Example_TASK_ORDER_FORM.xls
XLS spreadsheet 43 KB Posted
- Attached to
- Boise NF Facilities Maintenance IDIQ Federal contract opportunity
- Solicitation number
- AG-0261-S-12-0031
About this file
This is an example of the form that will be used to prepare an order
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Example Proposal costs.xls | XLS spreadsheet | |
| Building GD ID120010 04-06-2012 ID10.pdf | ||
| Residential ID120004 01-06-2012 ID4.pdf | ||
| Residential ID120003 01-06-2012 ID3.pdf | ||
| StandardSpecs.docx | DOCX document | |
| Building GD ID120002 04-27-2012 ID2.pdf | ||
| SOW Boise NF Maint.pdf | ||
| bnf_map.pdf | ||
| Standard idiq_spec_dwgs.pdf | ||
| AG-0261-S-12-0031.pdf | ||
| MASTER_TASK_ORDER_FORM.xls | XLS spreadsheet | |
| joc_proposal_orig.xls | XLS spreadsheet | |
| Example_idiq_project.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
example
| Job Order Request Form | |||
| Contract #00-0000-0-00000 | |||
| Job Order Number: | EXAMPLE | ||
| Government Request | Contractor's Clarification and Adjustment | ||
| a. | Date of Job Order Request: | a. | Date of Job Order Proposal: |
| Todays Date | |||
| b. | Project Location: | b. | Subcontractor: |
| Elk Creek Ranger Station | |||
| Forest Road 579, approximately 25 miles North of Lowman | |||
| Located in Valley County | |||
| c. | General Description of Work: | c. | General Description of Work: |
| Rehabilitation of one small cabin | |||
| d. | Define Volume of Work | d. | Define Volume of Work: |
| See attached Project Specific Drawings for Details | |||
| See attached Project Proposal Form for basic breakdown of expected work items. | |||
| e. | General Conditions: | e. | General Conditions: |
| Remote site located in Area 3 | |||
| f. | Special Conditions: | f. | Special Conditions: |
| Historic Cabin and site, Forest Service employees work and live on the site. | |||
| g. | Time: | g. | Time: |
| Job Order Time: 90 Days | |||
| Performance Period: 60 Days | |||
| h. | Required Submittals: | h. | Required Submittals: |
| Windows | |||
| Screen door | |||
| Paint | |||
| Log Repairs | |||
| Foundation Repair | |||
| i. | Flat Fee Items: | i. | Flat Fee Items: |
| N/A | |||
| j. | Government Contact: | j. | Name of Site Superintendent: |
| Contracting Officer | |||
| k. | Attachments: | k. | Attachments: |
| Project Specific Drawings | |||
| Project Proposal form with basic breakdown of expected work items. |
fsdefaultUser:
List all Submittals that you want the Contractor to provide.
List the Flat Fees that will be paid with this Job Order:
2.0 Flat Fee Schedule(1)
2.1 Permits and Fees (if required by Job Order) $ Actual Cost
2.2 Operation/Maintenance Manual per Discipline (if required by Job Order) $ Actual Cost List your Name and contact telephone number.
Provide a listing of all attachments such as:
- As-Built Drawings
- Special Product Specifications
- Special requirements Identify all special conditions such as:
- If the building will be occupied.
- Restrictive work hours
- Water, power, and telephone access
- Toilet facilities
- Traffic requirements
- Storage requirements Identify conditions or requirements regarding the identified work.
Define the Volume of Work in general terms such as:
- Sq. Ft.
- Actual quantity of items
- Lineal feet Provide a General Description of the Work. It is not necessary to be technical. Provide sufficient narrative for the Contractor to understand what it is that you desire them to do.
Identify the Project Location in sufficient detail that the Contractor can locate the site without assistance.
Provide your District # - FY - followed by a sequential number (1, 2, 3, etc.)
Insert todays Date.
Identify how long you feel that it should take the Contractor to perform the Work - lets say 90 days (Performance Time).
Also Identify how long until you want the Work to be fully accomplished - lets say 120 days (Job Order Time) The Forest Service fills out the left side of this form.
The Contractor will fill out the right side of this form.
This form and a Request for Contract Action (RCA) are the only forms that the District will need to fill out in order to request work under the Job Order Contract. After filling out the left portion of this form send it to the appropriate C.O.R via Lotus Notes:
File details come from the government source that posted it. Updated .