001000 General Contractor Requirements and Site Standards.zip
ZIP file 3 MB Posted
- Attached to
- Steam Tunnel Ventilation Replacement Federal contract opportunity
- Solicitation number
- NB196000-26-00830
About this file
This is a sources sought notice for market research purposes issued by the National Institute of Standards and Technology (NIST) Boulder Campus to identify qualified and certified 8(a) small business construction firms capable of performing a Steam Tunnel Ventilation System Replacement project. The work will be performed at the NIST Boulder Campus in Boulder, Colorado, with an anticipated period of performance of 365 calendar days from notice to proceed. The contract will be awarded as a single Firm-Fixed-Price (FFP) award under NAICS Code 236220 (Commercial and Institutional Building Construction). Eligible certified 8(a) small businesses are encouraged to respond with capability statements not exceeding ten pages that must include company information and UEI number, primary point of contact details, business size and socio-economic status, relevant construction experience, bonding capacity (single and aggregate), and technical discussion of ability to perform the required services.
The attached draft Statement of Work entitled "DRAFT SOW - Steam Tunnel Ventilation" and associated attachments contain the specific work requirements. Interested contractors should note that this is a sources sought notice for market research only and does not constitute a Request for Proposal or Request for Quotation. The Government is not committing to award a contract at this time and will not compensate respondents for information submitted in response to this announcement. All information provided is voluntary and submitted at the contractor's own cost.
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications.zip | ZIP file | |
| Additional Tunnel Heating-M-4.pdf | ||
| DRAFT SOW - Steam Tunnel Ventilation.docx | DOCX document | |
| Additional Tunnel Heating-M-3.pdf | ||
| 01A NIST Boulder General Contractor Requirements.pdf | ||
| Additional Tunnel Heating-M-0.pdf | ||
| Additional Tunnel Heating-M-1.pdf | ||
| Additional Tunnel Heating-M-2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .