This example goes with the example project. it is to be used to quote the example project.

View the file

Other files for this federal contract opportunity

Other files attached to Boise NF Facilities Maintenance IDIQ, newest first.
File Type Posted
Example_TASK_ORDER_FORM.xls XLS spreadsheet
Building GD ID120010 04-06-2012 ID10.pdf PDF
Residential ID120004 01-06-2012 ID4.pdf PDF
Residential ID120003 01-06-2012 ID3.pdf PDF
AG-0261-S-12-0031.pdf PDF
MASTER_TASK_ORDER_FORM.xls XLS spreadsheet
joc_proposal_orig.xls XLS spreadsheet
Example_idiq_project.pdf PDF
StandardSpecs.docx DOCX document
Building GD ID120002 04-27-2012 ID2.pdf PDF
SOW Boise NF Maint.pdf PDF
bnf_map.pdf PDF
Standard idiq_spec_dwgs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOC PROPOSAL

Title of ProjectElk Creek Bulilding #1109 RehabilitationJOB ORDER COST PROPOSAL FORM
Job Order Contract No:Job Order Contract No.ExampleModify and Attach a Copy of the Job Order Request Form

If subcontracting a NON-PREPRICED item, attach 3 quotes for review.

Job Order Number:Enter Job Order Number1
Ranger District (Community):Enter Ranger District or CommunityLowman Ranger District
County:Enter CountyValley County
Site Superintendent:Name of Site Superintendent
Sub-Contractor:Name of Sub-Contractor
Sub-Contractor:Name of Sub-ContractorFLAT FEE ITEM
Date Prepared:Enter DateDescriptionQuant.UnitUnit CostTotal
Prepared By:Name of PreparerPermits and Fees :0L.S.Actual Cost
Job Order Time:Enter Days90Operation/Maintenance Manual:0L.S.Actual Cost
Job Order Perf. Period:Enter Start Date1-Jul
RSMEANS COSTS PRE-PRICED ITEMSBare Unit CostsTotal CostsAdjusted Total Costs
Line #Mean's ItemDescriptionQtyLabor Hrs.UnitMat.Labor RateEquip.Total Hrs.Ttl mat'l/EqTtl LaborCCI by DivCost
122 41 23.30 3100Showers Fiberglass one piece, three walls 36" square12.909Ea555.00143.000.002.91$ 555.00$ 415.9986.9$ 843.79
222 41 23.30 4200Showers Rough-in, supply, waste, and vent for shower12.05Ea590.00385.000.002.05$ 590.00$ 789.2586.9$ 1,198.57
322 41 39.10 4240Faucets and fittings, shwer pressure balancing mixing valve, with shower head … Chrome11.303Ea222.0071.000.001.30$ 222.00$ 92.5186.9$ 273.31
422 05 05.10 1340Selective Plumbing Demolition, Shower stall12.667Ea0.00131.000.002.67$ - 0$ 349.3891.9$ 321.08
508 05 05.10 0240Selective Demolition, Windows, Aluminum, to 25sf40.727Ea0.0025.500.002.91$ - 0$ 74.1589.9$ 66.66
608 05 05.10 0200Selective Demolition, Doors, exterior10.5Ea0.0017.550.000.50$ - 0$ 8.7889.9$ 7.89
707 05 05.10 5520Selective Demolition, Wood Shingles8500.23SF0.000.800.00195.50$ - 0$ 156.4084.1$ 131.53
808 14 33.20 0260Wood Door Residential, Exterior Door and Screen0.51.6Ea300.0070.500.000.80$ 150.00$ 56.4089.9$ 185.55
908 52 10.70 9000**Plain Wood Window, Sliding, Labor/Equip Charge32.667Ea0.00118.000.008.00$ - 0$ 944.1289.9$ 848.76
1008 52 10.20 9000**Plain wood Window, Awning Labor/Equip Charge12Ea0.0088.000.002.00$ - 0$ 176.0089.9$ 158.22
1106 16 36.10 0302Sheathing, Plywood on roofs, CDX, 3/4" thick8500.013SF0.700.590.0011.05$ 595.00$ 6.5281.2$ 488.43
1207 13 53.10 2200Sheet Waterproofing, Polyethelene and rubberixed asphalt8500.29SF0.631.090.00246.50$ 535.50$ 268.6984.1$ 676.32
1307 31 29.13 0012Wood Shingles 16" No. 1 Red Cedar shingles, 5" exposure8.53.2SQ208.00141.000.0027.20$ 1,768.00$ 3,835.2084.1$ 4,712.29
1407 31 29.13 2600Wood Shingles Steep Roofs over 7/12 pitch4.253.2SQ0.00141.000.0013.60$ - 0$ 1,917.6084.1$ 1,612.70
1507 31 29.13 1000Wood ShinglesAdd to above for fire retardant shingles8.50SQ55.000.000.000.00$ 467.50$ - 084.1$ 393.17
1607 65 10.10 9100Sheet Metal Flashing and Counter Flashing Stainless, 26ga350.052SF7.251.930.001.82$ 253.75$ 3.5184.1$ 216.36
1707 31 29 .13 1060Wood Shingles, Preformed ridge shingles250.02LF3.600.880.000.50$ 90.00$ 0.4484.1$ 76.06
1802 41 19.19 0600Dumpster, weekly rental, 1 dump/ week 6cy capacity20Week460.000.000.000.00$ 920.00$ - 091.9$ 845.48
1906 05 23.10 0700Nails, material only, based on 50# box, common 3d to 60d, plain, Galvanized1000LB1.560.000.000.00$ 156.00$ - 081.2$ 126.67
2006 22 13.50 5910Millwork Mouldings, window and Door, Window Trim sets40.615Ea34.5027.000.002.46$ 138.00$ 66.4281.2$ 165.99
2109 91 13.70 0140Exterior Painting,Doors and Windows, Primer and 2 Coats, exterior latex1000.03LF0.191.150.003.00$ 19.00$ 3.4583$ 18.63
2202 83 19.23 0270Lead Based Paint Encapsulation Exterior, Brushwork,2000.027Lf1.981.020.005.40$ 396.00$ 5.5191.9$ 368.99
23
24
25
26Total Adjusted Costs:$ 13,736.46
27Contractor's Coefficient :1.00$0.00
28** Cost for installation only. Materials costs in Non-Prepriced list for custom window materialsTOTAL PREPRICED ITEMS Costs:$ 13,736.46
29
30
31The provided list of items is for reference and may or may not be all inclusive. If you determine additional or alternate Mean's Items are required to complete the work, please include them in the list with the appropriate RSMEANS information and quantities.
32
33
34
35
NON-PREPRICED MATERIALS OR NON-SUBCONTRACTED ONLY
Line #Non-PrepricedMaterials DescriptionQtyUnit*Unit PriceCost
1Non-PrepricedCedar Breather, Materials Costs, 200 SF rolls5.00Roll$ - 0
2Non-PrepricedWindows, Materials Costs5.00EA$ - 0
3Non-PrepricedLog Repairs, Including all touch up work1.00LS$ - 0
4Non-PrepricedFoundation Settling Repairs - See note 5 on sheet 5 of the project specific drawings1.00LS$ - 0
5Non-Prepriced$ - 0
6Non-Prepriced$ - 0
7Non-Prepriced$ - 0
8Non-Prepriced$ - 0
9Non-Prepriced* Please Provide Unit Prices for Items$ - 0
Total Adjusted Costs:$ - 0
Contractor's Coefficient :1.00$0.00
TOTAL NON-PREPRICED ITEMS Costs:$ - 0
NON-PREPRICED SUBCONTRACTED ITEMS ONLY
Line #Mean's ItemDescriptionQtyUnit*Unit PriceSUB COEFFCost
1Non-Prepriced1.25$ - 0
2Non-Prepriced1.25$ - 0
3Non-Prepriced1.25$ - 0
4Non-Prepriced1.25$ - 0
5Non-Prepriced1.25$ - 0
Total NON-PREPRICED SUBCONTRACTED Costs:$ - 0
* Please Provide Unit Prices for Items
Job Order Total Cost:$13,736.46