About this file

This is a Statement of Work (SOW) for tunnel heating electrical work at the National Institute of Standards and Technology (NIST) Building 42 in Boulder, Colorado.

The scope requires disconnection of two existing 7.5 HP, 480V, 3-phase supply fans in the tunnel, with one circuit retained for a new 5 HP, 480V, 3-phase make-up air unit and the other circuit removed (with conduit retained and labeled "SPARE"). The contractor must connect the new make-up air unit to the existing retained circuit, relabel the panelboard directory, and confirm the unit includes a VFD to serve as the disconnecting means. Additionally, the contractor shall provide electrical connections to three 10 kW unit heaters (480V, 3-phase each) located at the bottom landing of each tunnel entry point. This includes installing new 20A, 3-phase circuit breakers in existing panelboards LP1, LP2, and LP3 (located below each tunnel entry point), using circuits of (3#12+#12G) in 3/4" conduit, and 30A, 3-phase heavy-duty safety disconnects as disconnecting means. The contractor must survey existing loads on all affected panelboards and distribution equipment, provide updated load summaries, and conduct 30-day metering to confirm panelboard capacities. All work must comply with NIST site standard requirements for labeling, conduit color, and installation specifications referenced in attached documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Steam Tunnel Ventilation Replacement, newest first.
File Type Posted
Specifications.zip ZIP file
001000 General Contractor Requirements and Site Standards.zip ZIP file
Additional Tunnel Heating-M-1.pdf PDF
Additional Tunnel Heating-M-2.pdf PDF
01A NIST Boulder General Contractor Requirements.pdf PDF
Additional Tunnel Heating-M-0.pdf PDF
Additional Tunnel Heating-M-4.pdf PDF
DRAFT SOW - Steam Tunnel Ventilation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. TUNNEL HEATING – ELECTRICAL SCOPE OF WORK

a. DISCONNECT THE EXISTING TWO SUPPLY FANS IN THE TUNNEL. EACH FAN IS 7.5 HP, 480V, 3-PHASE.

i. ONE OF THE EXISTING CIRCUITS SHALL REMAIN FOR THE CONNECTION TO THE NEW MAKE-UP AIR UNIT.

ii. THE OTHER CIRCUIT SHALL BE REMOVED BACK TO IT’S SOURCE WITH THE EXCEPTION OF ITS CONDUIT. CONDUIT SHALL REMAIN FOR FUTURE USE AND BE LABELED AS “SPARE” ON ALL OF ITS ASSOCIATED BOXES. THE CIRCUIT

BREAKER SHALL ALSO BE LABELED AS “SPARE”.

b. CONNECT NEW MAKE-UP AIR UNIT (5 HP, 480V, 3-PHASE) TO THE EXISTING CIRCUIT THAT REMAINED FROM 1., a., i. RELABEL ITS LOAD IN THE PANELBOARD DIRECTORY. CONFIRM THAT THE MAKE-UP AIR UNIT IS PROVIDED WITH A VFD SINCE THAT VFD WILL SERVE AS ITS DISCONNECTING MEANS. CONFIRM VOLTAGE AND OTHER ELECTRICAL

REQUIREMENTS WITH THE MECHANICAL CONTRACTOR. NEW LOAD IS LESS THAN LOAD REMOVED.

c. PROVIDE ELECTRICAL CONNECTIONS TO THREE 10kW UNIT HEATERS. EACH UNIT HEATER WILL BE LOCATED AT THE

BOTTOM LANDING OF EACH TUNNEL ENTRY POINT.

i. EACH UNIT HEATER IS RATED FOR 10kW, 480V, 3-PHASE. CONFIRM VOLTAGE AND OTHER ELECTRICAL REQUIREMENTS

WITH THE MECHANICAL CONTRACTOR.

ii. PROVIDE NEW 20A3P CIRCUIT BREAKERS IN EXISTING PANELBOARDS “LP1”, “LP2”, AND “LP3”. NEW CIRCUIT BREAKERS SHALL MATCH EXISTING PANELBOARD’S MANUFACTURER AND AIC RATINGS. PANELBOARDS “LP1”, “LP2”, AND “LP3” ARE

LOCATED IN THE TUNNEL BELOW EACH TUNNEL ENTRY POINT.

iii. CIRCUIT SHALL BE (3#12+#12G)3/4”C.

iv. DISCONNECTING MEANS SHALL BE 30A3P, HEAVY-DUTY SAFETY DISCONNECT.

v. COORDINATE EXACT LOCATION OF THE UNIT HEATERS WITH MECHANICAL CONTRACTOR.

d. CONTRACTOR SHALL SURVEY EXISTING LOADS ON PANELBOARDS “LP1”, “LP2”, “LP3”, AND “HVDC”, THEN PROVIDE UPDATED AND COMPLETE LOAD SUMMARIES FOR ALL PANELBOARDS, DISTRIBUTION EQUIPMENT, ETC. THAT IS AFFECTED BY THE

ADDITIONAL LOADS.

e. PROVIDE 30-DAY METERING AS NECESSARY TO CONFIRM PANELBOARD CAPACITIES AND ASSIST IN THE LOAD STUDIES.

ELECTRICAL SPECIFICATIONS AND OTHER MISCELLANEOUS REQUIREMENTS

1. REFER TO PRODUCT DATA OF ALL NEW MECHANICAL EQUIPMENT FOR ELECTRICAL DATA AND ADDITIONAL REQUIREMENTS.

2. PROVIDE NEW ELECTRICAL DISTRIBUTION EQUIPMENT AS NECESSARY FOR A COMPLETE SYSTEM.

3. LABEL ALL NEW EQUIPMENT TO MEET NIST’S SITE STANDARD REQUIREMENTS.

4. PTOVIDE NEW CONDUITS AS NECESSARY. COLOR OF NEW CONDUITS TO MEET NIST’S SITE STANDARD REQUIREMENTS.

5. ALL INSTALLATIONS SHALL MEET NIST’S SITE STANDARD REQUIREMENTS. REFER TO NIST’S SITE STANDARD SPECIFICATIONS

ATTACHMENT FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

6. REFER TO ATTACHED DOCUMENTS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

ELECTRICAL SCOPE OF WORK

G

CAP

G

G

G

G

H

G

F

CONNECT 1 1/2" G TO

EXISTING 3" GAS VALVE,

FIELD

VERIFY SIZE AND

LOCATION.

42-MAU-001

42-MAU-001 UNDER GROUND GAS SERVICE

1 1/2" G

1 1/2" G

1 1/2" STEEL GAS PIPE

3 FT ABOVE GRADE

SLEEVE PIPE THROUGH WALL

SEAL WATER TIGHT.

1 12" MDPE GAS PIPE

24" BELOW GRADE,

COORDINATE PIPE

ROUTING WITH TREES. 1 1/2" STEEL GAS PIPE

ABOVE GRADE

SCALE: NOT TO SCALE

OA

S

BO - Outside Air Damper

N.C.

OA DAMPER

42- MAU-001 ENABLED

ALL MOTORIZED DAMPERS SHALL OPEN TO THEIR FULL OPEN

POSITION. FINAL DAMPER POSITION SHALL BE ADJUSTABLE.

42- MAU-001 DISABLED

ALL MOTORIZED DAMPERS SHALL BE IN THEIR CLOSED POSITION.

FINAL DAMPER POSITION SHALL BE ADJUSTABLE.

TUNNEL ENCLOSURE DAMPER ALARM

IF ANY TUNNEL ENCLOSURE DAMPER FAILS TO OPEN AFTER 60

SEC (ADJ) SEND ALARM TO BMS FRONT END

TUNNEL STAIR ENCLOSURE

VENTILATION DAMPER SEQUENCE

ALL MOTORIZED DAMPERS SHALL BE IN THEIR CLOSED POSITION.

SHEET NUMBER

PROJECT NAME of

325 BROADWAY BOULDER, COLORADO 80305-3328

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

DATEDESIGN APPROVAL

BOULDER DESIGN AND CONSTRUCTION DIVISION

DATESUPV.BYDESCRIPTIONREVISION

3 DRAFTING

ADDITIONAL TUNNEL HEAT

COOK

BUILDING 42 TUNNEL VENTILATION

3/10/2026

M-3COOK

Sheets and Views
M-3

File details come from the government source that posted it. Updated .