StandardSpecs.docx

DOCX document 246 KB Posted

Attached to
Boise NF Facilities Maintenance IDIQ Federal contract opportunity
Solicitation number
AG-0261-S-12-0031
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Boise NF Facilities Maintenance IDIQ, newest first.
File Type Posted
Example Proposal costs.xls XLS spreadsheet
Example_TASK_ORDER_FORM.xls XLS spreadsheet
Building GD ID120010 04-06-2012 ID10.pdf PDF
Residential ID120004 01-06-2012 ID4.pdf PDF
AG-0261-S-12-0031.pdf PDF
MASTER_TASK_ORDER_FORM.xls XLS spreadsheet
joc_proposal_orig.xls XLS spreadsheet
Example_idiq_project.pdf PDF
Residential ID120003 01-06-2012 ID3.pdf PDF
Building GD ID120002 04-27-2012 ID2.pdf PDF
SOW Boise NF Maint.pdf PDF
bnf_map.pdf PDF
Standard idiq_spec_dwgs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Important Information (this text is hidden):

1- Tracking changes – Microsoft Word has problems merging document in which track changes is turned on or where it has been on and the changes have not all been accepted. Before merging any documents make sure track changes is off and all changes have been accepted.

a. Ctrl+shift+E toggles “Track Changes” also you can toggle them through the menu pulldown “Tools – Track Changes”. When you toggle them the “Reviewing” toolbar is activated and which allows you to see and accept or reject changes.

2- When creating or editing specs, do not type notes or comments in or before the “PART-1 `GENERAL” line. These may cause problems in specs reading in correctly.

a. Do not worry about those written by Masterspec. We know how to ignore them.

b. You can write all you want throughout the rest of the Spec, including loading up the end of the spec if you would like.

3- Contracting:

a. We try to save this first sheet for whatever contracting would like to add.

b. The header is also left blank for contracting. Edit the header anywhere and it will affect the header throughout this document. The footer is ours.

4- Section C and other non-specs must be added manually (see 3.a above).

5- Adding specs requires updating the list of specs, this may be done automatically through the “Specs” toolbar “TableOfContents” and “Update TOC” Buttons.

6- Be consistent when creating specs. Using different formatting within a single spec causes confusion for Microsoft Word and it will mess up your formatting.

7- This is created using 12 point font. Reading in specs of other font sizes will create minor font inconsistencies. You can change the font size upon completion of the spec package manually to whatever size you want for consistency sake.

8- Other Regions can use this; it is a minor programming change to correct R4 to something else. Send a request and a faxed picture of a large Hawaiian pizza to me and I will get right on it.

SPECIFICATIONS

The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

SECTION 000500 - BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 013510 - SPECIAL PROCEDURES FOR HISTORIC TREATMENT

SECTION 014100 - QUALITY CONTROL

SECTION 017320 - SELECTIVE DEMOLITION

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033020 - CONCRETE FROM PACKAGED DRY MIX FOR MINOR STRUCTURES

SECTION 048100 - UNIT MASONRY ASSEMBLIES

SECTION 061600 - SHEATHING

SECTION 062013 - EXTERIOR FINISH CARPENTRY

SECTION 064020 - INTERIOR ARCHITECTURAL WOODWORK

SECTION 072100 - THERMAL INSULATION

SECTION 076200 - SHEET METAL FLASHING AND TRIM

SECTION 092900 - GYPSUM BOARD

SECTION 096400 - WOOD FLOORING

SECTION 096510 – LINOLEUM FLOOR SHEETING

SECTION 099001 - COLORS

SECTION 099123 - PAINTS AND COATINGS

SECTION 099920 - PAINTING SUBSTRATE RESTORATION

SECTION 231123 - FACILITY LIQUEFIED-PETROLEUM GAS PIPING

SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 311000 - CLEARING AND GRUBBING

SECTION 321204 - CRUSHED AGGREGATE BASE OR SURFACE COURSE

SECTION 323150 - POST AND POLE FENCE

USDA FOREST SERVICE, R-4

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 000500 - BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

GENERAL

SUMMARY

This Section includes the following:

Work covered by this bid item.

Use of premises.

Work restrictions.

Specification formats and conventions.

WORK COVERED BY CONTRACT DOCUMENTS

Project Identification: BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS.

Project Location: The project sites are located at various locations within the Boise National Forest as identified on each individual job order request.

Owner: USDA Forest Service ContractinRetain paragraph below only if Contractor is selected by negotiation and subcontracts In paragraph and first subparagraph below, include an abbreviated summary of the Work for Project described above. See Evaluations.

The Work consists of the following:

The Work includes:

The project shall consist of general maintenance and small construction projects as identified by individual job order requests. The work may include but is not limited to minor structural repairs, minor concrete work, window and door replacements or repairs, trim replacement, chimney upgrades, propane upgrades, flooring replacements, cabinet replacements, cleaning, repairing, and staining building exteriors, painting, removing existing and installing new cedar shingle roofs, accessibility upgrades, fencing and landscape rehabilitation, and pathway and parking area construction or rehabilitation.

Delete subparagraph below if not required.

Copy and re-edit first subparagraph below for each phase required. Repeat subparagraph, revised as appropriate, for each separate phase. See Evaluations for model text.

USE OF PREMISES

Retain one of two paragraphs below. Retain first paragraph if Project is on a vacant site or in an unoccupied building being renovated and there are no Owner-occupancy requirements. Retain second if Owner will occupy portions of an existing site or building. Revise to suit Project.

General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government’s right to perform work or to retain other contractors on portions of Project.

Retain paragraph and subparagraphs below if Project site will be accessible to other parties or if parts of a building being renovated will be occupied during construction. Revise to suit Project. See Evaluations for model text.

Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

Driveways and Entrances: Follow the requirements noted in Section C.

Insert additional paragraphs to specify restrictions on Contractor's use of premises or to specify limitations because of Owner occupancy.

MEASUREMENT AND PAYMENT:

Measurement and payment will be as listed in the Schedule of Items. Payment will include all items of work required to complete the Site and Buildings ready for use and complete.

PRODUCTS (NOT USED)

EXECUTION (NOT USED)

END OF SECTION 000500

JULY 2009

GENERAL SITE REHABILITATION 000500-2

USDA FOREST SERVICE, R-4

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 011250 - MEASUREMENT AND PAYMENT

1. GENERAL

SUMMARY

Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

DETERMINATION OF QUANTITIES

The following measurements and calculations shall be used to determine contract quantities for payment.

For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

UNITS OF MEASUREMENT

Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

Acre: Make longitudinal and transverse measurements for area computations horizontally.

50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

Cubic Yard (CY): A measurement computed by one of the following methods:

Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

Each (EA): One complete unit, which may consist of one or more parts.

Gallons (GAL): The quantity shall be measured by any of the following methods:

Measured volume in container.

Metered volume by approved metering system.

Commercially package volume.

Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

Lump Sum (LS): One complete unit.

Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

Square Foot (SF): Measured on a plane parallel to the surface being measured.

Square Yard (SY): Measured on a plane parallel to the surface being measured.

Ton: Measured as a short ton consisting of 2,000 pounds.

METHOD OF MEASUREMENT

One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

As a result of changes in the work authorized by the CO.

As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PRODUCTS (NOT APPLICABLE)

EXECUTION (NOT APPLICABLE)

REVISION HISTORY:

PRIMARY AUTHOR: ???

5/11/2006 D. WEWER – Added 50# Bags to list of units.

END OF SECTION 011250

MAY 2009

MEASUREMENT AND PAYMENT 011250-1

USDA FOREST SERVICE, R-4

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 013300 - SUBMITTAL PROCEDURES

1. GENERAL

SUMMARY

This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 01330-1 for a summary of required submittals.

See other specification section within this package for additional requirements on submittal.

SUBMITTAL PROCEDURES

Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

If intermediate submittal is necessary, process it in same manner as initial submittal.

Allow 14 days for processing each re-submittal.

No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

Identification: Place a permanent label or title block on each submittal for identification.

Indicate name of firm or entity that prepared each submittal on label or title block.

Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

Include the following information on label for processing and recording action taken:

Project name.

Date.

Name and address of Contractor.

Name of manufacturer.

Unique identifier, including revision number.

Number and title of appropriate Specification Section.

Drawing number and detail references, as appropriate.

If more than one item is shown on submittal sheet, identify item.

Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

MEASUREMENT AND PAYMENT

No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PRODUCTS

ACTION SUBMITTALS – (Submittals requiring CO approval) General: Prepare and submit Action Submittals required by individual Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

Mark each copy of each submittal to show which products and options are applicable.

Include the following information, as applicable:

Manufacturer's written recommendations.

Manufacturer's product specifications.

Manufacturer's installation instructions.

Manufacturer's catalog cuts.

Wiring diagrams showing factory-installed wiring.

Compliance with recognized trade association standards.

Compliance with recognized testing agency standards.

Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

Preparation: Include the following information, as applicable:

Dimensions.

Identification of products.

Fabrication and installation drawings.

Roughing-in and setting diagrams.

Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

Notation of dimensions established by field measurement.

Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

Samples: Prepare physical units of materials or products, including the following:

Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval) General: Prepare and submit Informational Submittals required by other Specification Sections.

Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

EXECUTION

GENERAL

Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

Submittals not required by the Contract Documents will not be reviewed and may be discarded.

Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

Requests for substitutions will only be considered if contractor submits the following:

Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications.

END OF SECTION 01330

MARCH 2009

SUBMITTAL PROCEDURES 013300-4

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 013510 - SPECIAL PROCEDURES FOR HISTORIC TREATMENT

1. GENERAL

1.1SUMMARY
A.This Section includes special procedures for historic treatment for sites identified as Listed or Eligible for listing on the National Historic Register, including, but not limited to, the following:
1.Temporary protection of historic materials during construction.
2.Historic treatment procedures.
1.2DEFINITIONS
A."Repair": To stabilize, consolidate, or conserve; to retain existing materials and features while employing as little new material as possible. Repair includes patching, piecing-in, splicing, consolidating, or otherwise reinforcing or upgrading materials. Within restoration, repair also includes limited replacement in kind; rehabilitation, and reconstruction, with compatible substitute materials for deteriorated or missing parts of features when there are surviving prototypes.
B."Replace": To duplicate and replace entire features with new material in kind. Replacement includes the following conditions:
1.Replacement with New Materials: Includes replacement with new material when original material is not available as patterns for creating new duplicated elements.
C."Remove": To detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.
D."Existing to Remain" or "Retain": Existing items of construction that are not to be removed and that are not otherwise indicated to be removed and salvaged, or removed and reinstalled.
E."Material in Kind": Material that matches existing materials, as much as possible, in species, cut, color, grain, and finish.
1.3STORAGE AND PROTECTION OF HISTORIC MATERIALS
A.If it is necessary to remove roof trim or components during construction to replace shingles follow the description here:
1.Clean and repair historic items to functional condition adequate for intended reuse.
2.Pack or crate items after cleaning and repairing. Identify contents of containers.
3.Protect items from damage during storage.
4.Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
B.Existing Historic Materials to Remain: Protect construction indicated to remain against damage and soiling during construction. When permitted by the Contracting Officer’s Representative items may be removed to a suitable, protected storage location during historic treatment and cleaned and reinstalled in their original locations after historic treatment operations are complete.
C.Storage and Protection: When removed from their existing location, store historic materials within a weather tight enclosure where they are protected from wetting by rain, snow, or ground water, and temperature variations. Secure stored materials to protect from theft.
1.Identify removed items with an inconspicuous mark indicating their original location.
1.4PROJECT-SITE CONDITIONS
A.Exterior Repairing:
1.Proceed with the work only when forecasted weather conditions are favorable.
a.Wet Weather: Do not attempt repairs during rainy or foggy weather. Do not apply primer, paint, putty, or epoxy when the relative humidity is above 80 percent. Do not remove exterior elements of structures when rain is forecast or in progress.
b.Do not perform exterior wet work when the air temperature is below 40 deg F.
c.Do not begin cleaning, patching, or repairing when there is any likelihood of frost or freezing.
d.Do not begin paint removal when either the air or the surface temperature is below 45 deg F unless approved means are provided for maintaining a 45 deg F temperature of the air and materials during, and for 48 hours subsequent to cleaning.
1.5MEASUREMENT AND PAYMENT
A.No separate measurement and/or payment will be made for this Section. Payment for this work shall be included in items listed in the Schedule of Items.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1PROTECTION, GENERAL
A.Comply with manufacturer's written instructions for precautions and effects of products and procedures on adjacent building materials, components, and vegetation.
B.Temporary Protection of Historic Materials during Construction:
1.Protect existing materials during installation of temporary protections and construction. Do not deface or remove existing materials.
2.Attachments of temporary protection to existing construction shall be approved by COR prior to installation.
C.Protect landscape work adjacent to or within work areas as follows:
1.Provide barriers to protect tree trunks.
2.Bind spreading shrubs.
3.Use coverings that allow plants to breathe and remove coverings at the end of each day. Do not cover plant material with a waterproof membrane for more than 8 hours at a time.
4.Set scaffolding and ladder legs away from plants.

END OF SECTION 013510

JANUARY 2010

SPECIAL PROCEDURES FOR HISTORIC TREATMENT 013510-3

USDA FOREST SERVICE, R-4

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 014100 - QUALITY CONTROL

1. GENERAL

0.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

0.2 QUALITY CONTROL

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required substantiating that all services, supplies, and construction conform to the contract requirements.

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:

1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

2. Testing agency will re-test and re-inspect corrected work.

C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

0.3 SUBMITTALS

A. Contractor Quality Control Plan B. Permits, Licenses, and Certificates C. Test and Inspection Reports D. As-Built Drawings

0.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 1 - PRODUCTS (Not Applicable)

PART 2 - EXECUTION

2.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

2.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

2.3 TEST AND INSPECTION REPORTS

A. Submit three copies of complete test results no later than three calendar days after the test was performed.

B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

C. Testing and Inspection Reports shall include the following:

SPEC WRITER: REVISE LIST BELOW TO SUIT PROJECT.

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples, tests, or inspections.

5. Names of individuals performing tests and inspections.

6. Reference Specification Section(s).

7. Complete test or inspection data.

8. Test and inspection results and an interpretation of test results.

9. Ambient conditions at time sample was taken, tested, or inspected.

10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

11. Name and signature of laboratory inspector.

12. Recommendations on retesting and reinspecting.

2.4 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

2.5 AS-BUILT DRAWINGS

A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.

2.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS

EDIT table below for each project. COORDINATE table references with edited specification sections.

A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification.

END OF SECTION 014100

APRIL 2009

QUALITY CONTROL 014100-6

USDA FOREST SERVICE, R-4

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 020940- WORK INVOLVING LEAD-BASED PAINT (LBP)

PART 1 - GENERAL

1.1 DESCRIPTION OF WORK:

Work under this section includes those engineering controls which are necessary for demolition/removal of materials that are coated with lead based paint (LBP). This is a notification that the work under this contract will bring the Contractor into contact with LBP materials that will require worker protection. Existing BUILDING surfaces may be coated with lead based paint.

1.2 NOTICE OF POSSIBLE HAZARD:

A. The Government has determined that work under this contract involves exposure to lead-based paint (LBP) dust and materials. The paint has been analyzed, and is between 3.9%-9.6% lead.

B. Exposure to airborne lead contaminants is a recognized hazard to human health. The Contractor shall assume that all painted surfaces on the building on which work is required are coated with LBP.

1. 3 SUBMITTALS:

A. Health and Safety Plan:

1. The Contractor shall provide a Health and Safety Plan for review and acceptance by the Contracting Officer. No work will commence until acceptance of the plan by the Contracting Officer.

2. The Health and Safety Plan will address, but not be limited to, the health-related standards and protective measures proposed to be utilized by the Contractor during work involving exposure to airborne lead contaminants.

3. The Health and Safety Plan will also identify the engineering and work practice controls proposed to be implemented by the Contractor. Such controls will be identified to assure the Government that there will be no release to the environment of lead contamination for which liability may be imposed on the Government.

1.4 WORKER PROTECTION:

OSHA requirements for worker protection shall be followed in accordance with 29 CFR 1926.62, Lead Exposure in Construction. The Contractor shall provide documentation attending an OSHA Lead in Construction 29 CFR 1926.62 training.

1.5 WASTE ANALYSIS AND MANAGEMENT:

A. This project is being conducted at a residential site. The wastes generated as part of this project’s LBP activities are considered household waste, and such wastes thus are excluded from RCRA’s hazardous waste management and disposal regulations.

B. The Contractor shall segregate dust and small debris which may contain lead-based paint. Such waste shall be double bagged and secured with tape.

C. Paint debris shall not be placed on unprotected ground and shall be shielded adequately to prevent dispersion by wind or rainwater.

D. Larger hazardous waste items which cannot be bagged shall be wrapped in plastic, secured with tape, labeled, and set aside for Government approval of disposal method.

E. Properly wrapped, secured, and labeled hazardous waste will be place in containers provided by the Contractor.

F. Contractor shall dispose of LBP waste in accordance with State solid waste regulations

1.6MEASUREMENT AND PAYMENT
A.No separate measurement and/or payment will be made for this Section. Payment for this work shall be included in items listed in the Schedule of Items.

PART 2 - PRODUCTS

2.1 MATERIALS:

A. Disposal bags and sheeting: Provide 6 mil thick plastic disposal bags and sheeting for wrapping hazardous waste.

B. Disposal bins: Provide disposal bins for collection of waste prior to disposal by Contractor. All bins shall be secured when not in use to prevent deposit of unauthorized waste and debris.

C. Trisodium phosphate: Industry standard to mix with water for washing solutions on site.

PART 3 - EXECUTION

3.1 SITE PREPARATION:

A. The Contractor shall prepare the site in accordance with the Health and Safety Plan accepted by the Contracting Officer.

B. The Contractor is responsible for establishing and maintaining control measures sufficient to preclude any adverse affects to workers, Forest Service personnel and dependents, the public, and the environment.

3.2 REPAIR

A. The Contractor shall conduct all repair work in accordance with the Health and Safety Plan accepted by the Contracting Officer.

B. All waste will be handled in accordance with the provisions of this Section 013510 and the directions of the Contracting Officer.

3.3 CLEANUP:

A. Daily cleanup shall be in accordance with the Health and Safety Plan accepted by the Contracting Officer. Any environmental cleanup caused by Contractor's failure to comply with the provisions of law, of this contract, or the accepted Health and Safety Plan shall be at Contractor's sole expense.

B. Do not allow any paint debris to enter industrial waste, storm drain or sanitary sewer lines.

3.4 INSPECTION:

Contractor shall cooperate and coordinate all work with the Contracting Officer's inspection requirements. Inspection will center on compliance with the Health and Safety Plan accepted by the Contracting Officer.

3.5 CLEARANCE:

A. Contractor shall notify Contracting Officer of readiness for final inspection.

B. The visual inspection will occur no earlier than 24 hours after completion of the entire construction work.

C. Any visible debris will result in the Contractor recleaning the area at no additional cost to the Government.

END OF SECTION

JANUARY 2010

BOISE NATIONAL FOREST STANDARD FACILITIES SPECIFICATIONS

SECTION 017320 - SELECTIVE DEMOLITION

1. GENERAL

SUMMARY

This Section includes demolition and removal of the following:

SPEC WRITER: ADJUST LIST BELOW TO SUIT PROJECT.

Selected portions of a building or structure.

Repair procedures for selective demolition operations.

DEFINITIONS

Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

Remove and Salvage: Detach items from existing construction and deliver them to Government.

Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.

Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

MATERIALS OWNERSHIP

Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.

QUALITY ASSURANCE

Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.

Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

Standards: Comply with ANSI A10.6 and NFPA 241.

PROJECT CONDITIONS

Government assumes no responsibility for condition of areas to be selectively demolished.

Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.

SPEC WRITER: RETAIN PARAGRAPH AND SUBPARAGRAPHS ABOVE AND DELETE FIRST PARAGRAPH AND SUBPARAGRAPHS BELOW IF ASBESTOS IS PRESENT AND GOVERNMENT HAS A SEPARATE CONTRACT TO ABATE ASBESTOS BEFORE SELECTIVE DEMOLITION BEGINS.

SPEC WRITER: DELETE SUBPARAGRAPH BELOW IF NO MATERIALS ARE KNOWN TO BE PRESENT OR IF GOVERNMENT DOES NOT HAVE, OR WILL NOT PROVIDE, MATERIAL SAFETY DATA SHEETS FOR THESE MATERIALS.

Storage or sale of removed items or materials on-site will not be permitted.

MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this Section. Payment for this work shall be included in items listed in the Schedule of Items.

PRODUCTS

REPAIR MATERIALS

Use repair materials identical to existing materials.

If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.

Use materials whose installed performance equals or surpasses that of existing materials.

EXECUTION

EXAMINATION

Verify that utilities have been disconnected and capped.

Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.

When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to CO.

UTILITY SERVICES

Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.

SPEC WRITER: RETAIN ONE OF TWO "UTILITY REQUIREMENTS" PARAGRAPHS AND ASSOCIATED SUBPARAGRAPHS BELOW, IF APPLICABLE.

Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utilities serving areas to be selectively demolished.

Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.

PREPARATION

Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.

Protect existing site improvements, appurtenances, and landscaping to remain.

Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

POLLUTION CONTROLS

Dust Control: Use water mist, temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.

Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demolition enclosure. Vacuum carpeted areas.

Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

SELECTIVE DEMOLITION

General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.

Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

Removed and Salvaged Items:

Clean salvaged items.

Pack or crate items after cleaning. Identify contents of containers.

Store items in a secure area until delivery to Government.

Removed and Reinstalled Items:

Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.

Pack or crate items after cleaning and repairing. Identify contents of containers.

Protect items from damage during transport and storage.

Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition [and cleaned] and reinstalled in their original locations after selective demolition operations are complete.

PATCHING AND REPAIRS

General: Promptly repair damage to adjacent construction caused by selective demolition operations.

Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.

Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.

Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.

Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

Ceilings: Patch, repair, or rehang existing ceilings as necessary to provide an even-plane surface of uniform appearance.

DISPOSAL OF DEMOLISHED MATERIALS

General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

Burning: Do not burn demolished materials.

Disposal: Transport demolished materials off Government property and legally disposes of them.

END OF SECTION 017320

February 2010

SELECTIVE DEMOLITION 017320-4

USDA FOREST SERVICE, R-4

GARDEN VALLEY KITCHEN SIDING REPLACEMENT

SECTION 033000 - CAST-IN-PLACE CONCRETE

1. GENERAL

SUMMARY

This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

DEFINITIONS

Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.

SUBMITTALS

Product Data: For each type of product indicated.

Design Mixtures: For each concrete mixture. Indicate amounts of mixing water to be withheld for later addition at Project site.

Field quality-control test reports.

MEASUREMENT AND PAYMENT

Unless otherwise noted herein, there will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.

PRODUCTS

FORM-FACING MATERIALS

Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

Plywood, metal, or other approved panel materials.

Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:

Structural 1, B-B or better; mill oiled and edge sealed.

B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed.

Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.

Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class. Provide units with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.

Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.

Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

Delete or revise three subparagraphs below to suit Project.

Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.

Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.

STEEL REINFORCEMENT

Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.

Plain-Steel Wire: ASTM A 82, as drawn.

Deformed-Steel Wire: ASTM A 496.

REINFORCEMENT ACCESSORIES

Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs.

Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.

CONCRETE MATERIALS

Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

Select type and color of portland cement from options in subparagraph below.

Portland Cement: ASTM C 150, Type II.

Select class of aggregate from options in paragraph below or revise to suit Project.

This is the start of the file's text. The full file is on GovTribe.