Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 29

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

Amendment No. 3 07/08/2016

6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:

USDA Forest Service SW Idaho/Nevada Acquisition Center 1249 South Vinnell Way, Suite 200 Boise, ID 83709-1663

8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER

[X] AG-0261-S-16-0047

9B. DATED (see item 11) 06-18-2016

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE ORDER IS PURSUANT TO: FAR 52.243-5 Changes and Changed Conditions

The changes set forth in Item 14 are made in the Contract Order Number in Item 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[ ] D. OTHER (specify type of modification and authority)

E. Contractor [ ] is, [X ] is not required to sign this document and return _____ ___ copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

REFER TO AG-0261-S-16-0047 Seasonal Bunkhouse Housing 2016 Salmon Challis Sawtooth National Forest, SOLICITATION DATED 06/18/2016 and amend as follows:

1. See attached document’s

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

Karen L. Morthlland , Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

__________________________ BY:________________________

(Signature of authorized person to sign) (Signature of Contracting Officer)

Seasonal Bunkhouse Housing 2016 – Salmon-Challis and Sawtooth National Forests Construction Projects

AG-0261-S-16-0047

Amendment #3

Solicitation Document Pages 4 through 7

DELETE SCHEDULE OF ITEMS AND USE THE ATTACHED SCHEDULE FOR BIDDING

PURPOSES.

Solicitation Document Page 17

DELETE SECTION F-2 AND REPLACE WITH THE FOLLOWING:

F-2 Contract Time

Estimated Start Date: August 15, 2016 for both projects

Challis Seasonal Housing Demolition and Construction The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire base work items and Options A and B, if awarded, within 320 calendar days. If option items C and D are awarded 30 days and 30 days will be added to contract time for options C and D; respectively. The time stated for completion shall include final cleanup on the premises.

Stanley Seasonal Housing Construction The Contractor shall (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work within 340 calendar days. The time stated for completion shall include final cleanup on the premises.

Questions and Answers for Both Sites

Q: Does the contract time include suspension of work for seasonal shutdown?

A: No, the contract time will run continuous for both projects including during the winter when work onsite will not likely be possible.

Challis Bunkhouse Drawings and Specifications

Any references to 4:12 roof pitch shall be deleted and replaced with 2.5:12 roof pitch or steeper.

Challis Bunkhouse Specifications

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 000050 – MODULAR UNITS:

Under Part 2, under paragraph 2.1 H.4 delete “one dishwasher.”

Under Part 2, under paragraph 2.1.H.4 delete “island” and replace with “peninsula”.

Under Part 2, delete paragraph 2.9 on the fire sprinkler system. There is clarification in the Q and A on the type of system that shall be installed included in this amendment.

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 113100 – RESIDENTAIL

APPLIANCES:

Under Part 2, delete paragraph 2.7 eliminating the need for a dishwasher.

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 074113 – METAL ROOF PANELS:

Under Part 1, delete paragraph 1.9 C eliminating the need for a weather tightness warranty.

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 081113 – HOLLOW METAL

DOORS AND FRAMES:

Under Part 2, under paragraph 2.3 A delete, “At location indicated in the Door and Frame Schedule” as a schedule will not be provided.

Under Part 2, under paragraph 2.3 A.2.a delete the paragraph as a schedule will not be provided.

Under Part 2, under paragraph 2.7 D delete, “the Door and Hardware Schedule” as a schedule will not be provided.

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 087100 – DOOR HARDWARE:

Under Part 2, under paragraph 1.2 B.2.b delete, “door and frame schedule” as a schedule will not be provided.

Challis Questions and Answers

Q: What needs to occur with the timber and slash generated during tree removal?

A: Timber with diameter that is 4-inches and greater shall be piled on site at a location agreed upon with the Contracting Officer. Forest Service fire crew will cut the timber into firewood at a later date. Slash less than 4-inches in diameter shall be removed from the site in accordance with specifications.

Q: Section 000050-5 Paragraph K states: “Kitchen cabinets shall be provided in compliance with Specifications Section 064023 Interior Architectural Woodwork. Provide a minimum of 20-lineal feet of countertops with 4-inch backsplashes for base cabinets in kitchens and laundry room and wall hung and base cabinet countertops for restrooms. Provide 8 LF of island countertop with wider profile, and 30” high eating area as shown on the drawings. Provide approximately 5 lineal feet of upper wall cabinets in laundry area.”

Are base cabinets required in bathrooms and kitchens?

A: It intent of the contract documents that all kitchen and base cabinets have base cabinets. Contractor shall provide a lazy susan in the corner next to the refrigerator as part of the kitchen design. No direction will be provided for the ADA accessible sink base. The island reference needs to be corrected to a peninsula and will be noted as an amendment to the specifications.

Q: Are all windows are to have solid surfacing materials for window sills?

A: Yes.

Q: What types of doors are required for the pantry?

A: Sliding doors that are similar in construction and appearance to the other interior doors in the building in accordance with specifications. The thought is to prevent swinging doors from taking up more room inside the living space.

Q: What types of doors are required for the washer/dryer?

A: Swinging doors that are similar in construction and appearance to the other interior doors in the building in accordance with specifications. These shall not be sliders because someone may need both doors open at the same time to transfer clothes from washer to dryer.

Q: Dishwasher is not shown on the drawings. Where is it to be located?

A: The requirement for a dishwasher is deleted from the specifications in this amendment.

Q: What information is available on the type of fire sprinkler system that will be used?

A: Attached to this amendment is a drawing set of a design for a typical sprinkler system set-up to drain each winter for a building. We are wanting a wet system that is connected to the domestic potable system so that the water circulates throughout the system and designed in such a way that it is self-draining for winterization. A contact of a consultant who has designed such a system is below. This information is provided to possibly assist contractors and a contractor is not limited to use this consultant.

Greg Jones PCI Fire Protection Consultants 1199 S Main St #101, Centerville, UT 84012

(801) 295-6070

(801) 232-2217 greg@pciut.com

Q: Specification Section 081113-1, paragraph 2.3.A and 2.3.A.2.A state: “As indicated in the Door and

Frame Schedule.” Will you provide a door and hardware schedule?

A: No, the door information is included in specification 000050 Modular Units, Paragraph K. This amendment deletes the reference to the schedule in the specifications.

Q: What is the heat source for the Challis buildings?

mailto:greg@pciut.com

A: The heat source for the Challis buildings is individual forced air electric heat with thermostats controlling individual rooms.

Q: Section 099113 paragraph 3.5 D states, “Wood and fiber cement substrates: including wood trim architectural woodwork fiber siding, soffit, and trim.” Is the intent of the specifications to have factory finished fiber cement (James Hardi Color Plus or approved equal) or is it to be painted on site?

A: It is the intent for the fiber cement siding to come factory finished. It is mentioned in the painting specification as it is very likely that some touch-up will need to occur (nail holes and other items).

Q: Are gutters needed for the building?

A: No.

Q: Section 081113-2, paragraph 2.4.A, in regards to borrowed lites, states: “Construction: Fully welded.”

Can knockdown or adjustable frames be used since these are the industry standard in modular construction?

A: The project shall be bid as stated in the specification for construction fully welded lites.

Q: Section 262416-1, paragraph 1.1.A.1 call out distribution panelboards and load centers. Where is each to be used?

A: A contractor may choose to install a load center or a distribution panelboard for Panel A on the modular buildings. They shall be of a quality consistent with a Square D, QO or higher quality.

Q: What information exists on asbestos and lead based paint for the buildings that are slated for demolition?

A: There is no information available. The contractor shall bid the project as these do not exist. The Forest

Service will have inspections done and if they do exist a modification will be processed after award to deal with these items.

Q: What are the ages of the trailers that are to be removed?

A: The trailers were moved on site in 1978 but we have no knowledge of when they were built or if they were moved from previous locations.

Q: Can the roof pitch be adjusted?

A: This amendment will change the Challis project to a minimum of a 2.5 to 12 slope.

Q: It is unlikely to get an exposed fastener metal roof that has a 10-year weather tightness warranty. What does the Forest Service want to do?

A: The 10-year weather tightness requirement will be deleted as part of this amendment.

Stanley Bunkhouse Drawings

Sheet 7 of 17, delete sheet and replace with new sheet included in this amendment.

Stanley Bunkhouse Specifications:

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 000050 – MODULAR UNITS:

Under Part 2, delete paragraph 2.8 on the fire sprinkler system. There is clarification in the Q and A on the type of system that shall be installed included in this amendment.

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 081113 – HOLLOW METAL

DOORS AND FRAMES:

Under Part 2, under paragraph 2.3 A delete, “At location indicated in the Door and Frame Schedule” as a schedule will not be provided.

Under Part 2, under paragraph 2.3 A.2.a delete the paragraph as a schedule will not be provided.

Under Part 2, under paragraph 2.7 D delete, “the Door and Hardware Schedule” as a schedule will not be provided.

ADD AND/OR DELETE THE FOLLOWING FROM SECTION 087100 – DOOR HARDWARE:

Under Part 2, under paragraph 1.2 B.2.b delete, “door and frame schedule” as a schedule will not be provided.

DELETE SPECIFICATION 096520 – SHEET VINYL FLOOR COVERINGS.

Stanley Bunkhouse Questions and Answers

Q: What type of exterior door is required?

A: The exterior door shall be a metal door in accordance with drawings and specifications.

Q: What pressure and flows are calculated to be available at the bunkhouse?

A: The calculated dynamic pressures at the existing valve for the new Stanley bunkhouse are 48.2 psi at 20 gpm, 47.8 psi at 30 gpm, and 47.2 psi at 40 gpm.

Q: Section 000050-3 Paragraph 4 states: “A minimum of 14-linear feet of 24-inch deep countertops including 1-double sink and an 8’-foot island with a 6-foot eating counter.” There is no mention of base cabinets, please clarify if there are to be base cabinets under the 14’ of countertops and/or under or island.

We would like to request an elevation drawing showing what base cabinet components would be preferred.

i.e. type and number of drawer bases, sizing (24”, 36” wide), lazy Suzanne, type of ADA accessible sink base.

A: It is the intent of the contract documents that all countertop will have kitchen base cabinets below (except for under the eating area). Section 000050, paragraph 2.1 L.1 states, “Provide a minimum of 14-lineal feet of countertops with 4-inch backsplashes for base cabinets in kitchens…” Elevation drawings will not be provided as it will be considered as part of the design for the new building. Contractor shall provide a lazy susan in the corner next to the refrigerator as part of the kitchen design. No direction will be provided for the ADA accessible sink base.

Q: Are all windows are to have solid surfacing materials for window sills?

A: Yes.

Q: What is the intent of the pantry and will it have doors?

A: The intent is for the pantry to be floor to ceiling cabinets matching the base and wall cabinets. The cabinets are to have doors.

Q: What information is available on the type of fire sprinkler system that will be used?

A: Attached to this amendment is a drawing set of a design for a typical sprinkler system set-up to drain each winter for a building. We are wanting a wet system that is connected to the domestic potable system so that the water circulates throughout the system and designed in such a way that it is self-draining for winterization. A contact of a consultant who has designed such a system is below. This information is provided to possibly assist contractors and a contractor is not limited to use this consultant.

Greg Jones PCI Fire Protection Consultants 1199 S Main St #101, Centerville, UT 84012

(801) 295-6070

(801) 232-2217 greg@pciut.com

Q: Specification Section 081113-1, paragraph 2.3.A and 2.3.A.2.A state: “As indicated in the Door and

Frame Schedule.” Will you provide a door and hardware schedule?

A: No, the door information is included in specification 000050 Modular Units, Paragraph K. This amendment will delete the reference to the schedule in the specifications.

Q: Sheet 14 of 17 on the drawings calls for laminate flooring in several rooms. Specifications call for sheet vinyl. What is wanted for those areas indicated to contain laminate flooring?

A: The laminate flooring shall be Allen Roth Kettle Pine Embossed Laminate Wood planks, minimum AC rating of 4 and limited lifetime warranty or approved equal. The specifications are changed in this amendment. Contractor shall submit product for approval as part of the submittal process. Product shall be installed in accordance with manufacturer recommendations.

Q: Is the propane furnace forced air with up flow or down flow?

A: The propane furnace needs to be a forced area with down flow. The distribution ducts shall be located in the crawlspace to eliminate heat in the attic and thus the increase of ice dam problems.

Q: Section 099113 paragraph 3.5 D states, “Wood and fiber cement substrates: including wood trim architectural woodwork fiber siding, soffit, and trim.” Is the intent of the specifications to have factory finished fiber cement (James Hardi Color Plus or approved equal) or is it to be painted on site?

A: It is the intent for the fiber cement siding to come factory finished. It is mentioned in the painting specification as it is very likely that some touch-up will need to occur (nail holes and other items).

mailto:greg@pciut.com

Q: Are gutters needed for the building?

A: No.

Q: Section 081113-2, paragraph 2.4.A, in regards to borrowed lites, states: “Construction: Fully welded.”

Can knockdown or adjustable frames be used since these are the industry standard in modular construction?

A: The project shall be bid as stated in the specification for construction fully welded lites.

Q: Section 262416-1, paragraph 1.1.A.1 call out distribution panelboards and load centers. Where is each to be used?

A: A contractor may choose to install a load center or a distribution panelboard for Panel A on the modular buildings. They shall be of a quality consistent with a Square D, QO or higher quality.

Q: Can the roof pitch be adjusted?

A: No, a 4:12 pitch as indicated in the solicitation documents.

There are some items that the Forest Service is discussing that will be included in a future amendment that will be posted early next week. The items being discussed deal with the following items:

Challis Site

Information will be provided on where the waterline connection to the main needs to occur and how. There are two valve boxes. One being the city water meter box and second being a Forest Service distribution box.

Information may be provided on how the irrigation system will connect into the water system.

Information will be provided on the hydraulic calculations to assist in the fire sprinkler system design.

Amendment 3 Replace Schedule of Items and Notes (5 pages)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

STANLEY SEASONAL HOUSING BUNKHOUSE 2016, SAWTOOTH NRA

ITEM

NO. DESCRIPTION

*METHOD

OF MEAS UNIT QUANTITY

UNIT

PRICE

TOTAL

AMOUNT

Base Bid

000501-1

Modular Barracks Unit

LSQ

LS

$ XXXXX

000501-1

Installation of Integral Colored Concrete Entry Stairs and Pads, and the Accessible Ramp and Railings

010250 Construction Staking

LSQ LSQ LS $ XXXXX

011900 Mobilization

062010 Heavy Timber Stairs

AQ AQ EA 8

101400 Regulatory Signs

AQ AQ EA 1

221100-1 Pipeline, 2" HDPE, 160 PSI with Heat Fusion Joints, Including Trench

AQ LSQ LS $ XXXXX

221300-1 Sewerline - Gravity, 4-Inch PVC, SDR 35, Including Trench and Fittings

AQ LSQ LS $ XXXXX

221300-2 Sewer Cleanout

231126

Exterior Propane Gas System - 500 Gallon Tank and 1-Inch PE Piping to Buildings

260500-1 Electrical Service Lateral

31200-1 Special Bedding - Imported, Government Source

DQ DQ CY 10

31200-2 Pipe Zone - Imported, Government Source

312100

Project Site Preparation and Grading (Excludes All Work within 5' of the Building Roof Line)

DQ LSQ LS $ XXXXX

321204-1 Crushed Aggregate Base Course - Grading "G" (For Pathway)

TOTAL PRICE

$ XXXXX $

CHALLIS SEASONAL HOUSING BUNKHOUSE 2016, SALMON-CHALLIS NF

Item No. Description

*Method Of Meas Unit Quantity

Unit Price

Total Amount

Base Bid (Bunkhouse & Parking Lot)

000050-1

Accessible Modular Bunkhouse Building #1 (1560sf) (includes concrete Foundation)

000050-2

Modular Bunkhouse Building #2 (1560sf) (includes concrete Foundation)

010250 Construction Staking

011900 Mobilization

022210 Demolition of Building

AQ EA 3 $ XXXXX

024102 Removal of Structures and Obstructions

026460 Dumpster Pad (Includes 8' Curb Stop) AQ EA 1 $

033000-1 Concrete Waterway

033000-2 Concrete Sidewalks DQ LF 440 $ $

101400-1 Signs AQ EA 2 $ $

133402-1 Water Service Box AQ EA 5

133402-2 Utility Box with Pressure Reducing Valve AQ EA 1

221100-1

Water Pipeline, 2" HDPE, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding DQ LF 310

221100-2

Water Pipeline, 2" HDPE with Frostshield, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding DQ LF 120

221100-3

Water Pipeline, 2" HDPE with 5" HDPE Sleeve, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding DQ LF 35

221100-4

Water Pipeline, 3" HDPE, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding DQ LF 150

221100-5

Water Pipeline, 3" HDPE with Frostshield, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding DQ LF 300

221100-6 Pumpout Drains AQ EA 6

221102 Curb Valve and Box - 2" Metal AQ EA 6

221300-1 Sewerline - Gravity, 4" PVC, SDR 35, Including Trench DQ LF 570

221300-2 Sewerline - Gravity, 4" PVC with Frostshield, SDR 35, Including Trench DQ LF 95

21300-3

Sewerline - Gravity, 4" PVC with 8" PVC Sleeve, SDR 35, Including Trench DQ LF 75

221300-4 4" Sewer Cleanout AQ EA 8

Item No. Description

*Method Of Meas Unit Quantity

Unit Price

Total Amount

Base Bid (cond.)

260500-1 Electrical Distribution System LSQ LS LS

260500-2 Electrical Feeder Spur (bunkhouse #2) LSQ LS LS

312100 Project Site Preparation and Grading LSQ LS LS $ XXXXX

321204-1 Crushed Aggregate Surface Course - Grading G (For Road and Parking) DQ CY 370 $

321204-2 Crushed Aggregate Surface Course - Grading G (For Trench Road Repair) DQ CY 60

322622 Precast Concrete Curb Stops - 6-Foot AQ EA 32 $

323150 2-Foot High Post and Rail Fencing DQ LF 250 $ $

TOTAL PRICE BASE ITEM

(Bunkhouse & Parking Lot)

Bid Option “A” (Modular Bunkhouse #3)

Item No. Description *Method

Of Meas

Unit Quantity Unit Price Total

000050-3

Bunkhouse Building #3 (1,560sf) (includes concrete Foundation) LSQ LS LS $XXXXX $

260500-3 Electrical Feeder Spur (bunkhouse #3) LSQ LS LS $XXXXX $

TOTAL PRICE (Bid Option “A” Modular Bunkhouse #3)

Bid Option “B” (Modular Bunkhouse #4)

*Method

Of Meas

Unit Quantity Unit Price Total

000050-4 Accessible Bunkhouse Building #4 (1,560sf)

LSQ LS LS $XXXXX $

101400-2 Signs AQ EA 1 $ $

260500-4 Electrical Feeder Spur (bunkhouse #4) LSQ LS LS $XXXXX $

TOTAL PRICE (Bid Option “B” Modular Bunkhouse #4)

Bid Option “C” (Group Site, Horshoes And Fitness Pad)

*Method

Of Meas

Unit Quantity Unit Price Total

033000-3

Concrete Pad (Group Site, 5-inch thick -includes Aggregate Base) DQ LS LS $XXXXXX $

129300-1

Site Furnishings - Bicycle Rack (Includes Concrete Pad and Aggregate Base) AQ EA 4 $

129300-2

Site Furnishings - Wood Plank Picnic Table (Surface Mount) AQ EA 6

129300-3

Site Furnishings - Pedestal Grill (Surface Mount) AQ EA 2 $

129300-4 Site Furnishings - Utility Table (Surface Mount) AQ EA 2 $ $

322101

Horseshoe Pit (Includes Inverted Concrete Mow Strip) AQ EA 2 $

322105

Gravel Pad (For Fitness Structure - Includes Inverted Concrete Mow Strip) AQ EA 1

TOTAL PRICE Bid Option “C” (Group Site, Horshoes And Fitness Pad)

Bid Option “D” (Planting And Irrigation)

Item No. Description *Method

Of Meas

Unit Quantity Unit Price Total

328000 Irrigation System LSQ LS LS $XXXXX $

329204 Hydro-seeding LSQ LS LS $XXXXX $

329212 Inverted Concrete Mow Strip Landscape Edger

DQ LF 180 $

329215

Decorative Rock Mulch Gravel (Includes Fabric Underlayment) DQ CY 20

329310-1 Exterior Plants LSQ LS LS $XXXXX $______________

329310-2 Topsoil (Hydro-seeded lawn areas - 2" Depth) DQ CY 4 $ $

TOTAL PRICE Bid Option “D” (Planting And Irrigation)

GRAND TOTAL PRICE (ALL ITEMS – BASE BID

PLUS BID OPTION ITEM’S A-D - Challis Seasonal

Housing Bunkhouse 2016 Salmon-Challis NF

* Designated Method of Measurement:

LSQ - Lump Sum Quantities; AQ – Actual Quantities; DQ – Design Quantity

Optional Items and Construction Items

The Government will evaluate offers for award purposes by adding the total price offered for any Base Items and Optional Items proposed. Evaluation of Optional Items will be based on whether prices offered are considered fair and reasonable. Evaluation of base and optional items will not obligate the Government to award the items.

Award of optional items will depend on availability of funds at time of award.

Payment for Bond Premiums:

Note 1: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Permits and Responsibilities:

Note 2 : Under clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 799-3491.

Note 3: FAR 52.215-1 Instructions to Offerors -- Competitive Acquisition (Jan 2004) (6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

Note 4: Offerors may choose to bid on ALL items, ONLY complete Stanley Project, or ONLY complete Challis Project which includes all option items.

SCHEDULE OF ITEMS
Payment for Bond Premiums: