ELECTRIC_DRAWINGS.pdf

PDF 10 MB Posted

Attached to
Nez Perce Clearwater NF - Fenn Ranger Station Water and Wastewater Systems Replacement
Solicitation number
AG-02RC-S-13-0042
Issued by

About this file

Attachment J-3 Electrical Drawings 14 pages

View the file

Other files

File Type Posted
Amendment2Pgs2_3.docx DOCX document
Amendment2page1.doc DOC document
QuestionsAnswers2.docx DOCX document
Amendment1page1.doc DOC document
Amendment1Pgs2_3.docx DOCX document
FinalQuestionsAnswers.docx DOCX document
Amend1Pg4OxidationDitchTypical.pdf PDF
SiteTourNotes.docx DOCX document
AttendanceList.docx DOCX document
Fenn_Civil__Part3.pdf PDF
Fenn_Civil__Part1.pdf PDF
Fenn_Civil__Part2.pdf PDF
FennFinalRFP.doc DOC document
Fenn_Civil__Part4.pdf PDF
FENNSpecialProjectSpecifications.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUSSELL ENGINEERING

CONSULTING AND DESIGN

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

ELECTRICAL INDEX SHEET

E0.0 14

INDEX OF ELECTRICAL SHEETS

E0.0 ELECTRICAL INDEX SHEET

E1.0 NORTH HOMES AREA SITE ELECTRICAL

E1.1 NORTH HOMES AREA PHOTOS

E2.0 RANGER STATION AREA SITE ELECTRICAL

E2.1 RANGER STATION AREA PHOTOS

E3.0 MOBILE HOMES AREA SITE ELECTRICAL

E3.1 MOBILE HOMES AREA PHOTOS

E4.0 CEDAR FLATS AREA #1 SITE ELECTRICAL

E4.1 CEDAR FLATS AREA #1 PHOTOS

E5.0 CEDAR FLATS AREA #2 SITE ELECTRICAL

E5.1 CEDAR FLATS AREA #2 PHOTOS

E6.0 LIFT STATION DETAILS

E6.1 LIFT STATION STRUCTURE DETAIL

E6.2 TRENCH DETAILS

PROJECT GENERAL NOTES

1. SPECIFIC ELECTRICALONLY TRENCHING REQUIREMENT: ALL TRENCH BACKFILL COMPACTION SHALL

BE IN ACCORDANCE WITH THE CIVIL ENGINEERING DRAWINGS AND SPECIFICATIONS.

2. CONTRACTOR SHALL PROVIDE ALL TESTING (QUALITY CONTROL) FOR THIS PROJECT.

3. SPECIFIC ELECTRICALONLY TRENCHING REQUIREMENT: SURFACE RESTORATION SHALL BE IN

ACCORDANCEWITH THE CIVIL ENGINEERING DRAWINGS AND SPECIFICATIONS.

4. THE CONTRACTOR SHALL OBTAIN STATE AND LOCAL PERMITS FOR THIS PROJECT.

5. THE CONTRACTOR SHALL FIELD VERIFYALL UNDERGROUND UTILITIES. ALL COSTS ASSOCIATED

WITH UTILITY LOCATING AREAT THE CONTRACTOR’S EXPENSE.

6. ALL DEMOLISHED EQUIPMENT SHALL BE RECYCLED.

7. THE WORD ‘LIFT STATION’ MEANSA LIFT STATION, DOSING STATION, OR OTHER EQUIPMENT CONSIST- ING OF ACONTROL PANEL, AWET WELL WITH DUPLEX PUMPS, ANDA FLOAT SYSTEM FOR CONTROL.

8. THE WORD ‘CONTRACTOR’ MEANS THE GENERAL CONTRACTORANDALL OF THE SUB-CONTRACTORS

ASA TEAM.

9. FOR EACH OF THE CONNECTIONS BETWEEN THE CONTROL PANEL TO THE WET WELLAND SEPTIC TANK, A CONDUIT SEAL OFF IS REQUIRED. SEE SHEET E6.0 FOR DETAILS OF THE INSTALLATION OF THE

CONDUIT SEAL OFF.

10. VERIFYALL DIMENSIONS WITH THE CIVIL ENGINEERING DRAWINGS AS THE CIVIL ENGINEERING

DRAWINGS AREAUTHORITATIVE.

11. TRENCHING IN ACCORDANCE WITH THE TRENCHING DETAILS. JOINT USE WITH SEWERAND/OR WATER LINE INSTALLATION IS REQUIRED WHEN POSSIBLE TO MINIMIZE COSTS AND SITE DISRUPTIONS.

WHERE THE ELECTRICAL DRAWINGS CONFLICT WITH THE CIVIL ENGINEERING DRAWINGS, THE CIVIL

ENGINEERING DRAWINGS GOVERNS.

12. PHOTOS ARE INCLUDED TO HIGHLIGHT SPECIFIC ASPECTS OF THE PROJECT CONDITIONS AND

REQUIREMENTS.

13. CATALOG SHEETS DESCRIBING EQUIPMENTARE INCLUDEDWITH THE SPECIFICATIONS.

14. THE CONTRACTOR SHALL OBTAIN ACOMPLETE SET OF DRAWINGS INCLUDING ELECTRICALAND CIVIL ENGINEERING DRAWINGS. WITHOUTA FULL SET OF DRAWINGS AND SPECIFICATIONS, THE CON- TRACTOR WILL BE MISSING IMPORTANT INFORMATION WHICH WILL BE DETRIMENTAL TO COMPLETING

THE PROJECT.

15. UNLESS OTHERWISE INDICATED, THE WIRING METHOD WILL BE THWN COPPER CONDUCTORS IN

CONDUIT. THE CONDUIT SHALL BE EMTABOVE GRADE, SCHEDULE 80 PVC BELOW GRADE.

16. THE UTILITY IS IDAHO COUNTY LIGHTAND POWER, A COOPERATIVE HEADQUARTERED IN

GRANGEVILLE.

17. THE CO (CONTRACTING OFFICER) HASAS-BUILT DRAWINGS OF THE SITE WITH RESPECT TO VARIOUS PHASES OF THE WORK PREVIOUSLY DONE. THE ENGINEER CANNOT VERIFY THEIR ACCURACY, BUT

THEY MAY HAVE SOME UTILITY FOR THE CONTRACTOR.

18. THE WORDS CO OR C.O. MEAN THE US FOREST SERVICE CONTRACTING OFFICER OR THEIR REPRE-

SENTATIVE.

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E1.0 14

SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE

0 20' 40’ 80’ 120’

NORTH HOMESAREASITE ELECTRICAL

SHEET SPECIFIC NOTES

1. FURNISH AND INSTALL LIFT STATION CONTROL PANELAND SEPTIC TANK ALARM

BOX ON SIDE OF GARAGE AS INDICATED TO REPLACE THE EXISTING CONTROL PAN-

EL. SEE PHOTOS SHEET E1.1.

2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL

PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT

PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS. INSTALL IN CON-

DUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT

REQUIREMENTS LISTED ON SHEET E0.0.

3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH

OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS

(2 HOTS, 1GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND

THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH MOTOR SUP-

PLY BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT.

4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEP-

TIC TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS

A SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CONDUIT IN ACCOR-

DANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT REQUIREMENTS

LISTED ON SHEET E0.0.

5. FURNISH AND INSTALLA NEW 30 AMP CIRCUIT FROM THE EXISTING METER ON THE

SIDE OF THE HOUSE TO THE NEW LIFT STATION CONTROL PANEL. CONNECT THE

ALARM BOX TO THE LIFT STATION PANEL RECEPTACLE CIRCUIT.

6. LOCATION OF EXISTING METER AND FUSIBLE SWITCH.

NOTE 1

NOTE 4

NOTE 5

NOTE 6

NOTES 2,3

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

NORTH HOMES AREA PHOTOS

E1.1 14

PHOTO E1.1-1 EXISTING PANEL SERVICE

THIS EXISTING METER AND FUSIBLE SWITCH SUP-

PLIES THE EXISTING LIFT STATION PANEL.

DEMOLISH THE EXISTING FUSIBLE SWITCH AND

RECEPTACLE.

RETAIN METER.

FURNISH AND INSTALLA NEW FUSIBLE SWITCH

FS-1 IN THE SAME LOCATION AS THE EXISTING

FUSIBLE SWITCH.

BOND THE FUSIBLE SWITCH ENCLOSURE, SUP-

PLY NEUTRAL CONDUCTOR, THE LOAD NEUTRAL

CONDUCTOR, AND THE LOAD GROUND WIRE TO:

A COLD WATER PIPE AND

A NEW 5/8 INCH BY 8 FOOT COPPER CLAD STEEL

GROUND ROD AND TO THE EXISTING SERVICE

GROUND.

THE RECEPTACLE IS NOT REINSTALLED.

FUSE WITH 30 AMP CLASS R FUSES.

PHOTO E1.1-2 EXISTING FUSIBLE SWITCH AND

RECEPTACLE

PHOTO E1.1-3 NEW PANEL FEEDER

FURNISH AND INSTALLA NEW FEEDER FROM THE

NEW FUSIBLE SWITCH TO THE NEW LIFT STATION

PANEL.

THE FEEDER SHALL CONSIST OF 4 — #8 COPPER

TWHN CONDUCTORS (2 HOTS, 1 NEUTRAL, 1

GROUND) IN CONDUIT IN ACCORDANCE WITH THE

GENERAL PROJECT REQUIREMENTS LISTED ON

SHEET E0.0.

ROUTE THE FEEDER FROM THE METER BACK

AROUND THE HOUSE

AROUND THE GARAGE

TO THE NEW LIFT STATION PANEL LOCATION.

OBSERVATION OF CONDUIT GOING INTO THE

GROUND FROM THE EXISTING FUSIBLE SWITCH

AND COMING UP FROM THE GROUND INTO THE

EXISTING LIFT STATION PANEL SUGGESTS THAT

THE EXISTING PANEL SUPPLY COULD BE

INSTALLED IN UNDERGROUND CONDUIT.

THE CONTRACTOR MAY ELECT TO REUSE THE

EXISTING CONDUIT IF IT IS CONTINUOUS, LARGE

ENOUGH, AND A BELOW GRADE EXAMINATION AT

EACH END INDICATES THAT IT IS STILL USABLE

FROM A CORROSION POINT OF VIEW.

PHOTO E1.1-4 NEW PANEL FEEDER

DEMOLISH THE EXISTING PANEL

ON THE SIDE OF THE GARAGE.

REPLACE WITH A NEW LIFT STA-

TION PANEL AND A NEW ALARM

BOX.

PHOTO E1.1-5 AREA NEAR GARAGE

EXISTING LIFT STATION PANEL

EXISTING LIFT STATION WET

WELL

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE

0 20' 40’ 80’ 120’

RANGERSTATIONAREASITE ELECTRICAL

u

SHEET SPECIFIC NOTES

1. FURNISH AND INSTALL LIFT STATION CONTROL PANELAND SEPTIC TANK ALARM

BOX ON THE BACK SIDE OF RANGER STATION AS INDICATED TO REPLACE THE EXIST-

ING CONTROL PANEL. SEE PHOTOS SHEET E2.1.

2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL

PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT

PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS. INSTALL IN CON-

DUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT

REQUIREMENTS LISTED ON SHEET E0.0. (NOTE THAT THE ROUTE SHOWSA POSSIBLE

JOINT USE WITH THE NEW SEWER LINE(S).)

3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH

OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS (2

HOTS, 1 GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE

GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH MOTOR SUPPLY

BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT. (NOTE THAT THE ROUTE SHOWS

A POSSIBLE JOINT USE WITH THE NEW SEWER LINE(S).)

4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEPTIC

TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A

SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CONDUIT IN ACCORDANCE

WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED

ON SHEET E0.0. (NOTE THAT THE ROUTE SHOWS A POSSIBLE JOINT USE WITH THE

NEW SEWER LINE(S).)

5. FURNISH AND INSTALLA NEW 30 AMP CIRCUIT FROM AN EXISTING PANEL INSIDE

THE RANGER STATION. THERE IS A BASEMENT WITHIN THE BUILDING THAT CAN BE

USED TO RUN THE CIRCUIT TO THE NEW LIFT STATION PANEL LOCATION.

NOTE 1

NOTE 5

NOTES 2,3,4

NOTES 2,3, 4

SEPTIC TANK

WET WELL

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

RANGER STATION AREA PHOTOS

E2.1 14

PHOTO E2.1-1 EXISTING LIFT STATION PANEL

THE CONTRACTOR IS TO DEMOLISH THE

EXISTING LIFT STATION PANELAND

REPLACE IT WITH THE NEW LIFT STATION

PANEL AND ALARM BOX.

AS INDICATED ELSEWHERE ON THIS

SHEET, THE EXISTING SUPPLY TO THE

EXISTING PANEL COULD BE REUSED.

PHOTO E2.1-2 EXISTING LIFT STATION PANEL

THESE TWO CONDUITS AS SHOWN IN

PHOTO 3 THIS SHEET CONTAIN:

THE PANEL SUPPLY POWER AND

THE FLOAT CONDUCTORS

TO THE EXISTING WET WELL.

IT IS BELIEVED THAT THE EXISTING PANEL

IS SUPPLIED FROM A TWO POLE BREAKER

IN AN EXISTING PANEL LOCATED INSIDE

THE RANGER STATION BUILDING.

THE BUILDING CONTAINS A BASEMENT

AND THE FACT THAT THE POWER SUPPLY

CONDUIT GOES INTO THE GROUND SUG-

GESTS THAT IT TURNS INTO THE BASE-

MENT.

NEITHER OF THESE COMMENTS HAVE

BEEN FIELD VERIFIED.

PHOTO E2.1-3 EXISTING LIFT STATION PANEL

THE EXISTING POWER SUPPLY APPEARS

TO BE CONDUCTORS LARGER THAN #10

AND THE CONDUCTORS, ALTHOUGH NOT

MARKED, APPEAR TO BE TWO HOT CON-

DUCTORS, A NEUTRAL CONDUCTOR, AND A

GROUND CONDUCTOR.

THE CONTRACTOR SHALL TRACE THESE

CONDUCTORS AND DETERMINE THEIR

SUPPLY. THE NEW LIFT STATION PANEL

REQUIRES 4 — #10 CONDUCTORS (2 HOTS,

A NEUTRAL, AND AGROUND). IF THESE

EXISTING CONDUCTORS SUFFICE, THEY

CAN BE REUSED.

IF NOT, THEN THE CONTRACTOR SHALL

OBTAIN A NEW SOURCE OF POWER TO THE

NEW LIFT STATION WITHIN THE EXISTING

BUILDING.

FOR EXAMPLE THERE IS A PANEL NEAR

THE ENTRANCE TO THE BUILDING WHICH

IS AMODERN LOAD CENTER, THAT COULD

HAVE ROOM AND

HAS ACCESS TO THE BASEMENT VIA THIS

BASEMENT CEILING CAVITY/CRAWLSPACE.

THE NEW LOAD CENTER ACTUALLY

EXTENDS INTO THIS CAVITY.

PHOTO E2.1-4 EXISTING ELECTRICAL PANEL

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E3.0 14

SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE

0 20' 40’ 80’ 120’

MOBILE HOMESAREASITE ELECTRICAL

LIFT STATION STRUCTURE

NOTE 1

NOTE 2,3

NOTE 4

APPROXIMATE LOCA-

TION OF SECONDARY

SERVICE LIFT POLE

NOTE 5

NOTE 5

NOTE 5

120/240 VAC

SINGLE PHASE

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

MOBILE HOMES AREA PHOTOS

E3.1 14

PHOTO E3.1-1 STRUCTURE LOCATION

FURNISH AND INSTALL STRUCTURE

APPROXIMATELY HERE WITH THE FRONT

OF THE EQUIPMENT FACING THE WET

WELL.

PHOTO E3.1-2 STRUCTURE POWER SOURCE

PHOTO E3.1-3 STRUCTURE POWER SOURCE

DEMOLISH EXISTING SECONDARY

SERVICE TO THE MOBILE HOME.

THE EXISTING MOBILE HOME IS TO BE

MOVED FROM THIS SITE AND

REPLACED WITH A DRAIN FIELD.

THEREFORE EXISTING SECONDARY

SERVICE AND RELATED POLES MUST

BE REMOVED.

COORDINATING WITH IDAHO COUNTY

LIGHT AND POWER, REMOVE THE

EXISTING SECONDARY SERVICE AND

FURNISH AND INSTALL A NEW UNDER-

GROUND SERVICE FROM THE EXIST-

ING LIFT POLE IN ACCORDANCE WITH

THE PLANS ON E3.0.

IT IS THE C.O.’S RESPONSIBILITY TO

PAY FOR THE IDAHO COUNTY LIGHT

AND POWER CONTRIBUTION TO CON-

STRUCTION FOR THE SECONDARY

EXTENSION, IF A CONTRIBUTION TO

CONSTRUCTION IS REQUIRED.

THE EXISTING SECONDARY IS SUPPLIED

FROM THE REAR OF THE MOBILE HOME

AND FROM THE RIGHT IN PHOTO #3.

(THE LINE IS ADDED TO PHOTO #3.)

PHOTO E3.1-4 AREA BEHIND MOBILE HOME

EXISTING SECONDARY POLE BEHIND MOBILE HOME SUPPLY-

ING THE METER POLE SHOWN IN PHOTOS #2 AND #3.

THIS POLE LIKELY WILL NEED TO BE GUYED. FURNISH AND

INSTALLAN UNDERGROUND SECONDARY SERVICE FROM

THIS POLE TO THE NEW STRUCTURE METER MAIN AS

DESCRIBED ON E3.0.

SAME POLE

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E4.0 14

SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE

0 20' 40’ 80’ 120’

CEDAR FLATSAREA#1 SITE ELECTRICAL

SHEET SPECIFIC NOTES

1. FURNISH AND INSTALL LIFT STATION CONTROL PANEL AND 2 SEPTIC TANK ALARM BOXES ON THE SIDE OF CARPENTER SHOP AS INDICATED TO REPLACE THE EXISTING CONTROL PANEL. SEE PHOTOS SHEET E4.1.

2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS. INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJ-

ECT REQUIREMENTS LISTED ON SHEET E0.0.

3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS (2 HOTS, 1 GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH

MOTOR SUPPLY BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT.

4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEPTIC TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT REQUIREMENTS LIST-

ED ON SHEET E0.0.

5. FURNISH AND INSTALL A BRANCH CIRCUIT FROM THE EXISTING OR NEW 480 VOLT PANEL, VIAA STEP DOWN TRANSFORMER IN THE CARPENTER SHOP TO THE CEDAR FLATS AREA #1 SEWAGE LIFT STATION. SEE PHOTOS

SHEET E4.1 FOR ADDITIONAL DETAILS.

6. CROSS EXISTING PAVEMENT AT APPROXIMATELY THIS LOCATION DUE TO THE FACT THAT THE EXISTING PAVE-

MENT IS PARTIALLY REMOVED IN THIS AREA FOR SEWER LINE CONSTRUCTION.

7. FURNISH AND INSTALL A 480 VOLT SINGLE PHASE FEEDER FROM THE EXISTING OR NEW 480 VOLT PANEL TO THE SEWAGE LIFT STATION STRUCTURE IN THE CEDAR FLATS AREA #2 SITE (SHEET E5.0). ROUTE THE CONDUC- TORS IN PVC CONDUIT IN THE SAME TRENCH AS THE CEDAR FLATS AREA #1 LIFT STATION FLOATS AND POWER ACROSS THE ROAD AND THENCE IN THE SAME TRENCH AS THE SEWER LINE TO THE LIFT STATION IN CEDAR FLATS AREA #2. SEE SHEET E5.0 FOR THE PATH BEYOND THE AREA COVERED ON THIS SHEET. SEE PHOTOS

SHEET E4.1 FOR ADDITIONAL DETAILS.

8. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE RV DUMP STATION HOLDING TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 4 CON- DUCTORS. INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. INSTALL THIS CONDUIT IN THE SAME TRENCH AS THE SEWER LINE AS DESCRIBED IN NOTE 7. SEE SHEET E5.0 FOR THE PATH BEYOND THE AREA COVERED ON THIS SHEET.

NOTE 1

NOTE 4

NOTE 5

NOTE 6

NOTE 7

NOTE 7

120/240 1Ø

LIFT STATION PANEL

FROM CARP. SHOP 480

VOLT PANEL 2 POLE 30

AMP CIRCUIT BREAKER

#8 CU (2 HOTS, 1 NEUTRAL, 1 GROUND)

10 KVA

#10 CU (2 HOTS, 1 GROUND)

BRANCH CIRCUIT

PARTIAL ONE LINE DIAGRAM

T1

SEPARATELY DERIVED SYSTEM REQUIRES

GROUNDING TO BUILDING STEEL AND A

NEW 5/8 INCH BY 8 FOOT COPPER CLAD

STEEL GROUND ROD

INSIDE CARP. SHOP

OUTSIDE CARP. SHOP

NOTE 7

NOTE 2,3

NOTE 8

NOTE 8

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

CEDAR FLATS AREA #1 PHOTOS

E4.1 14

PHOTO E4.1-1 EXISTING 480 VOLT PANEL

THIS PANEL DOES NOT APPEAR TO HAVE VERY MANY CIRCUITS. THE

CONTRACTOR MAY USE THIS PANEL WITH NEW CIRCUIT BREAKERS

OR REPLACE THIS PANEL WITH AN EQUIVALENT LOAD CENTER, ADD-

ING THE NEW BREAKERS IN ADDITION TO RE-CONNECTING THE

EXISTING CIRCUITS.

CEDAR FLATS AREA #1 LIFT STATION:

THE CONTRACTOR SHALL FURNISH AND INSTALLA WALL MOUNTED

10 KVA 480 VOLT DELTATO 120/240 VOLT SINGLE PHASE TRANS-

FORMER AT THE PANEL LOCATION.

PROTECT THE TRANSFORMER WITH A 30 AMP TWO POLE BREAKER

SUPPLYING #10 COPPER THWN CONDUCTORS (2 HOTS, 1 GROUND)

IN EMT CONDUIT.

FROM THE TRANSFORMER FURNISH AND INSTALL #8 COPPER CON-

DUCTORS (2 HOTS, 1 NEUTRAL, 1 GROUND) IN EMT CONDUIT TO THE

SOURCE LUGS OF THE SEWAGE LIFT STATION PANEL. THE SECOND-

ARY OF THE TRANSFORMER MUST BE BONDED TO THE BUILDING

GROUND SYSTEM AND TO A 5/8 INCH COPPER CLAD STEEL GROUND

ROD AS THIS IS A SEPARATELY DERIVED SYSTEM.

ROUTE THE BRANCH CIRCUIT UP TO THE CARPENTER SHOP CEILING,

OVER AND THROUGH THE PARTY WALLWITH THE PAINT SHOP,

ACROSS THE PAINT SHOP CEILING, DOWN THE INSIDE OF THE OUT-

SIDE WALLAND THENCE TURNING INTO THE BACK OF THE LIFT STA-

TION ENCLOSURE ON THE OUTSIDE OF THE WALL.

POWER BOTH ALARM BOXES FROM THE RECEPTACLE CIRCUIT WITH-

IN THE LIFT STATION PANEL.

CEDAR FLATS AREA #2 LIFT STATION FEEDER:

FURNISH AND INSTALLA 2 POLE 30 AMP BREAKER SUPPLYING A 480

VOLT FEEDER TO CEDAR FLATS AREA #2 LIFT STATION. USE 3 — #10

COPPER CONDUCTORS (2 HOTS, 1 GROUND) IN EMT CONDUIT FROM

THE 480 VOLT PANEL TO OUTSIDE OF THE BUILDING ADJACENT TO

THE BRANCH CIRCUIT INSTALLED ABOVE. TURN THROUGH THE OUT-

SIDE WALL 2 FEET ABOVE GRADE AS INDICATED IN PHOTO 5 THIS

SHEET.

USING A JUNCTION BOX, TRANSITION TO 3 — #2 ALUMINUM THWN

CONDUCTORS (2 HOTS, 1 GROUND) IN SCHEDULE 40 PVC CONDUIT

TO THE CEDAR FLATS AREA #2 LIFT STATION STEP DOWN TRANS-

FORMER.

TYPE BRKR: ITE TYPE ET

CAT #: NHB 12-4L?

3 Ø 4 WIRE

JOB #: Y-SP 387-3

277/480 AC

100 AMP

480 VOLT PANEL

PHOTO E4.1-2 EXISTING 480 VOLT PANEL

PHOTO E4.1-3 EXISTING 480 VOLT PANEL NAMEPLATE

PHOTO E4.1-4 EXISTING 480 VOLT PANEL CARD

PHOTO E4.1-5 LOCATION OF CEDAR FLATS AREA #1 LIFT STATION

FURNISH AND INSTALL THE

CEDAR FLATS AREA #1 LIFT STA-

TION AND BOTH ALARM ENCLO-

SURES ON THE OUTSIDE OF THE

WALLAPPROXIMATELY HERE.

TO CEDAR

FLATSAREA #2

LIFT STATION

FURNISH AND INSTALL THE

CEDAR FLATS AREA #2 LIFT STA-

TION FEEDER THROUGH THE

OUTSIDE WALL, TRANSITION TO

SCHEDULE 40 PVC CONDUIT AND

#2 AL CONDUCTORS (2 HOTS, 1

GROUND), THENCE UNDER-

GROUND USING JOINT USE WITH

THE SEWER LINE TRENCH TO

THE CEDAR FLATS AREA #2 LIFT

STATION MOUNTED ON THE OUT-

SIDE OF CARPORT.

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E5.0 14

SCALE: 1 INCH = 40 FEET AT 11 X 17 SIZE

0 20' 40’ 80’ 120’

CEDAR FLATSAREA#2 SITE ELECTRICAL

SHEET SPECIFIC NOTES

1. FURNISH AND INSTALL LIFT STATION EQUIPMENT INCLUDING A 30 AMP, 2 POLE, 480 VOLT FUSIBLE SWITCH, AN OUTDOOR RATED 10 KVA TRANSFORMER, A LIFT STATION PANEL, AND AN ALARM BOX SURFACE MOUNTED ON THE SIDE OF THE EXISTING CARPORT. SOME CAREFUL LOCATION OF THE EQUIPMENT WILL BE REQUIRED IN ORDER TO

FIT ON THE SIDE OF THE GARAGE. SEE PHOTOS SHEET E5.1.

SUPPLY THE EQUIPMENT FROM THE UNDERGROUND FEEDER FROM THE 480 VOLT PANEL IN THE CARPENTER SHOP AS DESCRIBED ON SHEET E4.0. THE 30 AMP 480 VOLT 2 POLE FUSIBLE SWITCH PROTECTS THE TRANSFORMER.

TRANSITION FROM THE #2 AL CONDUCTORS TO #10 COPPER CONDUCTORS ATA JUNCTION BOX ON THE BUILDING ADJACENT TO THE FUSIBLE SWITCH. THE FEEDER CONDUCTOR CHANGE ALLOWS THE CONDUCTORS TO FIT IN THE FUSIBLE SWITCH LUGS. USE #8 COPPER WIRE BETWEEN THE TRANSFORMER AND THE LIFT STATION PANEL. SEE

PARTIAL ONE LINE DIAGRAM THIS SHEET.

VERIFY STRUCTURE MOUNTING LOCATIONS ON THE CARPORT BUILDING WITH THE C.O. LOCATE LIFT STATION SO

THAT IT CAN BE SEEN FROM THE ROAD.

2. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE LIFT STATION CONTROL PANEL TO THE WET WELL FLOATS USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 12 CONDUCTORS.

INSTALL IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. THE FLOAT CONDUCTORS IN CONDUIT CROSS THE EXISTING ROAD IN THE SAME TRENCH AS

THE SEWER LINE.

3. FURNISH AND INSTALL POWER FROM THE LIFT STATION CONTROL PANEL TO EACH OF THE TWO PUMPS IN THE WET WELL USING 3 — #10 COPPER THWN CONDUCTORS (2 HOTS, 1 GROUND) IN CONDUIT IN ACCORDANCE WITH THE TRENCHING DETAILAND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0. EACH MOTOR SUPPLY BRANCH CIRCUIT SHALL BE IN A SEPARATE CONDUIT. THE POWER CONDUCTORS IN CONDUITS CROSS THE EXISTING

ROAD IN THE SAME TRENCH AS THE SEWER LINE.

4. FURNISH AND INSTALL FLOAT CONDUCTORS FROM THE ALARM BOX TO THE SEPTIC TANK FLOAT USING TWO #12 THWN CONDUCTORS PER FLOAT PLUS ONE PAIR AS A SPARE. THIS IS A TOTAL OF 4 CONDUCTORS. INSTALL IN CON- DUIT IN ACCORDANCE WITH THE TRENCHING DETAIL AND THE GENERAL PROJECT REQUIREMENTS LISTED ON SHEET E0.0.

5. CONTINUATION OF THE FEEDER FROM THE CARPENTER SHOP AS SHOWN ON SHEET E4.0. THE ALUMINUM CON-

DUCTORS IN CONDUIT SHALL BE LOCATED IN THE SAME TRENCH AS THE SEWER LINE.

6. CONTINUATION OF THE ALARM CIRCUIT FROM THE CARPENTER SHOP AS SHOWN ON SHEET E4.0. THE ALARM CIR- CUIT CONDUCTORS IN CONDUIT SHALL BE LOCATED IN THE SAME TRENCH AS THE SEWER LINE AND THE NEW WATER

LINE AS INDICATED.

LIFT STATION EQUIPMENT

NOTE 1

NOTE 2,3

FUSIBLE SWITCH FS-2

120/240 1Ø

TO LIFT STATION PANEL

#10 CU (2 HOTS, 1 GROUND)

#10 CU (2 HOTS, 1 GROUND)

STUB TO FIT LUGS

480 VAC 1Ø FROM

CARP. SHOP

#8 CU (2 HOTS, 1 NEUTRAL, 1 GROUND)

10 KVA

#2 AL (2 HOTS, 1 GROUND) FEEDER

JUNCTION BOX ON SIDE OF

CARPORT ADJACENT TO

FUSIBLE SWITCH

PARTIAL ONE LINE DIAGRAM

T1 SEPARATELY DERIVED SYSTEM REQUIRES

GROUNDING TO TWO 5/8 INCH BY 8 FOOT COP-

PER CLAD STEEL GROUND RODS 6 FEET

APART DRIVEN AT THE CARPORT BUILDING.

ON STRUCTURE

UNDERGROUND FEEDER

NOTE 5

NOTE 5

NOTE 5

CONTINUES ON SHEET E4.0

RV DUMP STATION

HOLDING TANK

NOTE 4

NOTE 5

NOTE 6

NEW WATER LINE

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

CEDAR FLATS AREA #2 PHOTOS

E5.1 14

PHOTO E5.1-1 EXISTING AREA PANORAMA VIEW USING AREA SCANNER

CARPORT LOCATION FOR MOUNT-

ING SEWAGE LIFT STATION EQUIP-

MENT, CEDAR FLATS AREA #2

CARPENTER SHOP

NOTE THAT THE AREAOF WORK IN CEDAR FLATS IS MOSTLY OPEN COUNTRY.

PHOTO E5.1-2 EXISTING CARPORT

PHOTO E5.1-3 EXISTING CAR PORT

LOCATE EQUIPMENT ON DOWN HILL SIDE

OF CARPORT AS INDICATED.

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E6.0

NO SCALE

LIFT STATION DETAILS

SHEET SPECIFIC NOTES

1. CONDUIT SEAL OFFS ARE REQUIRED BETWEEN THE SEPTIC TANK AND THE LIFT STATION CONTROL

PANEL AND THE SEPTIC TANK AND THE ALARM BOX.

RECEPTACLE AND CONTROL POWER CIRCUITS DO NOT NEED SEAL OFFS IF THEY SUPPLY THE ENCLO-

SURE WITHOUT PASSING THROUGH THE WET WELL.

TRANSITION FROM PVC TO GALVANIZED RIGID CONDUIT TO INSTALL CONDUIT SEAL OFFS. THUS PVC CONDUIT IS CONNECTED TO GALVANIZED RIGID CONDUIT STUB, TO THE CONDUIT SEAL OFF, THENCE BACK TO GALVANIZED RIGID CONDUIT THROUGH THE WALL OF THE TANK OR RISER, AND THENCE CON-

NECTED TO THE NEMA 4X JUNCTION BOX.

2. SUPPORT THE FLOAT CABLE ON SIDE WALL OF RISER ASSEMBLY. HANG FLOAT FROM PVC TREE MOUNTED TO THE BOTTOM SIDE WALL OF THE RISER ASSEMBLY SUCH THAT THE FLOAT TREE HANGS DOWN FROM THE BOTTOM OF THE RISER ASSEMBLY INTO THE SEPTIC TANK CHAMBER. THIS AVOIDS

DRILLING INTO THE CONCRETE SEPTIC TANK.

ATTACH TO RISER USING STAINLESS STEEL BOLTS, CLAMPS, AND ANCHORS EPOXIED INTO CORE

DRILLED HOLES.

3. FURNISH AND INSTALL NEMA 4X JUNCTION BOXES (NOT SHOWN) TO TRANSITION FROM THE GALVA- NIZED RIGID CONDUIT PENETRATIONS TO FLOATS AND POWER CORD CONNECTIONS AND TO CREATE A

POINT OF DISCONNECTION FOR REMOVAL OF THE PUMPS AND/OR THE FLOATS.

NOTE 1

CONDUIT FOR FLOAT CONDUCTORS

CONDUIT FOR PUMPPOWER #1

CONDUIT FOR PUMP POWER #2

NOTE 1

NOTE 2

NOTE 3

NOTE 3

CONDUIT FOR ALARM FLOAT

#1 #2 #3

#4 #5

FLOAT ACTION

#1 HIGH WATER ALARM, REDUNDANT ALL PUMPS ON

#2 LAG PUMP ON

#3 LEAD PUMP ON

#4 ALL PUMPS OFF

#5 LOW WATER ALARM, REDUNDANT ALL PUMPS OFF

VERIFY FLOAT SETTINGS WITH CIVIL ENGINEERING DRAWINGS

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E6.1

LIFT STATION

STRUCTURE DETAIL

NO SCALE

LIFT STATION STRUCTURE DETAIL

#6 COPPER

GROUNDING

CONDUCTOR IN

CONDUIT TO

PANEL GROUND

BAR

ONE 8 FT COPPER

CLAD STEEL DRIVEN

GROUND ROD

EQUIPMENT TO BE SUPPORTED

1. LIFT STATION PANEL: INSTALL LIFT STATION PANEL ON THE STRUCTURE WITH THE

BOTTOM OF THE PANEL AT LEAST 3 FEET ABOVE GRADE.

2. ALARM BOX: FURNISH AND INSTALLAN ALARM BOX IN THE SPACE RESERVED TO THE

LEFT OF THE LIFT STATION PANEL.

3. DUPLEX WP RECEPTACLE: FURNISH AND INSTALL ONE 20 AMP DUPLEX GFCI

RECEPTACLE ON THE STRUCTURE. USE AMETAL COVER THAT MAINTAINS WEATHER

PROTECTION WITH A PLUG PLUGGED IN.

4. MOBILE HOME AREA: AT THE MOBILE HOME AREA, FURNISH AND INSTALLA METER

MAIN IN THE SPACE RESERVED TO THE LEFT OF THE LIFT STATION PANEL. COORDINATE

THE TYPE OF THE METER MAIN WITH THE COOPERATIVE. USE A SINGLE POLE 20 AMP

BREAKER TO SUPPLY THE RECEPTACLE. USE A TWO POLE 30 AMP BREAKER TO SUPPLY

THE LIFT STATION PANEL. USE ANOTHER SINGLE POLE 20 AMP BREAKER TO SUPPLY

THE ALARM BOX.

SHEET GENERALNOTES

A. USE EMT CONDUIT FOR ALL INTERCONNECTIONS BETWEEN EQUIPMENT ON THE

STRUCTURE. CONTINUE SCHEDULE 80 PVC CONDUITS FOR UNDERGROUND CIRCUITS

UP TO EQUIPMENT ON THE STRUCTURE.

B. ADJUST THE SPACING BETWEEN THE SUPPORT POSTS TO SUPPORT THE REQUIRED

COMBINATION OF EQUIPMENT NEEDED AT EACH LOCATION.

2 INCH STAINLESS STEEL POSTS

WITH STAINLESS STEEL CAPS

12 INCH BY 5 FOOT

SONOTUBE FILLED WITH

CONCRETE.

STAINLESS STEEL POST

END 1 FOOT ABOVE

BOTTOM OF CONCRETE.

CONCRETE EXTENDS 4

FEET INTO THE GROUND,

ONE FOOT OUT OF THE

GROUND.

STAINLESS STEEL

UNISTRUT CROSS

MEMBER AND VERTICAL

MEMBER

(TYPICAL)

LIFT

STATION

PANEL 5’ 0”

1’ 0” ABOVE

FINISHED

GRADE.

CHAMFER THE TOP OF THE

CONCRETE TO PREVENT WATER

POOLING

(TYPICAL OF ALL CONCRETE

SUPPORTS)

4’ 0” BURY

AREA FOR ALARM BOX,

RECEPTACLE, AND/OR

METER MAIN.

3700 S. RUSSELL SUITE 106 MISSOULA, MT 59801

(406) 721-6996 fus@aol.com

MTF 12/2012

MTF 12/2012

MTF 12/2012

E6.2

TRENCH DETAILS

NO SCALE

TRENCH DETAIL

NOTE 2

WARNING TAPE

(FOR BOTH ELECTRICAL

AND DATA/ CONTROL

SCHEDULE 80 PVC

CONDUIT(S)

COMPACTED

BACKFILL

BEDDING SAND

UNDISTURBED EARTH

4 in.

4 in.

TRENCHINGAND BEDDING DETAIL

NOT TO SCALE

UNDISTURBED EARTH

4 in.

TRENCHING DETAIL NOTES:

1. SINGLE CONDUIT SHOWN. MULTIPLE CONDUITS WILL BE USED.

2. BURIAL DEPTH:

24 INCHES MINIMUM FOR ELECTRICAL POWERAND FLOAT CONDUCTOR CON-

DUITS.

3. IF MORE THAN ONE CONDUIT OF THE SAME FACILITY IS INSTALLED IN A

TRENCH, THE CONDUITS SHALL BE SEPARATED BY 2 INCHES MINIMUM. THE

DATAAND CONTROL CONDUITS CAN BE GROUPED IN A BUNDLE.

4. CONDUIT OR CONDUITS SHALL NOT BE LOCATED ANY CLOSER THAN 3 INCHES

FROM TRENCH SIDE WALL.

NOTE 2

UNDISTURBED EARTH

WARNING TAPE

SCHEDULE 80 PVC

CONDUIT(S)

COMPACTED

BACKFILL

BEDDING SAND

TRENCHINGAND BEDDING DETAIL (JOINT USE)

UNDISTURBED EARTH

TRENCHING DETAIL NOTES:

1. SINGLE CONDUIT SHOWN. MULTIPLE CONDUITS CAN BE USED.

2. BURIAL DEPTH 24 INCHES MINIMUM.

3. IF MORE THAN ONE CONDUIT OF THE SAME FACILITY IS INSTALLED IN A TRENCH, THE CONDUITS SHALL

BE SEPARATED BY 9 INCHES MINIMUM.

4. INSTALL CONDUITS 24 INCHES (UNLESS OTHERWISE NOTED) BELOW FOOTING FOUNDATION OR PAVE-

MENT BASE FILL.

5. CONDUIT OR CONDUITS SHALL NOT BE LOCATED ANY CLOSER THAN 3 INCHES FROM TRENCH SIDE WALL.

6. TO REDUCE TRENCHING COSTS AND IF THE 12 INCH HORIZONTAL CLEARANCE AND SIDE WALL CLEAR- ANCES CAN BE MAINTAINED, THE CONTRACTOR MAY INSTALL THE ELECTRICAL CONDUIT(S) AT THE SAME

DEPTH AS THE SEWER LINE.

12 in. min

OTHER

FACILITIES

SUCH AS GAS,

WATER, SEWER

ALLOWED BY

CODE.

NOT TO SCALE

4 in.

4 in.

4 in.

E00
E10
E11
E20
E21
E30
E31
E40
E41
E50
E51
E60
E61
E62