1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

Amendment No. 4 07/12/2016

6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:

USDA Forest Service SW Idaho/Nevada Acquisition Center 1249 South Vinnell Way, Suite 200 Boise, ID 83709-1663

8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER

[X] AG-0261-S-16-0047

9B. DATED (see item 11) 06-18-2016

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE ORDER IS PURSUANT TO: FAR 52.243-5 Changes and Changed Conditions

The changes set forth in Item 14 are made in the Contract Order Number in Item 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[ ] D. OTHER (specify type of modification and authority)

E. Contractor [ ] is, [X ] is not required to sign this document and return _____ ___ copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

REFER TO AG-0261-S-16-0047 Seasonal Bunkhouse Housing 2016 Salmon Challis Sawtooth National Forest, SOLICITATION DATED 06/18/2016 and amend as follows:

1. See attached document’s

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

Karen L. Morthlland , Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

__________________________ BY:________________________

(Signature of authorized person to sign) (Signature of Contracting Officer)

Seasonal Bunkhouse Housing 2016 – Salmon-Challis and Sawtooth National Forests Construction Projects

AG-0261-S-16-0047

Amendment #4

Challis Questions and Answers

Q: Where does the connection for potable water connection need to occur after the city water meter?

A: The connection will need to occur approximately 8 feet downstream from the city water meter. The contractor shall connect to the existing water pipe.

Q: How will the irrigation system connect into the water system?

A: The irrigation system shall be bid as if it connects to the existing irrigation line that is connected to a Forest Service well. The location of this connection is shown on sheet 11.

Q: What hydraulic calculation information is available for each building so fire sprinkler system design can occur?

A: The water system has been designed so that at each building water service box at 20 psi dynamic pressure that a minimum 50 gpm of flow will be provided.

Stanley Bunkhouse Drawings

Sheet 7 of 17, delete sheet and replace with new sheet included in this amendment. This sheet was accidentally not attached to amendment 3 and is attached to this amendment.

Point Table

Point #

Northing

10171.15

10189.89

10160.77

10142.03

10169.81

10185.65

10188.15

10178.72

10142.93

10130.99

10115.47

10098.15

10150.52

10157.49

10164.56

10183.97

10203.39

10203.25

10195.20

10183.28

9999.97

9833.41

9747.79

9918.08

Easting

9867.30

9849.27

9819.00

9837.03

9870.26

9886.70

9890.97

9903.73

9820.63

9833.42

9844.11

9850.75

9812.51

9805.50

9805.64

9825.82

9846.00

9853.07

9860.81

10000.00

10000.03

9813.37

9986.09

10182.51

Elevation

1015.50

1015.50

1015.50

1015.50

1014.00

1011.91

1011.81

1010.22

1013.00

1011.26

1009.36

1008.50

1013.20

1013.30

1013.40

1013.50

1013.40

1013.30

1013.20

1008.27

999.90

1004.44

1005.31

997.09

Description

BLDG

BLDG

BLDG

BLDG

PATH

PATH

PATH

PATH

SWALE

SWALE

SWALE

SWALE

TOE

TOE

TOE

TOE

TOE

TOE

TOE

CP2

CP1

CP4

CP3

CP5