AG0120S110032_SiteVisitNotes.pdf

PDF 23 KB Posted

Attached to
Cordova Work Center (CWC) 12 Person Bunkhouse Accessibility Retrofit
Solicitation number
AG-0120-S-11-0032
Issued by

About this file

Site Visit Meeting Notes

View the file

Other files

File Type Posted
AG0120S110032_Amend002_SF30.pdf PDF
AG0120S110032ConfCallAtndeList.pdf PDF
AG0120S110032ConfCall_AgendaMtgNotes.pdf PDF
WDOL_GnlDec_AK1_Mod33_19Aug2011.pdf PDF
AG0120S110032_CWCBunkhouse_SF1442.pdf PDF
AG0120S110032SiteAtndeList083111.pdf PDF
AG0120S110032_Amend001.pdf PDF
laundry room with floor hatch.JPG JPG image
tv room.JPG JPG image
west end bathroom.JPG JPG image
kitchen 2.JPG JPG image
entry interior.JPG JPG image
exterior1.JPG JPG image
west end from entryway.JPG JPG image
hallway with fire door.JPG JPG image
kitchen 1.JPG JPG image
west end bedroom one of two.JPG JPG image
west end foyer.JPG JPG image
west end shower room.JPG JPG image
entry.JPG JPG image
pantry.JPG JPG image
errata_cwc12personbunkhouseaccessretrofit_081211.pdf PDF
CRDBunkhouse_final_drawings_061710.pdf PDF
CRDBunkhouse_final_specifications_081211.pdf PDF
AG0120S110032_CWCBunkhouse_ReturnPkg.pdf PDF
revised_M3.00_081211.pdf PDF
revised_E3.00_081211.pdf PDF
AG0120S110032_CWCBunkhouseRFP_FNL.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES ON THE PRE- PROPOSAL SITE VISIT FOR THE CWC 12- PERSON

BUNKHOUSE ACCESSIBILITY RETROFIT

Aug. 31, 2011 at 5pm

Dana Smyke, of CRD, and Vanessa Alao-MacLeod, Forest Service Engineer, met seven (7) contractors at the bunkhouse. Vanessa asked the contractors to sign the

Attendee List. The Attendee List is attached.

Vanessa introduced herself and Dana Smyke then briefly mentioned the scope of work.

Then, they showed the the affected areas in the interior of the building.

Questions/ comments from the group:

Question: Contractor mentioned that they could not get the drawings file to print.

Answer: If contractors need drawings, specifications and photographs printed out they can contact Alaska Digital Blue Print and purchase a set (reference

Section L, item L.12)

Question: Contractor was not able to open the solicitation. Contractor said there were two (2) copies of the solicitation.

Answer: One copy of the solicitation package is a full set and the other one is a return set – the pages that should be returned along with other required documents.

Question: Are you replacing the floor in the kitchen?

Answer: No, the following in the kitchen is not being replaced. .

Question: How old is the flooring?

Answer: The flowing was installed in 2000.

The group also viewed the location of the ramp, stairs, and roof extension.

The visit ended around 5:45pm.