEDER
DEMOLISH THE EXISTING PANEL
ON THE SIDE OF THE GARAGE.
REPLACE WITH A NEW LIFT STA-
TION PANEL AND A NEW ALARM
BOX.
PHOTO E1.1-5 AREA NEAR GARAGE
EXISTING LIFT STATION PANEL
EXISTING LIFT STATION WET
WELL
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE
0 20' 40’ 80’ 120’
RANGERSTATIONAREASITE ELECTRICAL
u
SHEET SPECIFIC NOTES
1. FURNISH AND INSTALL LIFT STATION CONTROL PANELAND SEPTIC TANK ALARM
BOX ON THE BACK SIDE OF RANGER STATION AS INDICATED TO REPLACE THE EXIST-
ING CONTROL PANEL. SEE PHOTOS SHEET E2.1.
2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL
PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT
PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS. INSTALL IN CON-
DUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT
REQUIREMENTS LISTED ON SHEET E0.0. (NOTE THAT THE ROUTE SHOWSA POSSIBLE
JOINT USE WITH THE NEW SEWER LINE(S).)
3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH
OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS (2
HOTS, 1 GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE
GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH MOTOR SUPPLY
BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT. (NOTE THAT THE ROUTE SHOWS
A POSSIBLE JOINT USE WITH THE NEW SEWER LINE(S).)
4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEPTIC
TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A
SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CONDUIT IN ACCORDANCE
WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED
ON SHEET E0.0. (NOTE THAT THE ROUTE SHOWS A POSSIBLE JOINT USE WITH THE
NEW SEWER LINE(S).)
5. FURNISH AND INSTALLA NEW 30 AMP CIRCUIT FROM AN EXISTING PANEL INSIDE
THE RANGER STATION. THERE IS A BASEMENT WITHIN THE BUILDING THAT CAN BE
USED TO RUN THE CIRCUIT TO THE NEW LIFT STATION PANEL LOCATION.
NOTE 1
NOTE 5
NOTES 2,3,4
NOTES 2,3, 4
SEPTIC TANK
WET WELL
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
RANGER STATION AREA PHOTOS
E2.1 14
PHOTO E2.1-1 EXISTING LIFT STATION PANEL
THE CONTRACTOR IS TO DEMOLISH THE
EXISTING LIFT STATION PANELAND
REPLACE IT WITH THE NEW LIFT STATION
PANEL AND ALARM BOX.
AS INDICATED ELSEWHERE ON THIS
SHEET, THE EXISTING SUPPLY TO THE
EXISTING PANEL COULD BE REUSED.
PHOTO E2.1-2 EXISTING LIFT STATION PANEL
THESE TWO CONDUITS AS SHOWN IN
PHOTO 3 THIS SHEET CONTAIN:
THE PANEL SUPPLY POWER AND
THE FLOAT CONDUCTORS
TO THE EXISTING WET WELL.
IT IS BELIEVED THAT THE EXISTING PANEL
IS SUPPLIED FROM A TWO POLE BREAKER
IN AN EXISTING PANEL LOCATED INSIDE
THE RANGER STATION BUILDING.
THE BUILDING CONTAINS A BASEMENT
AND THE FACT THAT THE POWER SUPPLY
CONDUIT GOES INTO THE GROUND SUG-
GESTS THAT IT TURNS INTO THE BASE-
MENT.
NEITHER OF THESE COMMENTS HAVE
BEEN FIELD VERIFIED.
PHOTO E2.1-3 EXISTING LIFT STATION PANEL
THE EXISTING POWER SUPPLY APPEARS
TO BE CONDUCTORS LARGER THAN #10
AND THE CONDUCTORS, ALTHOUGH NOT
MARKED, APPEAR TO BE TWO HOT CON-
DUCTORS, A NEUTRAL CONDUCTOR, AND A
GROUND CONDUCTOR.
THE CONTRACTOR SHALL TRACE THESE
CONDUCTORS AND DETERMINE THEIR
SUPPLY. THE NEW LIFT STATION PANEL
REQUIRES 4 — #10 CONDUCTORS (2 HOTS,
A NEUTRAL, AND AGROUND). IF THESE
EXISTING CONDUCTORS SUFFICE, THEY
CAN BE REUSED.
IF NOT, THEN THE CONTRACTOR SHALL
OBTAIN A NEW SOURCE OF POWER TO THE
NEW LIFT STATION WITHIN THE EXISTING
BUILDING.
FOR EXAMPLE THERE IS A PANEL NEAR
THE ENTRANCE TO THE BUILDING WHICH
IS AMODERN LOAD CENTER, THAT COULD
HAVE ROOM AND
HAS ACCESS TO THE BASEMENT VIA THIS
BASEMENT CEILING CAVITY/CRAWLSPACE.
THE NEW LOAD CENTER ACTUALLY
EXTENDS INTO THIS CAVITY.
PHOTO E2.1-4 EXISTING ELECTRICAL PANEL
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E3.0 14
SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE
0 20' 40’ 80’ 120’
MOBILE HOMESAREASITE ELECTRICAL
LIFT STATION STRUCTURE
NOTE 1
NOTE 2,3
NOTE 4
APPROXIMATE LOCA-
TION OF SECONDARY
SERVICE LIFT POLE
NOTE 5
NOTE 5
NOTE 5
120/240 VAC
SINGLE PHASE
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
MOBILE HOMES AREA PHOTOS
E3.1 14
PHOTO E3.1-1 STRUCTURE LOCATION
FURNISH AND INSTALL STRUCTURE
APPROXIMATELY HERE WITH THE FRONT
OF THE EQUIPMENT FACING THE WET
WELL.
PHOTO E3.1-2 STRUCTURE POWER SOURCE
PHOTO E3.1-3 STRUCTURE POWER SOURCE
DEMOLISH EXISTING SECONDARY
SERVICE TO THE MOBILE HOME.
THE EXISTING MOBILE HOME IS TO BE
MOVED FROM THIS SITE AND
REPLACED WITH A DRAIN FIELD.
THEREFORE EXISTING SECONDARY
SERVICE AND RELATED POLES MUST
BE REMOVED.
COORDINATING WITH IDAHO COUNTY
LIGHT AND POWER, REMOVE THE
EXISTING SECONDARY SERVICE AND
FURNISH AND INSTALL A NEW UNDER-
GROUND SERVICE FROM THE EXIST-
ING LIFT POLE IN ACCORDANCE WITH
THE PLANS ON E3.0.
IT IS THE C.O.’S RESPONSIBILITY TO
PAY FOR THE IDAHO COUNTY LIGHT
AND POWER CONTRIBUTION TO CON-
STRUCTION FOR THE SECONDARY
EXTENSION, IF A CONTRIBUTION TO
CONSTRUCTION IS REQUIRED.
THE EXISTING SECONDARY IS SUPPLIED
FROM THE REAR OF THE MOBILE HOME
AND FROM THE RIGHT IN PHOTO #3.
(THE LINE IS ADDED TO PHOTO #3.)
PHOTO E3.1-4 AREA BEHIND MOBILE HOME
EXISTING SECONDARY POLE BEHIND MOBILE HOME SUPPLY-
ING THE METER POLE SHOWN IN PHOTOS #2 AND #3.
THIS POLE LIKELY WILL NEED TO BE GUYED. FURNISH AND
INSTALLAN UNDERGROUND SECONDARY SERVICE FROM
THIS POLE TO THE NEW STRUCTURE METER MAIN AS
DESCRIBED ON E3.0.
SAME POLE
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E4.0 14
SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE
0 20' 40’ 80’ 120’
CEDAR FLATSAREA#1 SITE ELECTRICAL
SHEET SPECIFIC NOTES
1. FURNISH AND INSTALL LIFT STATION CONTROL PANEL AND 2 SEPTIC TANK ALARM BOXES ON THE SIDE OF CARPENTER SHOP AS INDICATED TO REPLACE THE EXISTING CONTROL PANEL. SEE PHOTOS SHEET E4.1.
2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS. INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJ-
ECT REQUIREMENTS LISTED ON SHEET E0.0.
3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS (2 HOTS, 1 GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH
MOTOR SUPPLY BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT.
4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEPTIC TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT REQUIREMENTS LIST-
ED ON SHEET E0.0.
5. FURNISH AND INSTALL A BRANCH CIRCUIT FROM THE EXISTING OR NEW 480 VOLT PANEL, VIAA STEP DOWN TRANSFORMER IN THE CARPENTER SHOP TO THE CEDAR FLATS AREA #1 SEWAGE LIFT STATION. SEE PHOTOS
SHEET E4.1 FOR ADDITIONAL DETAILS.
6. CROSS EXISTING PAVEMENT AT APPROXIMATELY THIS LOCATION DUE TO THE FACT THAT THE EXISTING PAVE-
MENT IS PARTIALLY REMOVED IN THIS AREA FOR SEWER LINE CONSTRUCTION.
7. FURNISH AND INSTALL A 480 VOLT SINGLE PHASE FEEDER FROM THE EXISTING OR NEW 480 VOLT PANEL TO THE SEWAGE LIFT STATION STRUCTURE IN THE CEDAR FLATS AREA #2 SITE (SHEET E5.0). ROUTE THE CONDUC- TORS IN PVC CONDUIT IN THE SAME TRENCH AS THE CEDAR FLATS AREA #1 LIFT STATION FLOATS AND POWER ACROSS THE ROAD AND THENCE IN THE SAME TRENCH AS THE SEWER LINE TO THE LIFT STATION IN CEDAR FLATS AREA #2. SEE SHEET E5.0 FOR THE PATH BEYOND THE AREA COVERED ON THIS SHEET. SEE PHOTOS
SHEET E4.1 FOR ADDITIONAL DETAILS.
8. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE RV DUMP STATION HOLDING TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 4 CON- DUCTORS. INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. INSTALL THIS CONDUIT IN THE SAME TRENCH AS THE SEWER LINE AS DESCRIBED IN NOTE 7. SEE SHEET E5.0 FOR THE PATH BEYOND THE AREA COVERED ON THIS SHEET.
NOTE 1
NOTE 4
NOTE 5
NOTE 6
NOTE 7
NOTE 7
120/240 1Ø
LIFT STATION PANEL
FROM CARP. SHOP 480
VOLT PANEL 2 POLE 30
AMP CIRCUIT BREAKER
#8 CU (2 HOTS, 1 NEUTRAL, 1 GROUND)
10 KVA
#10 CU (2 HOTS, 1 GROUND)
BRANCH CIRCUIT
PARTIAL ONE LINE DIAGRAM
T1
SEPARATELY DERIVED SYSTEM REQUIRES
GROUNDING TO BUILDING STEEL AND A
NEW 5/8 INCH BY 8 FOOT COPPER CLAD
STEEL GROUND ROD
INSIDE CARP. SHOP
OUTSIDE CARP. SHOP
NOTE 7
NOTE 2,3
NOTE 8
NOTE 8
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
CEDAR FLATS AREA #1 PHOTOS
E4.1 14
PHOTO E4.1-1 EXISTING 480 VOLT PANEL
THIS PANEL DOES NOT APPEAR TO HAVE VERY MANY CIRCUITS. THE
CONTRACTOR MAY USE THIS PANEL WITH NEW CIRCUIT BREAKERS
OR REPLACE THIS PANEL WITH AN EQUIVALENT LOAD CENTER, ADD-
ING THE NEW BREAKERS IN ADDITION TO RE-CONNECTING THE
EXISTING CIRCUITS.
CEDAR FLATS AREA #1 LIFT STATION:
THE CONTRACTOR SHALL FURNISH AND INSTALLA WALL MOUNTED
10 KVA 480 VOLT DELTATO 120/240 VOLT SINGLE PHASE TRANS-
FORMER AT THE PANEL LOCATION.
PROTECT THE TRANSFORMER WITH A 30 AMP TWO POLE BREAKER
SUPPLYING #10 COPPER THWN CONDUCTORS (2 HOTS, 1 GROUND)
IN EMT CONDUIT.
FROM THE TRANSFORMER FURNISH AND INSTALL #8 COPPER CON-
DUCTORS (2 HOTS, 1 NEUTRAL, 1 GROUND) IN EMT CONDUIT TO THE
SOURCE LUGS OF THE SEWAGE LIFT STATION PANEL. THE SECOND-
ARY OF THE TRANSFORMER MUST BE BONDED TO THE BUILDING
GROUND SYSTEM AND TO A 5/8 INCH COPPER CLAD STEEL GROUND
ROD AS THIS IS A SEPARATELY DERIVED SYSTEM.
ROUTE THE BRANCH CIRCUIT UP TO THE CARPENTER SHOP CEILING,
OVER AND THROUGH THE PARTY WALLWITH THE PAINT SHOP,
ACROSS THE PAINT SHOP CEILING, DOWN THE INSIDE OF THE OUT-
SIDE WALLAND THENCE TURNING INTO THE BACK OF THE LIFT STA-
TION ENCLOSURE ON THE OUTSIDE OF THE WALL.
POWER BOTH ALARM BOXES FROM THE RECEPTACLE CIRCUIT WITH-
IN THE LIFT STATION PANEL.
CEDAR FLATS AREA #2 LIFT STATION FEEDER:
FURNISH AND INSTALLA 2 POLE 30 AMP BREAKER SUPPLYING A 480
VOLT FEEDER TO CEDAR FLATS AREA #2 LIFT STATION. USE 3 — #10
COPPER CONDUCTORS (2 HOTS, 1 GROUND) IN EMT CONDUIT FROM
THE 480 VOLT PANEL TO OUTSIDE OF THE BUILDING ADJACENT TO
THE BRANCH CIRCUIT INSTALLED ABOVE. TURN THROUGH THE OUT-
SIDE WALL 2 FEET ABOVE GRADE AS INDICATED IN PHOTO 5 THIS
SHEET.
USING A JUNCTION BOX, TRANSITION TO 3 — #2 ALUMINUM THWN
CONDUCTORS (2 HOTS, 1 GROUND) IN SCHEDULE 40 PVC CONDUIT
TO THE CEDAR FLATS AREA #2 LIFT STATION STEP DOWN TRANS-
FORMER.
TYPE BRKR: ITE TYPE ET
CAT #: NHB 12-4L?
3 Ø 4 WIRE
JOB #: Y-SP 387-3
277/480 AC
100 AMP
480 VOLT PANEL
PHOTO E4.1-2 EXISTING 480 VOLT PANEL
PHOTO E4.1-3 EXISTING 480 VOLT PANEL NAMEPLATE
PHOTO E4.1-4 EXISTING 480 VOLT PANEL CARD
PHOTO E4.1-5 LOCATION OF CEDAR FLATS AREA #1 LIFT STATION
FURNISH AND INSTALL THE
CEDAR FLATS AREA #1 LIFT STA-
TION AND BOTH ALARM ENCLO-
SURES ON THE OUTSIDE OF THE
WALLAPPROXIMATELY HERE.
TO CEDAR
FLATSAREA #2
LIFT STATION
FURNISH AND INSTALL THE
CEDAR FLATS AREA #2 LIFT STA-
TION FEEDER THROUGH THE
OUTSIDE WALL, TRANSITION TO
SCHEDULE 40 PVC CONDUIT AND
#2 AL CONDUCTORS (2 HOTS, 1
GROUND), THENCE UNDER-
GROUND USING JOINT USE WITH
THE SEWER LINE TRENCH TO
THE CEDAR FLATS AREA #2 LIFT
STATION MOUNTED ON THE OUT-
SIDE OF CARPORT.
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E5.0 14
SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE
0 20' 40’ 80’ 120’
CEDAR FLATSAREA#2 SITE ELECTRICAL
SHEET SPECIFIC NOTES
1. FURNISH AND INSTALL LIFT STATION EQUIPMENT INCLUDING A 30 AMP, 2 POLE, 480 VOLT FUSIBLE SWITCH, AN OUTDOOR RATED 10 KVA TRANSFORMER, A LIFT STATION PANEL, AND AN ALARM BOX SURFACE MOUNTED ON THE SIDE OF THE EXISTING CARPORT. SOME CAREFUL LOCATION OF THE EQUIPMENT WILL BE REQUIRED IN ORDER TO
FIT ON THE SIDE OF THE GARAGE. SEE PHOTOS SHEET E5.1.
SUPPLY THE EQUIPMENT FROM THE UNDERGROUND FEEDER FROM THE 480 VOLT PANEL IN THE CARPENTER SHOP AS DESCRIBED ON SHEET E4.0. THE 30 AMP 480 VOLT 2 POLE FUSIBLE SWITCH PROTECTS THE TRANSFORMER.
TRANSITION FROM THE #2 AL CONDUCTORS TO #10 COPPER CONDUCTORS ATA JUNCTION BOX ON THE BUILDING ADJACENT TO THE FUSIBLE SWITCH. THE FEEDER CONDUCTOR CHANGE ALLOWS THE CONDUCTORS TO FIT IN THE FUSIBLE SWITCH LUGS. USE #8 COPPER WIRE BETWEEN THE TRANSFORMER AND THE LIFT STATION PANEL. SEE
PARTIAL ONE LINE DIAGRAM THIS SHEET.
VERIFY STRUCTURE MOUNTING LOCATIONS ON THE CARPORT BUILDING WITH THE C.O. LOCATE LIFT STATION SO
THAT IT CAN BE SEEN FROM THE ROAD.
2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS.
INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. THE FLOAT CONDUCTORS IN CONDUIT CROSS THE EXISTING ROAD IN THE SAME TRENCH AS
THE SEWER LINE.
3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS (2 HOTS, 1 GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH MOTOR SUPPLY BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT. THE POWER CONDUCTORS IN CONDUITS CROSS THE EXISTING
ROAD IN THE SAME TRENCH AS THE SEWER LINE.
4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEPTIC TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CON- DUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0.
5. CONTINUATION OF THE FEEDER FROM THE CARPENTER SHOP AS SHOWN ON SHEET E4.0. THE ALUMINUM CON-
DUCTORS IN CONDUIT SHALL BE LOCATED IN THE SAME TRENCH AS THE SEWER LINE.
6. CONTINUATION OF THE ALARM CIRCUIT FROM THE CARPENTER SHOP AS SHOWN ON SHEET E4.0. THE ALARM CIR- CUIT CONDUCTORS IN CONDUIT SHALL BE LOCATED IN THE SAME TRENCH AS THE SEWER LINE AND THE NEW WATER
LINE AS INDICATED.
LIFT STATION EQUIPMENT
NOTE 1
NOTE 2,3
FUSIBLE SWITCH FS-2
120/240 1Ø
TO LIFT STATION PANEL
#10 CU (2 HOTS, 1 GROUND)
#10 CU (2 HOTS, 1 GROUND)
STUB TO FIT LUGS
480 VAC 1Ø FROM
CARP. SHOP
#8 CU (2 HOTS, 1 NEUTRAL, 1 GROUND)
10 KVA
#2 AL (2 HOTS, 1 GROUND) FEEDER
JUNCTION BOX ON SIDE OF
CARPORT ADJACENT TO
FUSIBLE SWITCH
PARTIAL ONE LINE DIAGRAM
T1 SEPARATELY DERIVED SYSTEM REQUIRES
GROUNDING TO TWO 5/8 INCH BY 8 FOOT COP-
PER CLAD STEEL GROUND RODS 6 FEET
APART DRIVEN AT THE CARPORT BUILDING.
ON STRUCTURE
UNDERGROUND FEEDER
NOTE 5
NOTE 5
NOTE 5
CONTINUES ON SHEET E4.0
RV DUMP STATION
HOLDING TANK
NOTE 4
NOTE 5
NOTE 6
NEW WATER LINE
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
CEDAR FLATS AREA #2 PHOTOS
E5.1 14
PHOTO E5.1-1 EXISTING AREA PANORAMA VIEW USING AREA SCANNER
CARPORT LOCATION FOR MOUNT-
ING SEWAGE LIFT STATION EQUIP-
MENT, CEDAR FLATS AREA #2
CARPENTER SHOP
NOTE THAT THE AREAOF WORK IN CEDAR FLATS IS MOSTLY OPEN COUNTRY.
PHOTO E5.1-2 EXISTING CARPORT
PHOTO E5.1-3 EXISTING CAR PORT
LOCATE EQUIPMENT ON DOWN HILL SIDE
OF CARPORT AS INDICATED.
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E6.0
NO SCALE
LIFT STATION DETAILS
SHEET SPECIFIC NOTES
1. CONDUIT SEAL OFFS ARE REQUIRED BETWEEN THE SEPTIC TANK AND THE LIFT STATION CONTROL
PANEL AND THE SEPTIC TANK AND THE ALARM BOX.
RECEPTACLE AND CONTROL POWER CIRCUITS DO NOT NEED SEAL OFFS IF THEY SUPPLY THE ENCLO-
SURE WITHOUT PASSING THROUGH THE WET WELL.
TRANSITION FROM PVC TO GALVANIZED RIGID CONDUIT TO INSTALL CONDUIT SEAL OFFS. THUS PVC CONDUIT IS CONNECTED TO GALVANIZED RIGID CONDUIT STUB, TO THE CONDUIT SEAL OFF, THENCE BACK TO GALVANIZED RIGID CONDUIT THROUGH THE WALL OF THE TANK OR RISER, AND THENCE CON-
NECTED TO THE NEMA 4X JUNCTION BOX.
2. SUPPORT THE FLOAT CABLE ON SIDE WALL OF RISER ASSEMBLY. HANG FLOAT FROM PVC TREE MOUNTED TO THE BOTTOM SIDE WALL OF THE RISER ASSEMBLY SUCH THAT THE FLOAT TREE HANGS DOWN FROM THE BOTTOM OF THE RISER ASSEMBLY INTO THE SEPTIC TANK CHAMBER. THIS AVOIDS
DRILLING INTO THE CONCRETE SEPTIC TANK.
ATTACH TO RISER USING STAINLESS STEEL BOLTS, CLAMPS, AND ANCHORS EPOXIED INTO CORE
DRILLED HOLES.
3. FURNISH AND INSTALL NEMA 4X JUNCTION BOXES (NOT SHOWN) TO TRANSITION FROM THE GALVA- NIZED RIGID CONDUIT PENETRATIONS TO FLOATS AND POWER CORD CONNECTIONS AND TO CREATE A
POINT OF DISCONNECTION FOR REMOVAL OF THE PUMPS AND/OR THE FLOATS.
NOTE 1
CONDUIT FOR FLOAT CONDUCTORS
CONDUIT FOR PUMPPOWER #1
CONDUIT FOR PUMP POWER #2
NOTE 1
NOTE 2
NOTE 3
NOTE 3
CONDUIT FOR ALARM FLOAT
#1 #2 #3
#4 #5
FLOAT ACTION
#1 HIGH WATER ALARM, REDUNDANT ALL PUMPS ON
#2 LAG PUMP ON
#3 LEAD PUMP ON
#4 ALL PUMPS OFF
#5 LOW WATER ALARM, REDUNDANT ALL PUMPS OFF
VERIFY FLOAT SETTINGS WITH CIVIL ENGINEERING DRAWINGS
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E6.1
LIFT STATION
STRUCTURE DETAIL
NO SCALE
LIFT STATION STRUCTURE DETAIL
#6 COPPER
GROUNDING
CONDUCTOR IN
CONDUIT TO
PANEL GROUND
BAR
ONE 8 FT COPPER
CLAD STEEL DRIVEN
GROUND ROD
EQUIPMENT TO BE SUPPORTED
1. LIFT STATION PANEL: INSTALL LIFT STATION PANEL ON THE STRUCTURE WITH THE
BOTTOM OF THE PANEL AT LEAST 3 FEET ABOVE GRADE.
2. ALARM BOX: FURNISH AND INSTALLAN ALARM BOX IN THE SPACE RESERVED TO THE
LEFT OF THE LIFT STATION PANEL.
3. DUPLEX WP RECEPTACLE: FURNISH AND INSTALL ONE 20 AMP DUPLEX GFCI
RECEPTACLE ON THE STRUCTURE. USE AMETAL COVER THAT MAINTAINS WEATHER
PROTECTION WITH A PLUG PLUGGED IN.
4. MOBILE HOME AREA: AT THE MOBILE HOME AREA, FURNISH AND INSTALLA METER
MAIN IN THE SPACE RESERVED TO THE LEFT OF THE LIFT STATION PANEL. COORDINATE
THE TYPE OF THE METER MAIN WITH THE COOPERATIVE. USE A SINGLE POLE 20 AMP
BREAKER TO SUPPLY THE RECEPTACLE. USE A TWO POLE 30 AMP BREAKER TO SUPPLY
THE LIFT STATION PANEL. USE ANOTHER SINGLE POLE 20 AMP BREAKER TO SUPPLY
THE ALARM BOX.
SHEET GENERALNOTES
A. USE EMT CONDUIT FOR ALL INTERCONNECTIONS BETWEEN EQUIPMENT ON THE
STRUCTURE. CONTINUE SCHEDULE 80 PVC CONDUITS FOR UNDERGROUND CIRCUITS
UP TO EQUIPMENT ON THE STRUCTURE.
B. ADJUST THE SPACING BETWEEN THE SUPPORT POSTS TO SUPPORT THE REQUIRED
COMBINATION OF EQUIPMENT NEEDED AT EACH LOCATION.
2 INCH STAINLESS STEEL POSTS
WITH STAINLESS STEEL CAPS
12 INCH BY 5 FOOT
SONOTUBE FILLED WITH
CONCRETE.
STAINLESS STEEL POST
END 1 FOOT ABOVE
BOTTOM OF CONCRETE.
CONCRETE EXTENDS 4
FEET INTO THE GROUND,
ONE FOOT OUT OF THE
GROUND.
STAINLESS STEEL
UNISTRUT CROSS
MEMBER AND VERTICAL
MEMBER
(TYPICAL)
LIFT
STATION
PANEL 5’ 0”
1’ 0” ABOVE
FINISHED
GRADE.
CHAMFER THE TOP OF THE
CONCRETE TO PREVENT WATER
POOLING
(TYPICAL OF ALL CONCRETE
SUPPORTS)
4’ 0” BURY
AREA FOR ALARM BOX,
RECEPTACLE, AND/OR
METER MAIN.
3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801
(406) 721-6996 fus@aol.com
MTF 12/2012
MTF 12/2012
MTF 12/2012
E6.2
TRENCH DETAILS
NO SCALE
TRENCH DETAIL
NOTE 2
WARNING TAPE
(FOR BOTH ELECTRICAL
AND DATA/ CONTROL
SCHEDULE 80 PVC
CONDUIT(S)
COMPACTED
BACKFILL
BEDDING SAND
UNDISTURBED EARTH
4 in.
4 in.
TRENCHINGAND BEDDING DETAIL
NOT TO SCALE
UNDISTURBED EARTH
4 in.
TRENCHING DETAIL NOTES:
1. SINGLE CONDUIT SHOWN. MULTIPLE CONDUITS WILL BE USED.
2. BURIAL DEPTH:
24 INCHES MINIMUM FOR ELECTRICAL POWERAND FLOAT CONDUCTOR CON-
DUITS.
3. IF MORE THAN ONE CONDUIT OF THE SAME FACILITY IS INSTALLED IN A
TRENCH, THE CONDUITS SHALL BE SEPARATED BY 2 INCHES MINIMUM. THE
DATAAND CONTROL CONDUITS CAN BE GROUPED IN A BUNDLE.
4. CONDUIT OR CONDUITS SHALL NOT BE LOCATED ANY CLOSER THAN 3 INCHES
FROM TRENCH SIDE WALL.
NOTE 2
UNDISTURBED EARTH
WARNING TAPE
SCHEDULE 80 PVC
CONDUIT(S)
COMPACTED
BACKFILL
BEDDING SAND
TRENCHINGAND BEDDING DETAIL (JOINT USE)
UNDISTURBED EARTH
TRENCHING DETAIL NOTES:
1. SINGLE CONDUIT SHOWN. MULTIPLE CONDUITS CAN BE USED.
2. BURIAL DEPTH 24 INCHES MINIMUM.
3. IF MORE THAN ONE CONDUIT OF THE SAME FACILITY IS INSTALLED IN A TRENCH, THE CONDUITS SHALL
BE SEPARATED BY 9 INCHES MINIMUM.
4. INSTALL CONDUITS 24 INCHES (UNLESS OTHERWISE NOTED) BELOW FOOTING FOUNDATION OR PAVE-
MENT BASE FILL.
5. CONDUIT OR CONDUITS SHALL NOT BE LOCATED ANY CLOSER THAN 3 INCHES FROM TRENCH SIDE WALL.
6. TO REDUCE TRENCHING COSTS AND IF THE 12 INCH HORIZONTAL CLEARANCE AND SIDE WALL CLEAR- ANCES CAN BE MAINTAINED, THE CONTRACTOR MAY INSTALL THE ELECTRICAL CONDUIT(S) AT THE SAME
DEPTH AS THE SEWER LINE.
12 in. min
OTHER
FACILITIES
SUCH AS GAS,
WATER, SEWER
ALLOWED BY
CODE.
NOT TO SCALE
4 in.
4 in.
4 in.
| E00 |
| E10 |
| E11 |
| E20 |
| E21 |
| E30 |
| E31 |
| E40 |
| E41 |
| E50 |
| E51 |
| E60 |
| E61 |
| E62 |