Additional Tunnel Heating-M-0.pdf
PDF 170 KB Posted
- Attached to
- Steam Tunnel Ventilation Replacement Federal contract opportunity
- Solicitation number
- NB196000-26-00830
About this file
This is a mechanical design drawing and legend document for Building 42 Tunnel Ventilation at the National Institute of Standards and Technology (NIST) facility located in Boulder, Colorado. The document provides comprehensive mechanical and plumbing symbols, abbreviations, and general notes applicable to all mechanical drawings for the project. Key design parameters include a project altitude of 5,400 feet above sea level, summer design temperature of 94°F dry bulb/61°F wet bulb, and winter design temperature of -4°F dry bulb. The drawing index references multiple sheets including mechanical schedules (M-1), plumbing schedules (M-2), and mechanical/plumbing plans for buildings 3034, 2042, 3056, and 3301.
The document establishes critical contractual responsibilities and requirements for the contractor, including mandatory pre-bid site visits to verify dimensions and existing conditions, complete equipment connections, parking arrangements, and coordination of equipment downtime with the owner. All work must comply with applicable state and local codes and owner standards, with mechanical work limited to five feet outside the building. The contractor is responsible for coordinating ductwork, ceiling devices, and radiant/snowmelt PEX tubing locations with structural and architectural drawings prior to concrete pours. All exterior wall and roof penetrations must be sealed waterproof, and the contractor bears full responsibility for safety precautions and construction methods. The document explicitly states that no extras will be allowed for alterations of a foreseeable nature required to achieve the end result indicated by contract documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications.zip | ZIP file | |
| 001000 General Contractor Requirements and Site Standards.zip | ZIP file | |
| Additional Tunnel Heating-M-1.pdf | ||
| Additional Tunnel Heating-M-2.pdf | ||
| 01A NIST Boulder General Contractor Requirements.pdf | ||
| Additional Tunnel Heating-M-4.pdf | ||
| DRAFT SOW - Steam Tunnel Ventilation.docx | DOCX document | |
| Additional Tunnel Heating-M-3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NUMBER
PROJECT NAME of
325 BROADWAY BOULDER, COLORADO 80305-3328
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
DATEDESIGN APPROVAL
BOULDER DESIGN AND CONSTRUCTION DIVISION
DATESUPV.BYDESCRIPTIONREVISION
3 DRAFTING
BUILDING 42 TUNNEL VENTILATION
REESE
GENERAL NOTES
MECHANICAL LEGENDS AND
BUILDING 42 TUNNEL VENTILATION
4/1/2026
M-0COOK
FLEXIBLE PIPE CONNECTOR (STAINLESS STEEL BRAIDED)
FLEXIBLE EQUIPMENT CONNECTOR (RUBBER DOUBLE BELLOWS)
PIPE GUIDE
PIPE EXPANSION JOINT
PIPE ANCHOR
PIPE UNION
PIPE CAP
CHILLED WATER RETURN
HEATING WATER RETURN
HEATING WATER SUPPLY
CHILLED WATER SUPPLY
SNOW MELT SUPPLY
SNOW MELT RETURN
HIGH PRESSURE COND. RETURN
RADIANT WATER RETURN
LOW PRESSURE COND. RETURN
SHUT OFF VALVE IN RISER
DRAIN VALVE W/ HOSE END
CONDENSATE PUMP DISCHARGE
PLUG OR BALANCING SHUT-OFF VALVE IN RISER
RADIANT WATER SUPPLY
FLOW CONTROL VALVE W/ CHECK
STRAINER W/ BLOW-OFF VALVE
N.O. VALVE W/ LOCKING COVER
SAFETY OR RELIEF VALVE
PRESSURE REDUCING VALVE
PRESSURE - TEMP. TAP
TEMPERATURE CONTROL VALVE, 3-WAY
TEMPERATURE CONTROL VALVE, 2-WAY
PRESSURE GAUGE W/ PIG TAIL & COCK
S
VACUUM BREAKER
THERMOMETER
MANUAL AIR VENT
VALVES & SPECIALTIES
RL
CHECK VALVE
REFRIGERANT LIQUID
SHUT-OFF VALVE
GLOBE VALVE
FLOW INDICATOR
FOR
FOS
RS
FOV
LPS
CP
LPR
D
RWR
HPR
HPS
SMS
SMR
RWS
LOW PRESSURE STEAM
FUEL OIL SUPPLY
FUEL OIL VENT
FUEL OIL RETURN
REFRIGERANT SUCTION
HIGH PRESSURE STEAM
DRAIN PIPE
MECHANICAL & PLUMBING LEGEND
HWS
CWS
CWR
HWR
PIPING
ABBREVIATIONS
1.5"
CALIBRATED BALANCING SHUT-OFF VALVE.
PREMANUFACTURED PIPE EXPANSION LOOP. REQUIRED EXPANSION
COMPENSATION LISTED. PROVIDE GUIDES & ANCHORS AS
RECOMMENDED BY MANUFACTURER.
DRAWING INDEX
PROJECT INFORMATION
PRESSURE INDEPENDENT 2-WAY CONTROL VALVE
PRESSURE INDEPENDENT AUTOMATIC BALANCING VALVE
PROJECT LOCATION: BOULDER, COLORADO
PROJECT ALTITUDE: 5,400 FEET ABOVE SEA LEVEL
SUMMER DESIGN TEMPERATURE: 94°F DRY BULB, 61°F WET BULB (ASHRAE 0.4% DESIGN)
WINTER DESIGN TEMPERATURE: -4°F DRY BULB (ASHRAE 99.6%)
SUMMER ROOM DESIGN TEMP: 75°F DRY BULB - NO HUMIDITY REQUIREMENT
WINTER ROOM DESIGN TEMP: 72°F DRY BULB - NO HUMIDITY REQUIREMENT
AUTOMATIC AIR VENT
RD REFRIGERANT DISCHARGE
GENERAL NOTES (FOR ALL MECHANICAL DRAWINGS)
1. INFORMATION ON THE DRAWINGS HAS BEEN ASCERTAINED FROM EXISTING DRAWINGS AND FIELD
OBSERVATIONS. THIS INFORMATION IS AS ACCURATE AS CONDITIONS WOULD ALLOW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, PRIOR TO BID, AND BECOME FAMILIAR WITH
THE EXTENT OF THE WORK REQUIRED. NO EXTRAS WILL BE ALLOWED FOR ALTERATIONS OF A
FORESEEABLE NATURE REQUIRED TO ACHIEVE THE END RESULT AS INDICATED BY CONTRACT
DOCUMENTS.
2. CONTRACTOR IS TO PROVIDE COMPLETE CONNECTIONS TO ALL EQUIPMENT.
3. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR PARKING, COORDINATE ANY EQUIPMENT DOWNTIME, AND COORDINATE GENERAL WORK SCHEDULE WITH OWNER.
4. CONTRACTOR SHALL VISIT THE SITE BEFORE SUBMITTING BID, AND VERIFY DIMENSIONS AND EXISTING
CONDITIONS RELATED TO THE WORK.
5. ALL CUTTING, PATCHING AND CORE DRILLING FOR THE INSTALLATION OF NEW EQUIPMENT, DUCTS, HANGERS, ETC. SHALL BE HELD TO A MINIMUM AND BE ACCOMPLISHED IN A CAREFUL MANNER.
6. CONTRACTOR TO COORDINATE THE LOCATION OF ALL DUCTWORK, CEILING DEVICES, GRILLES, REGISTERS AND DIFFUSERS WITH REFLECTED CEILING PLAN AND STRUCTURE PRIOR TO BEGINNING
WORK.
7. DUCT DIMENSIONS GIVEN ARE OUTSIDE SHEET METAL DIMENSIONS.
8. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS
FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE
ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE
OWNER.
9. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR
TO MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM HIS WORK.
10. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STATE CODES, LOCAL CODES
AND OWNER'S STANDARDS INDICATED BY THE CONSTRUCTION DOCUMENTS.
11. ALL EXTERIOR WALL AND ROOF PENETRATIONS SHALL BE SEALED WATERPROOF.
12. ALL MECHANICAL WORK UNDER THIS CONTRACT IS TO FIVE (5) FEET OUTSIDE THE BUILDING.
13. XX-## REFERS TO EQUIPMENT DESIGNATION. SEE SPECIFICATIONS AND EQUIPMENT SCHEDULES FOR
FURTHER INFORMATION IN REFERENCE TO THAT DESIGNATED PIECE OF EQUIPMENT.
14. DRAWINGS INDICATE UNITS IN IP UNITS. WHERE SUBMITTED MATERIAL USES METRIC UNITS, SUCH AS PRE-INSULATED PEX, THE SUBMITTED MATERIAL INSIDE FREE AREA SHALL BE EQUIVALENT OR LARGER
THAN THE IDENTIFIED IP PIPE SIZE FREE AREA.
15. CONTRACTOR SHALL FIELD COORDINATE EXACT LOCATION OF RADIANT / SNOWMELT PEX TUBING WITH
STRUCTURAL / ARCHITECTURAL DRAWINGS, INDUSTRIAL EQUIPMENT DRAWINGS, AND GENERAL
CONTRACTOR PRIOR TO CONCRETE POUR.
(1) SHEET NO. WHERE SHOWN.
SECTION CUT: (A) SECTION I.D.
POINT OF PIPE CONNECTION NEW TO EXISTING
POINT OF DUCT OR PIPE CONNECTION NEW TO EXISTING
U.C. 1" UNDERCUT DOOR, 1".
MISCELLANEOUS
A
CONTROLS (IN PLAN)
PS
APS
FM
LT
SD
PDS
S
T
T
H
DIFFERENTIAL AIR PRESSURE SENSOR
PRESSURE DIFFERENTIAL SENSOR
LOW LIMIT THERMOSTAT
TEMPERATURE CONTROL (T.C.) DAMPER
SMOKE DETECTOR (DUCT)
FLOW METER
SWITCH
PRESSURE SWITCH
HUMIDISTAT/SENSOR
NIGHT THERMOSTAT
THERMOSTAT/TEMP SENSOR
STARTER
N
FLEXIBLE DUCT
HVAC DUCTWORK
24/12
BACKDRAFT DAMPER
FLEXIBLE CONNECTION
SUPPLY AIR DUCT DOWN
OA, RA OR EXH DUCT DOWN
UP
COMBINATION FIRE / SMOKE DAMPER
OPPOSED BLADE DAMPER ( O.B.D. )
TURNING VANES SHOWN IN 90° ELBOW.
SMOKE DAMPER
FS
FIRE DAMPER
S
D - DOUBLE WALL CONSTRUCTION
UL - UNLINED DUCTWORK
V - OVAL DUCTWORK
DUCT SIZES ARE OUTSIDE SHEET METAL DIMENSIONS. 1st NO. IS SIZE OF SURFACE SHOWN. 2nd NO. IS DUCT DEPTH.
LETTERS AFTER DIM. CORRESPOND TO FOLLOWING:
Ø - ROUND DUCTWORK
SIZE
CFM
R#
S#
SIZE
CFM
SUPPLY DIFFUSER. ALL DIFFUSERS FOUR-WAY THROW
UNLESS NOTED OR THROWS SHOW IN PLAN. SEE
SCHEDULE FOR TYPE.
RETURN AIR TAG. SEE SCHEDULE FOR TYPE.
SECTION THRU OUTSIDE AIR INTAKE OR SUPPLY AIR DUCT
SECTION THRU RETURN AIR OR EXHAUST DUCT
CHANGE OF ELEVATION UP (UP) DOWN (DN) IN DIRECTION
OF AIR FLOW
RETURN AIR GRILLE W/SOUND BOOT SHADING INDICATES
OPEN END
REFERENCE DESIGNATION FOR PLUMBING ISOMETRICX
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ALT ALTITUDE
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
C COMMON PORT
CFM CUBIC FEET PER MINUTE
SCFM CFM, STANDARD CONDITIONS
CU FT CUBIC FEET
CU IN CUBIC INCH
Cv COEFFICIENT, VALVE FLOW dB DECIBEL
DB DRY BULB
DCW DOMESTIC COLD WATER
DEG OR ° DEGREE
DHW DOMESTIC HOT WATER
DIA DIAMETER
DN DOWN
(E) EXISTING
EAT ENTERING AIR TEMP.
EFF EFFICIENCY
ELEV ELEVATION
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMP.
EXH EXHAUST
F FAHRENHEIT
LF LINEAR FEET
LRA LOCKED ROTOR AMPS
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MCA MINIMUM CIRCUIT AMPS
MIN MINIMUM
N/A NOT APPLICABLE
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO OR # NUMBER
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
% PERCENT
PH OR Ø PHASE (ELECTRICAL)
PPM PARTS PER MILLION
PRESS PRESSURE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA PSI ABSOLUTE
PSIG PSI GAUGE
RA RETURN AIR
RECIRC RECIRCULATE
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FOOT, FEET, FEET WATER COLUMN
FU FIXTURE UNITS
GA GAUGE
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD
HG MERCURY
HGT HEIGHT
HORZ HORIZONTAL
HP HORSEPOWER
HR HOUR(S)
HWC HOT WATER CIRCULATING (DOMESTIC)
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IJS IN JOIST SPACE
IN INCHES
IN W.C. INCHES IN INCHES WATER COLUMN
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS OR # POUNDS
RH RELATIVE HUMIDITY
RLA RUNNING LOAD AMPS
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SENS SENSIBLE
SL SEA LEVEL
SP STATIC PRESSURE
SPEC SPECIFICATION
SQ SQUARE
STD STANDARD
TD TEMPERATURE DIFFERENCE
TEMP TEMPERATURE
THRU THROUGH
TJO THROUGH JOIST OPENINGS
TONS TONS OF REFRIGERATION
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TYP TYPICAL
V VOLT
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VERT VERTICAL
VOL VOLUME
W WATT
WB WET-BULB
WPD WATER PRESSURE DROP
WT WEIGHT
PLUG VALVE.P
BALL VALVE
T TEMP SENSOR W/STAINLESS STEEL COVERS
T TEMP SENSOR W/SETPOINT ADJUSTMENTA
T TEMP SENSOR W/TEMP INDICATIONI
T TEMP SENSOR W/SET POINT ADJUSTMENTAI
AND TEMP INDICATION
T THERMOSTAT/TEMP SENSOR WITH LOCKING GUARDG
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSORCO
C
(1) SHEET NO. WHERE SHOWN.
SECTION CUT: (A) SECTION I.D.
POINT OF PIPE CONNECTION NEW TO EXISTING
POINT OF DUCT OR PIPE CONNECTION NEW TO EXISTING
MISCELLANEOUS
A
REFERENCE DESIGNATION FOR PLUMBING ISOMETRICX
W.C.O. WALL CLEANOUT
F.C.O. FLOOR CLEANOUT
GREASE WASTE PIPE
INDIRECT WASTE PIPE
STORM DRAIN/ BUILDING STORM SEWER PIPE
OVERFLOW STORM DRAIN PIPE
FUEL OIL SUPPLY
FUEL OIL VENT
FUEL OIL RETURN
COMPRESSED AIR PIPE
VACUUM PIPE
FOV
FOR
LP PROPANE
CA
VAC
OST
FOS
GW
IW
ST
DOMESTIC HOT WATER ( TEMP. SHOWN )
DOMESTIC HOT WATER CIRCULATING
CHEMICAL VENT PIPE
SANITARY WASTE PIPE
CHEMICAL WASTE PIPE
PLUMBING VENT PIPE
TEMPERED WATER
NON-POTABLE WATER
DOMESTIC COLD WATER
DOMESTIC HOT WATER
NATURAL GAS
V
CHV
CHW
W
NP
NG
T
PLUMBING
SNOWMELT
SNOWMELT SUPPLYSMS
SNOWMELT RETURNSMR
COMPRESSED AIR LOW PRESSURE PIPECA-LP
COMPRESSED AIR HIGH PRESSURE PIPECA-HP
GEAR OIL PIPINGGO
WINDOW WASH FLUIDWWF
SOW SAND/OIL WASTE PIPE
SAN SANITARY WASTE PIPE
X
#-OUTLETS
REFERENCE DESIGNATION FOR COMPRESSED AIR DETAIL. WHERE MANIFOLD
DETAIL IS REFERED THE # OF OUTLETS WILL BE NOTED, COORDINATE EXACT
LOCATION WITH EQUIPMENT. SEE COMPRESSED AIR DETAILS ON SHEET P503.
GCO GROUND CLEANOUT
INDIRECT DRAIN PIPED
M-0 GENERAL INFORMATION
M-1 MECHANICAL SCHEDULES
M-2 PLUMBING SCHEDULES
M-3 3034 MECHANICAL & PLUMBING PLANS
M-4 2042 MECHANICAL PLANS
M-5 2042 MECHANICAL & PLUMBING PLANS
M-6 3056 & 3301 MECHANICAL PLANS
| Sheets and Views |
| M-0 |
File details come from the government source that posted it. Updated .