Example_idiq_project.pdf
PDF 2 MB Posted
- Attached to
- Boise NF Facilities Maintenance IDIQ Federal contract opportunity
- Solicitation number
- AG-0261-S-12-0031
About this file
Example Project requiring propasal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Example Proposal costs.xls | XLS spreadsheet | |
| Example_TASK_ORDER_FORM.xls | XLS spreadsheet | |
| Residential ID120003 01-06-2012 ID3.pdf | ||
| AG-0261-S-12-0031.pdf | ||
| MASTER_TASK_ORDER_FORM.xls | XLS spreadsheet | |
| joc_proposal_orig.xls | XLS spreadsheet | |
| Building GD ID120010 04-06-2012 ID10.pdf | ||
| Residential ID120004 01-06-2012 ID4.pdf | ||
| StandardSpecs.docx | DOCX document | |
| Building GD ID120002 04-27-2012 ID2.pdf | ||
| SOW Boise NF Maint.pdf | ||
| bnf_map.pdf | ||
| Standard idiq_spec_dwgs.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
Sheet Name Page
Title Sheet
PROJECT DESCRIPTION AND BUILDING PICTURES
#1109 DWELLING EXISTING LAYOUT
#1109 DWELLING PROPOSED WORK
#1109 DWELLING PROPOSED WORK CONTINUED
SPECIFICATION:
SEE PROJECT SPECIFICATIONS
UNITED STATES
CANADA
NEVADA UTAH
IDAHO KEY MAP
BOISE NATIONAL FOREST
YELLOWSTONE
NATIONAL PARK
IDAHO FALLS
POCATELLO
AMERICAN FALLS
RESERVOIR
TWIN FALLS
MOUNTAIN
HOME
MOSCOW
LEWISTON
COEUR D' ALEN
PEND
ORIELLE
LAKE
84 15
BOISE
APPROVED:
APPROVED:
DATE:
DATE:
FOREST ENGINEER
DISTRICT RANGER
PROJECT DESCRIPTION
The project shall consist of the replacement of cedar shingle roof, 4 windows, 1 screen door, 1 shower stall, log patching and splicing, mitigation of foundation settlement and work associated with completing these items.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 4
PLANS FOR PROPOSED PROJECT
IDAHO
VALLEY COUNTY
LOWMAN RANGER DISTRICT
BOISE NATIONAL FOREST
BUILDING #1109 REHABILITATION
ELK CREEK RANGER STATION
EXAMPLE
#1109 CABIN #3
FRONT VIEW
PROJECT DESCRIPTION AND NOTES:
THIS PROJECT SHALL CONSIST OF REHABILITATION OF HISTORIC BUILDINGS AT THE ELK CREEK
RANGER STATION. THE WORK INCLUDES BUT IS NOT LIMITED TO LOG REPAIRS AND SPLICES,
WINDOW REPLACEMENTS, REMOVING EXISTING AND INSTALLING NEW CEDAR SHINGLE ROOFS,
STRUCTURE STABILIZATION, SHOWER STALL REPLACEMENT, AND SCREEN DOOR INSTALLATIONS.
ELK CREEK IS LOCATED ON FOREST ROAD (FR) 579. THE SITE IS APPROXIMATELY 25 MILES NORTH OF
THE CITY OF LOWMAN.
CONTRACTOR SHALL COVER AREAS OF THE BUILDINGS NOT COMPLETED TO PREVENT DAMAGE TO
THE EXISTING STRUCTURE DURING INCLEMENT WEATHER OR WHEN THE CONTRACTOR IS NOT AT
THE SITE.
CONTRACTOR IS TO DISPOSE OF WASTE GENERATED DURING THE PROJECT OFF FOREST SERVICE
LAND. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL CLEANUP OF THE SITE UPON
PROJECT COMPLETION.
#1109 CABIN #3
REAR VIEW
#1109 CABIN #3
EAST VIEW
A P
P R
O V
E D
A T
E
C H
E C
K
B Y
C H
E C
K
B Y
OF
D R
A W
IN
G
D E
S
IG
N
M
W
IL
L
IS
M
W
IL
L
IS
F O
R E
S T
E N
G
IN
E E
R
DIMENSION NOTES:
ALL DIMENSIONS SHOWN ARE APPROXIMATE.
CONTRACTOR RESPONSIBLE FOR FINAL
MEASUREMENTS.
APPROXIMATE ROOF AREA 850SF
#1109 DWELLING EXISTING
NTS
EXISTING DOORS:
I: 2'- 8"X 6'- 8" 8'
6.5'
*APPROXIMATE
ROOF DIMENSIONS
8'
*25'
*14'
EXISTING WINDOWS:
I: L 3'- 0"X H 2'- 8"
II: L 5'- 11"X H 3'- 4"
III: L 5'- 11"X H 3'- 4"
IV: L 3'- 0"X H 2'- 2"
WINDOW II
22'
18'8'3"
6'
WINDOW IV
WINDOW III
DOOR I
WINDOW I
SHOWER STALL
A P
P R
O V
E
E C
K
B Y
C H
E C
K
B Y
OF
D R
A W
IN
G
D E
S
IG
N
M
W
IL
L
IS
M
W
IL
L
IS
F O
R E
S T
E N
G
IN
E E
#1109 DWELLING PROPOSED WORK
NTS
WINDOW II
22'
18'8'3"
6'
WINDOW IV
WINDOW III
DOOR I
WINDOW I
PROJECT NOTES FOR BUILDING #1109:
1. SEE STANDARD SPECIFICATION 099001 FOR PAINT AND SURFACE FINISH COLORS.
TOUCH UP SURFACES AS REQUIRED AFTER COMPLETION OF OTHER WORK.
2. FLOOR PLAN AND ROOM ELEVATIONS PROVIDED FOR REFERENCE ONLY.
CONTRACTOR RESPONSIBLE FOR VERIFYING ALL DIMENSIONS, QUANTITIES, AND
MATERIALS.
3. REPLACE ALL WINDOWS WITH NEW SINGLE PANE DIVIDED LIGHT WOOD
WINDOWS. REPLACE SCREEN DOOR WITH NEW WOOD SCREEN DOOR. SEE
STANDARD DRAWING SHEETS 2-3 FOR ADDITIONAL DETAILS. REPLACE WINDOWS
WITH THE FOLLOWING TYPES:
4. ALL INTERIOR WINDOW, TRIM FEATURES ARE TO BE REPLACED WITH 1" X 4"
CLEAR DOUGLASS FIR WITH 1
4" CHAMFERED EDGE DETAILS. ALL TRIM FEATURES
TO BE STAINED AND VARNISHED TO COMPLIMENT FLOOR FINISHES. PROVIDE
SAMPLES TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.
5. REMOVE EXISTING SHOWER STALL. INSTALL NEW SHOWER AND ASSOCIATED
PLUMBING AS NEEDED. PROVIDE AND INSTALL THE FOLLOWING PLUMBING
FIXTURES OR APPROVED EQUALS:
AQUATIC MODEL #13623P REMODELINE SECTIONALS SHOWER
DELTA MODEL 3T14278-LHP H777 LELAND MONITOR SHOWER FAUCET
6. REPLACE ROOF ON ENTIRE STRUCTURE. SEE STANDARD DETAILS SHEET 4 OF 8
FOR ROOF INSTALLATION STYLE. REPLACE ALL FASCIA TRIM WITH NEW PAINTED
PINE FASCIA OF THE SAME DIMENSIONS AS ORIGINAL. SEE SHEET 3 FOR
APPROXIMATE ROOF DIMENSIONS.
DESIGNATED
WINDOW
WINDOW REPLACEMENT STYLE
(SEE STANDARD SHEET 3)
I STYLE D
II STYLE A
III STYLE A
IV STYLE F
DESIGNATED
DOOR
DOOR REPLACEMENT STYLE
(SEE STANDARD SHEET 2)
I STYLE 2D
SHOWER STALL
A P
P R
O V
E
E C
K
B Y
C H
E C
K
B Y
OF
D R
A W
IN
G
D E
S
IG
N
M
W
IL
L
IS
M
W
IL
L
IS
F O
R E
S T
E N
G
IN
E E
#1109 CABIN #3
REAR VIEW
#1109 CABIN #3
EAST VIEW
REMOVE PIECES OF LOG SIDING AND SPLICE NEW
SECTIONS OF LOG INTO EXISTING STRUCTURE TO
PATCH AREA BELOW WINDOWS II AND III. PATCH
CHINKING AND DAUBING (SEE NOTES BELOW FOR
DETAILS), AND STAIN TO MATCH. PICTURE
REPRESENTATIVE OF BOTH WINDOW LOCATIONS.
REPLACE ROTTED WINDOW
SILLS AS REQUIRED,
TYPICAL OF ALL WINDOWS
PROJECT NOTES FOR EXTERIOR OF BUILDING:
1. EXTERIOR ELEVATIONS PROVIDED FOR REFERENCE ONLY. CONTRACTOR RESPONSIBLE FOR VERIFYING ALL
DIMENSIONS, QUANTITIES, AND MATERIALS.
2. SEE SPECIFICATION 099001 FOR PAINT AND SURFACE FINISH COLORS. CLEAN AND REPAINT ALL EXTERIOR TRIM
(WHITE). NO PRESSURE WASHING OF EXTERIOR SURFACES. CLEAN EXTERIOR SURFACES WITH TRI-SODIUM
PHOSPHATE (TSP), ALLOW ALL SURFACES TO COMPLETELY DRY PRIOR TO APPLYING FINISHES. REMOVE ALL
LOOSE CHIPPED, AND SCALING PAINT FROM THE TRIM. APPLY ONE COAT OF PREMIUM EXTERIOR ALKYD BASED
PRIMER AND TWO COATS OF PREMIUM EXTERIOR LATEX SATIN FINISH PAINT.
3. PATCH OR SPLICE WITH APPROPRIATE WOOD SPECIES AND EPOXY AS NEEDED. TOUCH UP WITH PAINT AS
REQUIRED
4. WHERE REQUIRED, REPLACE DAUBING AND CHINKING THAT HAS DETERIORATED, ESTIMATED QUANTITY IS 30
SQUARE FEET. THE FOLLOWING IS A PROPOSED MIX DESIGN FOR THE DAUBING, MIX MAY NEED TO BE MODIFIED
FOR THE SITE.
6 PARTS FINE SAND, SIFTING THROUGH A #16 SIEVE SIZE OF COMMERCIALLY AVAILABLE MASON OR
PLASTER SAND IS RECOMMENDED TO PROVIDE CONSISTENT SIZE SAND
2 PARTS LIME (MAY NEED TO INCREASE DEPENDING ON LOG CONDITION)
2 PARTS PORTLAND CEMENT
3 PARTS WATER
COVER THE DAUBING WITH SHEET PLASTIC DURING CURING AND OCCASIONALLY MISTED WITH
WATER WHILE CURING TO REDUCE CRACKING.
PROJECT NOTES FOR EXTERIORS BUILDING (CONT.):
5. THE FOUNDATION OF THE BUILDING ADDITION HAS SETTLED. TO MITIGATE
SETTLING:
A) CONTRACTOR TO JACK ADDITION ON NORTH FACE AND INSTALL PRESSURE
TREATED SHIM BETWEEN FOUNDATION AND STRUCTURE. FINAL THICKNESS
OF SHIM TO BE DETERMINED ON THE SITE AND WILL BE RELATED TO THE
SEPARATION APPARENT BETWEEN TOP OF THE ADDITION AND THE MAIN
STRUCTURE.
B) INSTALL STEEL TIES BETWEEN TWO STRUCTURES AT THE ROOF AND WALL
CONNECTION POINT TO ADD ADDITIONAL SUPPORT, CONCEAL TIES OR
PAINT TO MATCH IF NECESSARY, SUBMIT PROPOSED TIE CONFIGURATION
TO COR FOR APPROVAL.
REPAIR BUILDING SETTLING AND CLOSE
SEPARATION AT TOP OF BATHROOM ADDITION,
SEE NOTE 5 FOR DETAILS
#1109 DWELLING PROPOSED WORK (CONTINUED)
NTS
CLEAN AND REPAINT ALL
EXTERIOR TRIM FEATURES
A P
P R
O V
E
E C
K
B Y
C H
E C
K
B Y
OF
D R
A W
IN
G
D E
S
IG
N R
B
B
A R
R Y
M
W
IL
L
IS
R
B
B A
R R
Y
M
W
IL
L
IS
F O
R E
S T
E N
G
IN
E E
File details come from the government source that posted it. Updated .