Addendum Three.pdf

PDF 1 MB Posted

Attached to
RFB-30-25 KCTCS Switchgear Replacement
Solicitation number
RFB 785 2500000019 5
Issued by
Cumberland County, Kentucky

About this file

This is Addendum Three to an Invitation to Bid (RFB-30-25) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for switchgear replacement at Owensboro Community & Technical College (KCTCS) Downtown Campus in Owensboro, Kentucky. The project, identified as Account No. 470-CB72-OC33-00 and A/E Project No. 2401-116, involves comprehensive electrical work including replacement of the main distribution switchboard, installation of new padmount transformers, emergency power generation, fire alarm system modifications, and associated electrical infrastructure upgrades. The addendum, dated August 15, 2024, incorporates revised electrical drawings (E1.0 Rev 2 and E2.1 Rev 1) that clarify fixture type requirements, provide electrical legends with data cable specifications, and identify specific circuit breaker locations (CB-KLEFT in Passage Room 13 and CB-XVET). The project requires coordination with multiple trades, utility companies, and specialized subcontractors, including Innovative Fire & Security Solutions for fire alarm modifications and Owensboro Municipal Utilities (OMU) for utility work.

The contractor must include allowances of $5,000.00 for fire alarm system work performed by Innovative Fire & Security Solutions and $12,300.00 for work performed by OMU, with overhead and profit to be added separately. All costs associated with permits, state inspections, utility disruptions, power outages, and overtime labor must be included in the bid price. Power outages are limited to after normal business hours (8:00 PM to 6:00 AM Monday through Thursday) and weekends (Friday after 4:30 PM through Sunday 11:59 PM). The contractor is responsible for demolition and removal of existing Federal Pacific distribution equipment, delivery to on-site storage as directed, installation of fire alarm devices and associated cabling, all cutting and patching to meet existing fire ratings, and coordination of utility work with OMU and the owner/using agency (KCTCS-OCTC).

View the file

Other files

File Type Posted
Final_RFB_785_2500000019_5_SO_FORM.PDF PDF
Addendum Two .pdf PDF
Final_RFB_785_2500000019_3_SO_FORM.PDF PDF
Final_RFB_785_2500000019_4_SO_FORM.PDF PDF
Final_RFB_785_2500000019_1_SO_FORM.PDF PDF
Final_RFB_785_2500000019_2_SO_FORM.PDF PDF
Addendum One.pdf PDF
Addendum Four .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-30-25

FOR: Switchgear Replacement Owensboro Community & Technical College Downtown Campus-KCTCS Owensboro, Kentucky

DATE: August 16, 2024

RFB-785-2500000019

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-30-25 For: Switchgear Replacement Owensboro Community & Technical College Downtown Campus-KCTCS

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

August 15, 2024

Mr. Brian Cottongim Kentucky Finance and Administration Cabinet Department for Facilities & Support Services

Bush Building

403 Wapping Street Frankfort, Kentucky 40601

Re: Switchgear Replacement -Owensboro Community & Technical College – Downtown Campus -

KCTCS

Request for Bid: RFB-30-25

Account No.: 470-CB72-OC33-00 A/E Project no.: 2401-116

Dear Mr. Cottongim:

The following items need to be included in an addendum to the Switchgear Replacement - Owensboro Community & Technical College Downtown Campus – KCTCS Project.

Addendum Items:

1. Refer to attached Revised Drawing E1.0 Rev 2 Site Electrical Plan, Lighting Fixture Schedule.

a. Clarified Fixture type “F3D” requirements.

2. Refer to attached Revised Drawing E1.0 Rev 2 Site Electrical Plan, Electrical Legend.

a. Added an electrical legend which clarifies fixture symbols used and quantities of data cables required to be provided to data outlets.

3. Refer to attached Revised Drawing E2.1 Rev 1 Electrical Plan First Floor, Passage Room 13.

a. Identified location and requirements for Circuit Breaker “CB-KLEFT”.

4. Refer to attached Revised Drawing E2.1 Rev 1 Electrical Plan First Floor, Enlarged Elec Plan – Mezz Rm 23.

a. Identified location and requirements for Circuit Breaker “CB-XVET”.

Sincerely, HAFER

Matt Brockman, P.E., LEED® AP

Attachments:

(1) Revised Drawing E1.0 Rev 2 Site Electrical Plan

(2) Revised Drawing E2.1 Rev 1 Electrical Plan – First Floor

G1. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND

NEW CONSTRUCTION REQUIREMENTS WITH THE WORK OF ALL OTHER TRADES

INVOLVED ON THIS PROJECT.

G2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED CUTTING AND

PATCHING TO PROVIDE DEMOLITION AND NEW CONSTRUCTION REQUIREMENTS.

ALL INSTALLATION AND PATCHING SHALL MEET THE FIRE RATINGS OF THE

EXISTING CEILING/WALL/FLOOR SYSTEMS.

G3. PERMITS & STATE INSPECTION COSTS. ALL COSTS ASSOCIATED WITH

OBTAINING THE REQUIRED PERMITS AND INSPECTIONS FOR THE NEW

CONSTRUCTION INSTALLATION SHALL BE INCLUDED IN THE ELECTRICAL

CONTRACTOR'S BID PRICE.

G4. FIRE ALARM SYSTEM MODIFICATIONS. THE CONTRACTOR SHALL PROVIDE

THE SERVICES OF INNOVATIVE FIRE & SECURITY SOLUTIONS, FOR ALL WORK

ASSOCIATED WITH MODIFICATIONS TO THE FIRE ALARM SYSTEM.

ROBERT HORTON

812-568-4977

RHORTON@IFSS-EVV.COM.

G5. ALLOWANCE FOR THE WORK PERFORMED BY INNOVATIVE FIRE &

SECURITY SOLUTIONS. THE CONTRACTOR SHALL INCLUDE IN THEIR BID PRICE A

TOTAL ALLOWANCE COST OF $5,000.00 FOR THE WORK PERFORMED BY

INNOVATIVE FIRE & SECURITY SOLUTIONS (IFSS). THE ALLOWANCE DOES NOT

INCLUDE ANY OVERHEAD AND PROFIT THE BIDDING CONTRACTOR NEEDS TO

ADD ON TOP OF THE ALLOWANCE. THE FOLLOWING IS A CLARIFICATION OF THE

SCOPE WHICH IS INCLUDED IN THE ALLOWANCE AMOUNT.

G5.1. IFSS SHALL FURNISH TO THE ELECTRICAL CONTRACTOR ALL

REQUIRED SMOKE DETECTORS, HEAT DETECTORS, ADDRESSABLE

RELAYS AND MONITOR MODULES AND AUDIO & VISUAL ALARM

INDICATING DEVICES REQUIRED TO MEET THE REQUIREMENTS OF

THE CONTRACT DRAWINGS AND SPECIFICATIONS.

G5.2. IFSS SHALL FURNISH ALL LABOR REQUIRED TO REMOVE DEMOED

FIRE ALARM EQUIPMENT FROM THE FIRE ALARM SYSTEM PANEL

PROGRAMMING.

G5.3. IFSS SHALL FURNISH ALL LABOR REQUIRED TO PROGRAM FIRE

ALARM DEVICES AFTER INSTALLATION OF THE DEVICES BY THE

ELECTRICAL CONTRACTOR HAS BEEN COMPLETED.

G5.4. IFSS WILL FURNISH LABOR TO BE PRESENT FOR AND ASSIST IN THE

TESTING OF THE FIRE ALARM SYSTEM AND NEW DEVICES. THIS

TESTING SHALL OCCUR AND BE COMPLETED DURING A MAXIMUM OF

TWO SITE VISITS.

G6. THE FOLLOWING WORK BY THE ELECTRICAL CONTRACTOR SHALL NOT BE

INCLUDED IN THE ALLOWANCE COST (IDENTIFIED IN PARAGRAPH G5. ABOVE) .

THE FOLLOWING COSTS SHALL BE INCLUDED IN THE CONTRACTOR'S BID PRICE.

G6.1. THE ELECTRICAL CONTRACTOR SHALL INSTALL ALL FIRE ALARM

SYSTEM DEVICES FURNISHED BY IFSS AS PART OF THE ALLOWANCE

COST.

G6.2. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL

REQUIRED CABLING & CONDUIT RACEWAYS TO INSTALL THE FIRE

ALARM EQUIPMENT FURNISHED BY IFSS AS PART OF THE

ALLOWANCE COST.

G6.3. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL

REQUIRED CIRCUITS BETWEEN THE FIRE ALARM SYSTEM AND

OTHER NON-FIRE ALARM SYSTEM EQUIPMENT REQUIRED FOR

CORRECT OPERATION.

G6.4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR AND

EQUIPMENT REQUIRED AND SHALL DEMO THE EXISTING FIRE ALARM

SYSTEM DEVICES AND ASSOCIATED CIRCUITS PER THE CONTRACT

DRAWINGS.

G6.5. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL

REQUIRED CABLING AND CONDUIT RACEWAYS AND SHALL

REINSTALL THE FIRE ALARM EQUIPMENT REMOVED FOR

RELOCATION DURING DEMOLITION.

G6.6. THE ELECTRICAL CONTRACTOR SHALL BE PRESENT FOR ALL

TESTING OF THE FIRE ALARM SYSTEM AND ALL REQUIRED

INTERFACES OF OTHER NON-FIRE ALARM SYSTEM EQUIPMENT

AFTER ALL INSTALLATION HAS BEEN COMPLETED. SEE ALLOWANCE

PARAGRAPH ABOVE FOR ADDITIONAL REQUIREMENTS.

G7. ALLOWANCE FOR THE WORK PERFORMED BY OWENSBORO MUNICIPAL

UTILITIES (OMU). THE CONTRACTOR SHALL INCLUDE IN THEIR BID PRICE A TOTAL

ALLOWANCE COST OF $12,300.00 FOR THE WORK PERFORMED BY OMU. THE

ALLOWANCE DOES NOT INCLUDE ANY OVERHEAD AND PROFIT THE BIDDING

CONTRACTOR NEEDS TO ADD ON TOP OF THE ALLOWANCE. COORDINATE ALL

REQUIRED WORK WITH THE UTILITY COMPANY.

G8. UTILITY DISRUPTIONS AND POWER OUTAGES. ALL COSTS ASSOCIATED

WITH UTILITY DISRUPTIONS AND POWER OUTAGES SHALL BE INCLUDED IN THE

CONTRACTOR'S BID PRICE. COSTS FOR OVERTIME (TIME AND A HALF, DOUBLE

TIME, HOLIDAY PAY, ETC.) SHALL BE INCLUDED IN THE CONTRACTOR'S BID

PRICE. ALL UTILITY AND POWER OUTAGES SHALL BE COORDINATED WITH AND

APPROVED BY THE OWNER/USING AGENCY (I.E. KCTCS-OCTC) PRIOR TO THE

NEED FOR THE POWER DISRUPTIONS. POWER DISRUPTIONS SHALL ONLY

OCCUR DURING "AFTER NORMAL BUSINESS HOURS" AND "WEEKEND" TIME

PERIODS. FOR BIDDING PURPOSES, THE CONTRACTOR SHALL ASSUME THE

FOLLOWING TIMES FOR UTILITY AND POWER DISRUPTIONS:

G8.1. WEEK DAYS (MONDAY THRU THURSDAY): 8:00PM TO 6:00AM

G8.2. WEEKENDS (FRIDAY EVENING AFTER 4:30PM THRU

SUNDAY EVENING 11:59PM):

G9. EXISTING FEDERAL PACIFIC DISTRIBUTION EQUIPMENT. THE OWNER /

USING AGENCY (KCTCS-OCTC) WANTS THE OLD REMOVED FEDERAL PACIFIC

EQUIPMENT & OVER-CURRENT PROTECTION DEVICES AFTER DISCONNECTION

AND REMOVAL. THE CONTRACTOR SHALL DELIVER THE EQUIPMENT TO AN ON-

SITE STORAGE LOCATION AS DIRECTED BY KCTCS-OCTC.

GENERAL NOTES (THIS PROJECT):

W 15TH ST

F R

E D

E R

IC

A

S T

D A

V

IE

S S

S T

NEW UTILITY COMPANY PADMOUNT TRANSFORMER.

CONTRACTOR SHALL PROVIDE CONCRETE BASE

AND SHALL STUB PRIMARY SIDE CONDUITS OUT

PAST EDGE OF BASE. SEE UTILITY TRANSFORMER

PAD BASE DETAIL, THIS SHEET, FOR ADDITIONAL

REQUIREMENTS. COORDINATE ALL REQUIREMENTS

WITH UTILITY COMPANY.

EXISTING UTILITY COMPANY

POLE WITH PRIMARY FEED FROM

OVERHEAD TO BELOW GRADE

EXISTING UTILITY COMPANY UNDERGROUND

PRIMARY FEED TO PADMOUNT TRANSFORMER.

(NOTE: PRIMARY FEED REPLACED WITH NEW ~ 2017

[AROUND 7 YEARS OLD])

EXISTING UNDERGROUND FEED FROM

PADMOUNT TRANSFORMER TO EXISTING

MAIN DISTRIBUTION SWITCHBOARD.

NOTE 2.

EXISTING MAIN DISTRIBUTION

SWITCHBOARD

EXISTING UTILITY COMPANY

PADMOUNT TRANSFORMER,

500KVA, 480Y/277V, 3PH 4W.

Z=1.9% ("LIVE" FRONT PRIMARY)

NEW MAIN DISTRIBUTION SWITCHBOARD

NEW UNDERGROUND FEED FROM

PADMOUNT TRANSFORMER TO NEW

MAIN DISTRIBUTION SWITCHBOARD

TEMPORARY LOCATION OF

EXISTING AIR COMPRESSOR

NOTE: PER MTG WITH UTILITY COMPANY ON 3/12/2024,

NEED A 2-DAY (WEEKEND) POWER OUTAGE TO DISCONNECT PRIMARY FEEDER,

SET NEW PADMOUNT TRANSFORMER, REWORK PRIMARY FEEDER TO NEW

TRANSFORMER AND MAKE ALL PRIMARY AND SECONDARY CONNECTIONS.

NOTE: DURING THE 2-DAY (WEEKEND) POWER

OUTAGE (FOR UTILITY CO. WORK) ELEC

CONTRACTOR SHALL DISCONNECT THE UTILITY

FEED TO THE EXISTING MAIN SWITCHGEAR AND

PROVIDE NEW TEMPORARY FEED TO EXISTING

MAIN SWITCHGEAR FROM THE NEW MAIN

DISTRIBUTION SWITCHGEAR.

NOTE 3.

1. PROVIDE TRIAD GROUNDING ELECTRODE SYSTEM. SEE GROUNDING

SYSTEM DETAILS, SHEET E1.0, FOR ADDITIONAL REQUIREMENTS. COORDINATE

THE INSTALLATION LOCATION IN FIELD WITH ALL EXISTING UNDERGROUND

UTILITIES AND INSTALLATION.

2. THE EXISTING UNDERGROUND UTILITY FEED SHALL HAVE ALL

CONDUCTORS REMOVED. EXTERIOR CONDUIT ENDS SHALL BE CAPPED. THE

INTERIOR CONDUIT ENDS SHALL BE CUT FLUSH WITH FLOOR AND FILLED.

3. PRIOR TO BACK-FEEDING THE EXISTING MAIN DISTRIBUTION

SWITCHBOARD, THE CONTRACTOR SHALL DISCONNECT THE NEUTRAL /

GROUND BOND SO THAT THE ONLY PLACE WHERE THE NEUTRAL / GROUND

BOND OCCURS IS WITHIN THE NEW MAIN DISTRIBUTION SWITCHBOARD (I.E.

SERVICE DISCONNECT LOCATION). NOTE: THE NEW GROUNDING ELECTRODE

SYSTEM AND ALL REQUIRED GROUNDING/BONDING SHALL BE IN-PLACE PRIOR

TO BACK-FEEDING THE EXISTING DISTRIBUTION EQUIPMENT.

4. PROVIDE ALL SAW-CUTTING, REMOVALS, EXCAVATION, BACK-FILLING,

PATCHING AND REPAIR OF SITE AREAS & AREAS WITHIN THE BUILDING

REQUIRED TO PROVIDE NEW INSTALLATION.

5. PROVIDE ALL SAW-CUTTING, REMOVALS, EXCAVATION, BACK-FILLING,

PATCHING AND REPAIR OF SITE AREAS (CONCRETE, ASPHALT & PLANTED

AREAS) REQUIRED TO PROVIDE NEW INSTALLATION & LEAVE AS WAS (I.E.

ASPHALTED AREAS SHALL BE ASPHALTED, CONCRETE AREAS SHALL BE

CONCRETE, PLANTED AREAS SHALL BE PLANTED, ETC.) PRIOR TO START OF

DEMOLITION.

NOTES:

NOTE 1

NEW EMERGENCY POWER GENERATOR ON CONCRETE BASE

FINAL LOCATION OF EXISTING AIR

COMPRESSOR (OLD EMERGENCY

GENERATOR LOCATION)

NEW ELEC RM "1E"

NEW ELEC RM "14E"

NEW ELEC RM "19E" NEW ELEC RM "24E"

PROVIDE PROTECTION BOLLARD.

TYPICAL, OF 13. SEE CONCRETE FILLED

PROTECTION BOLLARD DETAIL, THIS

SHEET FOR ADDITIONAL REQUIREMENTS.

NOTE 4

NOTES 4 & 5

NOTE 5

SECTION VIEW

PLAN VIEW

GROUNDING ELECTRODE SYSTEM DETAIL

NO SCALE

20'-0"

60°

20'-0"

FINISHED GRADE

3'-0"

#4/0 INSULATED COPPER

GROUND CABLE TO BUILDING

MAIN GROUND BUS BAR,

LOCATED WITHIN THE MAIN

ELECTRICAL ROOM. ROUTE

CABLE WITHIN CONDUIT

WHERE CABLE IS ROUTED

THROUGH CONCRETE OR

MASONRY WALLS AND

FLOORS. SEE GROUNDING

SYSTEM RISER DIAGRAM,

SHEET E1.0, FOR ADDITIONAL

REQUIREMENTS.

3/4" x 10'-0" COPPER

GROUND ROD. TYPICAL.

EXOTHERMIC WELD OR

IRREVERSIBLE COMPRESSION

TYPE BOND. TYPICAL.

#4/0 INSULATED COPPER

GROUND ROD BONDING CABLES.

GROUNDING SYSTEM RISER DIAGRAM

NO SCALE

GENERAL GROUNDING NOTE:

ALL BONDS TO GROUND BUS BARS SHALL BE MADE USING 2-HOLE TYPE MECHANICAL LUGS.

BOND TRANSFORMER(S) SECONDARY

NEUTRAL "X0" TO GROUND BUS BAR.

SEE ONE-LINE DIAGRAM, SHEET E3.2,

FOR ADDITIONAL REQUIREMENTS

TRIAD BUILDING GROUNDING

ELECTRODE SYSTEM. SEE

GROUNDING ELECTRODE SYSTEM

DETAIL, THIS SHEET, FOR

ADDITIONAL REQUIREMENTS.

BUILDING MAIN GROUND BUS BAR.

PROVIDE 1/4"(T) x 4"(H) x 18"(L) COPPER BUS

BAR ON INSULATED STAND-OFF DEVICES.

[PROVIDE WITHIN THE MAIN ELEC ROOM]

1#4/0 INSULATED COPPER

CABLE IN CONDUIT RACEWAY.

BOND TO NEUTRAL BUS WITHIN THE MAIN

DISTRIBUTION SWITCHBOARD USING #4/0

INSULATED COPPER CABLE INSTALLED

WITHIN NON-FERROUS (AL) CONDUIT.

BOND TO NEAREST BUILDING

STRUCTURAL STEEL COLUMN USING #4/0

INSULATED COPPER CABLE INSTALLED

WITHIN NON-FERROUS (AL) CONDUIT.

BOND BUILDING METALLIC PIPING

SYSTEMS TO THE BUS BAR USING #3/0

INSULATED COPPER CABLE INSTALLED

WITHIN NON-FERROUS (AL) CONDUIT.

1#4/0 INSULATED

COPPER CABLE IN

CONDUIT RACEWAY.

GROUND BUS BAR. PROVIDE 1/4"(T) x 4"(H) x 12"(L)

COPPER BUS BAR ON INSULATED STAND-OFF

DEVICES. [PROVIDE WITHIN NEW ELEC ROOM 24E].

GROUND BUS BAR. PROVIDE 1/4"(T) x 4"(H) x 12"(L)

COPPER BUS BAR ON INSULATED STAND-OFF

DEVICES. [PROVIDE WITHIN NEW ELEC ROOM 19E].

GROUND BUS BAR. PROVIDE 1/4"(T) x 4"(H) x 12"(L)

COPPER BUS BAR ON INSULATED STAND-OFF

DEVICES. [PROVIDE WITHIN NEW ELEC ROOM 14E].

GROUND BUS BAR. PROVIDE 1/4"(T) x 4"(H) x 12"(L) COPPER BUS BAR ON

INSULATED STAND-OFF DEVICES. [PROVIDE WITHIN NEW ELEC ROOM 1E].

BOND TRANSFORMER(S) SECONDARY NEUTRAL "X0" TO

GROUND BUS BAR. SEE ONE-LINE DIAGRAM, SHEET E3.2,

FOR ADDITIONAL REQUIREMENTS

BOND TRANSFORMER(S) SECONDARY NEUTRAL "X0" TO GROUND BUS BAR.

SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS.

BOND TRANSFORMER(S) SECONDARY NEUTRAL "X0" TO GROUND BUS BAR.

SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS.

#4/0 INSULATED COPPER

GROUND CABLE TO EMERGENCY

POWER GENERATOR "X0". ROUTE

CABLE WITHIN CONDUIT WHERE

CABLE IS ROUTED BELOW

AND/OR THROUGH CONCRETE .

LIGHTING FIXTURE SCHEDULE

MANUFACTURERSYMBOL DESCRIPTION

TYPE

FIXTURE SERIES

LAMP

LENSWATTS REFLECTOR

MOUNTING

LIGHT CONTROL

REMARKS

FIXTURE

VOLTAGEQNTY PER

FIXTURE

LITHONIA

120/277

(MULTI-

VOLT)

COOPER LTG

METALUX

QNTY AS

REQUIRED

45W

(NOMINAL

FIXTURE

INPUT

WATTS)

RECESSED,

T-GRID ---

2'x4' LED EDGE-LIT FLAT PANEL, FULLY LUMINOUS

APPEARANCE ACROSS FACE OF THE LENS. PROVIDE

FIXTURE WITH DIMMING CAPABILITIES DOWN TO 1% OF FULL

RATED LUMEN OUTPUT.

(2.2" MAX FIXTURE DEPTH).

[FIXTURE LUMEN OUTPUT ~ 4998 LUMENS]

SATIN

WHITE

LEDS 3500K

(60,000 HRS WITH

97% LUMEN

MAINTENANCE)

L97/60

80+ CRI

EPANL-2x4-4800LM-80CRI-35K-1% DIMMING (0-to-10V)-MVOLT SERIES

24FP4735C-80CRI-35K-1% DIMMING

(0-to-10V)-UNV SERIES

F1D

F2

LITHONIA

120/277

(MULTI-

VOLT)

QNTY AS

REQUIRED

34W

(NOMINAL

FIXTURE

INPUT

WATTS)

SUSPENDED,

AIRCRAFT

CABLE

4' LENGTH LED STRIP LIGHTING FIXTURE WITH WHITE FINISH

AND SNAP-ON FLAT LENS.

[FIXTURE DIMENSIONS: 2-1/8"(H) x 2-3/16"(W) x 48"(L)].

[FIXTURE LUMEN OUTPUT ~ 4585 LUMENS]

SNAP-ON / OFF

FROSTED ,

DIFFUSE,

SYMMETRICAL

DISTRIBUTION

LEDS 4000K

(60,000 HRS WITH

70% LUMEN

MAINTENANCE)

L70/60

80 CRI

ZL1N-L48-SMR-5000LM-FST-

MVOLT-40K-80CRI-WH SERIES

1. COORDINATE THE REQUIRED INSTALLATION HEIGHT

(SUSPENSION ABOVE FINISHED FLOOR) WITH THE ARCHITECT

PRIOR TO START OF ROUGH-IN. PROVIDE ALL REQUIRED

SUPPLEMENTAL STEEL INSTALLATION AS REQUIRED TO INSTALL

FIXTURES IN THE GENERAL LOCATIONS AS INDICATED ON THE

CONTRACT DRAWINGS.

(END OF LIGHTING FIXTURE SCHEDULE)

COOPER LTG

METALUX

F3D

LITHONIA

120/277

(MULTI-

VOLT)

QNTY AS

REQUIRED

31W

(NOMINAL

FIXTURE

INPUT

WATTS)

SUSPENDED,

AIRCRAFT

CABLE

2' LENGTH LED STRIP LIGHTING FIXTURE WITH WHITE FINISH

AND SNAP-ON FLAT LENS. FIXTURE SHALL BE DIMMABLE

DOWN TO 1% OF FULL LUMEN OUTPUT.

[FIXTURE DIMENSIONS: 2-1/8"(H) x 2-3/16"(W) x 24"(L)].

[FIXTURE LUMEN OUTPUT ~ 3666 LUMENS]

SNAP-ON / OFF

FROSTED ,

DIFFUSE,

SYMMETRICAL

DISTRIBUTION

LEDS 3500K

(60,000 HRS WITH

70% LUMEN

MAINTENANCE)

L70/60

80 CRI

ZL1N-L24-SMR-3500LM-FST-1% DIMMING

(0-to-10V)-MVOLT-35K-80CRI-WH SERIES

1. COORDINATE THE REQUIRED INSTALLATION HEIGHT

(SUSPENSION ABOVE FINISHED FLOOR) WITH THE ARCHITECT

PRIOR TO START OF ROUGH-IN. PROVIDE ALL REQUIRED

SUPPLEMENTAL STEEL INSTALLATION AS REQUIRED TO INSTALL

FIXTURES IN THE GENERAL LOCATIONS AS INDICATED ON THE

CONTRACT DRAWINGS.

COOPER LTG

METALUX

F4

EMB2

LED THERMOPLASTIC EMERGENCY LIGHTING UNIT WITH

TWO LED FIXTURE HEADS, INTEGRAL BATTERY BACK-UP

WITH HIGH OUTPUT WITH LITHIUM ION PHOSPHATE

BATTERIES CAPABLE OF 120 MINUTES OF OPERATION ON

LOSS OF NORMAL POWER SOURCE. PROVIDE WITH SELF-

DIAGNOSTICS.

ISOLITE BUG-6-WH-SD SERIES

120/277

(MULTI-

VOLT)

QNTY TWO

FIXTURE

HEADS

(QNTY 3 -

2W LEDS

PER HEAD)

6W PER

LAMP

HEAD

(12W

TOTAL)

SURFACE

WALLLED ---

1. COORDINATE THE REQUIRED INSTALLATION LOCATIONS AND

MOUNTING HEIGHT IN FIELD WITH ALL OTHER INSTALLATION

WITHIN THE INSTALLED ROOMS. AIM FIXTURE HEADS TO PROVIDE

THE MAXIMUM ILLUMINATION ON PATHWAYS AND EQUIPMENT

WHICH REQUIRES INSPECTION AND MAINTENANCE DURING A LOSS

OF NORMAL POWER CONDITION.

LITHONIA

120/277

(MULTI-

VOLT)

QNTY AS

REQUIRED

104W

(NOMINAL

FIXTURE

INPUT

WATTS)

SUSPENDED,

AIRCRAFT

CABLE

8' LENGTH LED STRIP LIGHTING FIXTURE WITH SYMMETRIC

REFLECTORS, WHITE FINISH AND SNAP-ON FLAT LENS.

[FIXTURE DIMENSIONS: 2-1/8"(H) x 2-3/16"(W) x 96"(L)].

[FIXTURE LUMEN OUTPUT ~ 12,933 LUMENS]

SNAP-ON / OFF

FROSTED ,

DIFFUSE,

SYMMETRICAL

DISTRIBUTION

LEDS 4000K

(60,000 HRS WITH

70% LUMEN

MAINTENANCE)

L70/60

80 CRI

TZL1N-L96-SMR-14000LM-FST-

MVOLT-40K-80CRI-WH SERIES

SYMMETRIC,

WHITE

FINISH

1. COORDINATE THE REQUIRED INSTALLATION HEIGHT

(SUSPENSION ABOVE FINISHED FLOOR) WITH THE ARCHITECT

PRIOR TO START OF ROUGH-IN. PROVIDE ALL REQUIRED

SUPPLEMENTAL STEEL INSTALLATION AS REQUIRED TO INSTALL

FIXTURES IN THE GENERAL LOCATIONS AS INDICATED ON THE

CONTRACT DRAWINGS.

COOPER LTG

METALUX

1. PROVIDE WITH QUANTITY OF DIMMER CONTROL SWITCHES AS

INDICATED ON THE CONTRACT DRAWINGS. DIMMER SWITCHES

SHALL BE FULLY COMPATIBLE WITH THE INSTALLED LIGHTING

FIXTURES.

COLUMBIA LTG

CBT24-A-LSCS-EDD-80CRI-35K-1%

DIMMING (0-to-10V) SERIES

ORACLE LTG

4-OC4-LED-5000L-1% DIMMING (0-

to-10V)-MVOLT-40K-85-WHITE SERIES

ORACLE LTG

2-OC4-LED-4000L-1% DIMMING (0-

to-10V)-MVOLT-35K-85-WHITE SERIES1

ORACLE LTG

8-OC4-LED-14000L-1% DIMMING (0-

to-10V)-MVOLT-40K-85-WHITE SERIES

DUAL-LITE EVHC12I-06L (WITH 120 MINUTE

BATTERY BACKUP) WHITE SERIES

4SNLED-LD5-48SL-SLW-UNV-L840-

CD1-U-WHITE SERIES

2SNLED-LD5-30HL-SLW-UNV-L835-CD1-U-

1% DIMMING (0-to-10V)-WHITE SERIES

8TSNLED-LD5-170HL-SLW-UNV-L840-

CD1-U-WHITE SERIES

EVEN-LITE TEBL6W-SD (WITH 120 MINUTE

BATTERY BACKUP) WHITE SERIES

DETAIL - GENSET CONCRETE BASE

NO SCALE

12" 12"

10"

28"

TOP OF PAD SHALL BE

SET AT AN ELEVATION

OF 4" ABOVE ADJACENT

FINISHED GRADE. SLOPE

FINISHED GRADE.1" CHAMFERED EDGE

NOTE: COORDINATE REQUIRED DIMENSIONS WITH GENERATOR SET TO ALLOW

PAD TO EXTEND 12" PAST THE OUTERMOST DIMENSIONS OF THE GENERATOR

AND BASE ON SIDES OF THE GENERATOR SET / ENCLOSURE WHICH DO NOT

REQUIRE ACCESS FOR MAINTENANCE. ON SIDES WHICH DO REQUIRE ACCESS FOR

MAINTENANCE AND INSPECTION, THE BASE SHALL EXTEND A MINIMUM OF 42" PAST

THE OUTER MOST EDGE OF THE GENERATOR SET / ENCLOSURE.

NOTE: IF A PLATFORM(S) ARE REQUIRED TO ACCESS OVERCURRENT PROTECTION

DEVICES, THEN THE BASE SHALL EXTEND A MINIMUM OF 6" PAST THE EDGE OF

THE PLATFORM.

#4's CONT. @ 12" O.C.

EA. WAY

PAD TO DRAIN

#4's @ 12" O.C.

EA. WAY

8" COMPACTED GRANULAR

FILL ON SUITABLE SUBGRADE

CAST IN-PLACE CONCRETE PAD.

4000 PSI W/ 6% ENTRAINED AIR.

PROVIDE LIGHT BROOM FINISH.

3 WIDE BY 3 DEEP DUCTBANK DETAIL

NO SCALE

MASONRY LEVELING

BLOCKS AT BASE

SPACERS AS NEEDED

BASE AND INTERMEDIATE

SPACERS 48" ON CENTER

SCHED 40 PVC CONDUIT

RACEWAY (TYPICAL)

4000 PSI

CONCRETE

#4 REBAR. TYPICAL.

#4 REBAR. TYPICAL.

18" ON CENTER

3" MINIMUM SEPARATION.

TYPICAL.

3" MINIMUM.

TYPICAL.

3" MINIMUM

SEPARATION.

TYPICAL.

1-1/2" MINIMUM

SEPARATION.

TYPICAL.

FINISHED GRADE

DUCTBANK

MARKING TAPE.

TYPICAL.EQUAL

EQUAL

M

IN

IM

U

M

#4 REBAR. TYPICAL.

1' - 6"

6" DIA. GALV. STANDARD

STEEL POST, FILL W/

CONCRETE (PAINT BRIGHT YELLOW)

SEALANT OVER 1/2"

EXPANSION JOINT IN

ASPHALT PAVEMENT

FIBER REINFORCED

CONCRETE FOUNDATION

COAT STEEL W/ BITUMINOUS

PAINT BELOW GRADE

COMPACTED #53 STONE BASE

COMPACTED SUBGRADE OR

BACKFILL, 96% MAX. DENSITY

CROWN CONCRETE FILL

REFLECTIVE BOLLARD TAPE

(2 BANDS) - TYPE 1, BY

REFLECTIVE INC.

CONCRETE WASH

NO SCALE

DETAIL - CONCRETE FILLED

PROTECTION BOLLARD

S

S3a a

"WP"

PHASE

CONDUCTOR

NEUTRAL

GROUND

HOMERUN TO PANEL INDICATED. PREFIX INDICATES PANEL

NOMENCLATURE. NUMBERS INDICATE CIRCUIT NUMBERS.

C1-1

CEILING OUTLET AND LIGHTING FIXTURE AS SCHEDULED.

WALL OUTLET WITH 20A, 125V DUPLEX RECEPTACLE.

MOUNT 18 INCHES ABOVE FINISHED FLOOR TO

CENTER, UNLESS NOTED OTHERWISE.

WALL OUTLET WITH 20A, 125V DOUBLE-DUPLEX RECEPTACLE.

MOUNT 18 INCHES ABOVE FINISHED FLOOR TO CENTER,

UNLESS NOTED OTHERWISE.

SYMBOL INDICATES FIXTURE TYPE WHEN SHOWN ON

LIGHTING PLANS ADJACENT TO FIXTURE SYMBOL. REFER

TO LIGHTING FIXTURE SCHEDULE FOR FIXTURE

REQUIREMENTS.

CIRCUIT. NUMBER OF CROSSBARS INDICATE QUANTITY OF

CONDUCTORS REQUIRED. MINIMUM CONDUIT SIZE SHALL BE 3/4

INCH TRADE SIZE. MINIMUM SIZE CONDUCTORS SHALL BE 12 AWG.

"GFI"

VOICE/DATA OUTLET. MOUNT OUTLET AT SAME HEIGHT AS

ASSOCIATED POWER OUTLET, UNLESS NOTED OTHERWISE.

PROVIDE 1 INCH CONDUIT FROM OUTLET BOX TO NEAREST

ACCESSIBLE CEILING CAVITY. BUSH CONDUIT ENDS. OUTLET

BOX SHALL BE 4" SQUARE BY 2-3/4" DEEP WITH A SINGLE-GANG

PLASTER RING, UNLESS NOTED OTHERWISE.

"C1" - INDICATES PROVIDE ONE DATA CABLE TO OUTLET BOX.

"C2" - INDICATES PROVIDE TWO DATA CABLES TO OUTLET BOX.

"C3" - INDICATES PROVIDE THREE DATA CABLES TO OUTLET BOX.

"C4" - INDICATES PROVIDE FOUR DATA CABLES TO OUTLET BOX.

"B" - INDICATES THE OUTLET LOCATION SHALL BE PROVIDED

WITH A PULL STRING AND A BLANK DEVICE PLATE.

DESCRIPTIONSYMBOL

OUTLET BOX AND 20A, THREE-WAY SWITCH. MOUNT AT 46

INCHES ABOVE FINISHED FLOOR TO CENTER, UNLESS

NOTED OTHERWISE. LOCATE WITHIN 8" OF STRIKE SIDE

OF DOOR, UNLESS NOTED OTHERWISE.

OUTLET BOX AND 20A, SINGLE POLE SWITCH. MOUNT AT

46 INCHES ABOVE FINISHED FLOOR TO CENTER, UNLESS

NOTED OTHERWISE. LOCATE WITHIN 8" OF STRIKE SIDE

OF DOOR, UNLESS NOTED OTHERWISE. LOWER CASE

LETTER INDICATES CIRCUIT SWITCHED.

NOMENCLATURE INDICATES GROUND FAULT INTERRUPTER

TYPE RECEPTACLE WHEN SHOWN PLANS ADJACENT TO

SYMBOL.

OCCUPANCY SENSOR. THE LETTER(S) DESIGNATION NEXT TO

THE SYMBOL (IF SHOWN) INDICATE SWITCHING ZONES TO BE

CONTROLLED VIA THE OCCUPANCY SENSOR. IF A LETTER

DESIGNATION IS NOT SHOWN, THE OCCUPANCY SENSOR SHALL

CONTROL ALL LIGHTING FIXTURES WITHIN THE ROOM.

CEILING OUTLET AND LIGHTING FIXTURE AS SCHEDULED.

a

ELECTRICAL LEGEND

CEILING OUTLET AND LIGHTING FIXTURE AS SCHEDULED.

NOMENCLATURE INDICATES GFI TYPE, OUTDOOR RATED

WEATHER RESISTANT TYPE RECEPTACLE IN CAST ALUMINUM

LOCKABLE TYPE WEATHER-PROOF-WHILE IN-USE ENCLOSURE

WHEN SHOWN ON PLANS ADJACENT TO SYMBOL. O

a

OUTLET BOX AND DIMMER SWITCH RATED FOR

CONNECTED LOAD. MOUNT AT 46 INCHES ABOVE

FINISHED FLOOR TO CENTER, UNLESS NOTED

OTHERWISE. LOCATE WITHIN 8" OF STRIKE SIDE OF

DOOR, UNLESS NOTED OTHERWISE. LOWER CASE

LETTER INDICATES CIRCUIT CONTROLLED.

F1

DESCRIPTIONSYMBOL

OUTLET BOX AND DIMMER SWITCH (WITH INTEGRAL

OCCUPANCY SENSOR) RATED FOR CONNECTED LOAD.

MOUNT AT 46 INCHES ABOVE FINISHED FLOOR TO

CENTER, UNLESS NOTED OTHERWISE. LOCATE WITHIN 8"

OF STRIKE SIDE OF DOOR, UNLESS NOTED OTHERWISE.

LOWER CASE LETTER INDICATES CIRCUIT CONTROLLED.

CEILING MOUNT SMOKE DETECTOR.

AUDIO-VISUAL ALARM DEVICE. FIRE ALARM SYSTEM.

WALL MOUNT AT 80 INCHES A.F.F. TO CENTER, OR 6

INCHES BELOW CEILING TO TOP, WHICHEVER IS LOWER.

F S

F

R E

NI

G

NEAN L

OI

S

E

S

F O R P

E

KENTU

C

K Y

FO

ET

A T S

D

ESNE

L I C

BROCKMAN

18703

J.

A T T

M

HE

W

REVISION HISTORY OF THIS DRAWING

DRAWING NO.

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWN BY

CHECKED BY

PHASE

RTA DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

DRAWING DATE

470-CB72-OC33-00

6/28/2024

06/28/2024

/1

/2

:3 :5

P

M

KCTCS - SWITCHGEAR REPLACEMENT - OWENSBORO COMMUNITY &

TECHNICAL COLLEGE - DOWNTOWN CAMPUS

MJB

6/28/2024

MJB

SITE ELECTRICAL PLAN

E1.0

2401-116

"C" - RTA

1" = 30'-0"

SITE ELECTRICAL PLAN

5'0' 15' 30'

1''=30'-0''

True North

Plan North

Approximate

NOTE: THIS PAD DETAIL WAS FURNISHED TO HAFER BY OMU AND IS INCLUDED ON THIS DRAWING FOR CONTRACTOR'S USE IN THE BIDDING PROCESS. ALL INSTALLATION SHALL BE IN ACCORDANCE WITH OMU. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH OMU PRIOR TO START OF DEMOLITION AND NEW CONSTRUCTION.

ADDENDUM NO. 1 7/22/2024

ADDENDUM NO. 3 8/15/2024

S

S

F S

S

F S

S

F S

F

S

F S

F

S S

SS

F S

F S

NOTE 2.

(OLD PANEL "D" LOCATION)

NOTE 2.

(OLD PANEL "A" LOCATION)

EXISTING PANEL "R"

OLD LOCATION OF REMOVED

MAIN SWITCHBOARD "MSB"

PANEL "M1"

EXISTING PANEL "K1"

OFFICE

7B OFFICE

7A

SMALL

CLASSROOM

7C

CLASSROOM

CLASSROOM

STORAGE

5A

STORAGE

3A

CLASSROOM

3B

CLASSROOM

OFFICE

1D

OFFICE

1A

OFFICE

1B

OFFICE

1C

SKILL

TRAIN

OFFICE

WEST

VESTIBULE

123A

OFFICE

S2

GENERAL

OFFICE

S1

BREAKROOM

OFFICE

S3

OFFICE

S4

OFFICE

S5

OFFICE

S6

NORTH

VESTIBULE

160A

OFFICE

S8

VAULT

S7

LOBBY

WEST

CORRIDOR

MEN

WOMEN

EMPLOYEE

LOUNGE

F1

TOILET

125A

COMM.

TESTING

LAB

TOOLS

6A

STORAGE

6B

OFFICE

2A

COMPUTER

TESTING

COMM.

8A

OFFICE

8B

TOWER

OFFICE

14A

STORAGE

14C

CONTROL

14B

WAITING

STUDIO

14D

OFFICE

14E

CLASSROOM

14F

OFFICE

14H

RADIO

ROOM

14G

M&O

BREAKROOM/STORAGE

13A

WEST

MEN

WEST

CUSTODIAL

WEST

WOMEN

MECHANICAL

13B

PASSAGE

STORAGE

15C

STORAGE

15B

STORAGE

15D

INDUSTRY

INNOVATION

LAB

COMPUTER

LAB /

CLASSROOM

15A

OFFICE

17B

INDUSTRY

INNOVATION

LAB

TOOLS &

STORAGE

17A

NORTH

CORRIDOR

CARPENTRY

SHOP

TOOLS &

STORAGE

19A

OFFICE /

RESOURCE

19B

OFFICE /

RESOURCE

21B

MASONRY

SHOP

STORAGE

21A

OFFICE /

RESOURCE

18C

STORAGE

18D

STORAGE

18E

CLASSROOM

20C

CLASSROOM

20A

OFFICE

20B

OFFICE/STOR

22A SECRETARY

STORAGE

24D

OFFICE

22B

CLO.

106J

STORAGE

24C

HEALTH

OCCUPATIONS

SHOP

FLAMMABLE

LIQUID

STORAGE

STORAGE

MAIN

ELEC

WOMENS

DRESSING

EAST

WOMEN

EAST

MEN

MENS

DRESSING

EAST

CUSTODIAL

150 ART LAB

TOOLS &

STORAGE

25A

OFFICE

25B

CLASSROOM

CLASSROOM

LECTURE

ROOMS 1

& 2

24A

SURGERY

23G

STERILE

PREP

23F

FELINE

WARD

23E

LAB

ANIMAL

23D

CLOS.

23C

EXAM

ROOM

23A

WAITING

BUSINESS

OFFICE

STORAGE

23R

PHARMACY

23Q

CANINE

WARD

23L

UTILITY

ROOM

23N

SURGERY

PREP

23H

IMAGING

23J

CLINICAL

CARE

23S

CORR.

23B

LABORATORY

23P

DENTAL

SUITE

23O

ENTRY

23K

EAST

CORRIDOR

14K

NORTH

CORRIDOR

14L

TRAINING

/ CONF

SPACE

BREAKROOM

12 FIRE

PROTECTION

14I

CLASSROOM

18B

CLASSROOM

18A

CLASSROOM

OFFICES

Room

C1

Room

EXISTING PANEL "K LEFT"

EXISTING PANEL "K RIGHT"

TRANSFORMER "XK"

EXISTING

DISCONNECT

(BOILER)

EXISTING COMBO

STARTER

(OFFICE H.W. PUMP 3)

EXISTING COMBO

STARTER

(H.W. PUMP 4)

EXISTING COMBO STARTER

EXISTING COMBO

STARTER

(AIR COMP.)

DISTRIBUTION PANEL "H".

NOTES 16 & 17.

EXISTING DISC. SW "D100"

EXISTING DISC. SW "D101"

EXISTING

DISCONNECT D102

(GRINDER)

EXISTING

DISCONNECT D103

(DRILL PRESS)

EXISTING PANEL "N1A".

NOTE 9.

EXISTING DISC SW "E"

EXISTING DISC SW "D"

EXISTING DISC SW "C"

EXISTING DISC SW "B"

EXISTING DISC SW "A"

EXISTING PANEL "17"

ENCLOSED CIRCUIT

BREAKER "CBXN1"

DISTRIBUTION

PANEL "N"

EXISTING TRANSFORMER "XN1".

NOTE 34.

NOTES 7 & 28.

(OLD PANEL

"G1" LOCATION)

EXISTING DISC SWITCH

"DS-XRAY" DISTRIBUTION

PANEL "M"

EXISTING PANEL "MM".

NOTE 9.

NOTES 8 & 28.

(OLD PANEL "J1"

LOCATION)

EXISTING TELCOM

SERVICE ENCLOSURE

RELOCATED AIR

COMPRESSOR

(TEMPORARY LOCATION)

PANEL "P21"

PANEL "P22"

EXISTING

DISCONNECT D104

1. COORDINATE THE NEW PANEL INSTALLATION LOCATION WITH THE ASSOCIATED PANEL LOCATION TO BE DEMOLISHED AS REQUIRED TO ALLOW USE OF THE DEMOLISHED PANEL LOCATION BACKBOX TO BE USED AS A

JUNCTION BOX.

2. REWORK AND MODIFY THE DEMOLISHED PANEL BACKBOX AS REQUIRED SO THAT IT CAN BE USED AS A JUNCTION BOX TO REFEED THE EXISTING BRANCH CIRCUITS (REQUIRED TO REMAIN OPERATIONAL) FROM THE NEW PANEL. DISCONNECT AND REMOVE THE PANEL GUTS. CUT BACKBOX ENCLOSURE SUCH THAT THE BACKBOX IS FLUSH WITH THE CORRIDOR FINISHED WALL. REMOVE TRIM IN CORRIDOR INSTALLED AROUND THE PERIMETER OF THE BACK BOX. PROVIDE NEW COVER OVER BACKBOX WHICH COVERS THE BACKBOX AND EXTENDS A

MINIMUM OF 2" PAST ALL EDGES OF THE BACKBOX.

3. COPPER GROUND BUS BAR ON INSULATED STAND-OFF DEVICES. SEE GROUNDING SYSTEM DETAILS AND

GROUNDING SYSTEM RISER DIAGRAM, SHEET E1.0, FOR ADDITIONAL REQUIREMENTS.

4. SAW CUT, REMOVE, REWORK WALL AS REQUIRED TO REMOVE OLD PANEL BACKBOX AND PROVIDE NEW RECESSED (FLUSH WITH CORRIDOR WALL FINISH) JUNCTION BOX. EXTEND, REWORK EXISTING BRANCH CIRCUIT CONDUITS (AND CIRCUITS) AS REQUIRED TO CONNECT TO NEW JUNCTION BOX. PROVIDE NEW BRANCH CIRCUIT CONDUITS & CIRCUITS FROM NEW PANEL WITHIN NEW ELECTRICAL AS REQUIRED TO REFEED EXISTING LOADS.

PATCH AND PAINT WALL TO MATCH EXISTING FINISHES. PROVIDE COVER OVER JUNCTION BOX WHICH COVERS

JUNCTION BOX.

5. USE THE POWER QUALITY / ENERGY METERING EQUIPMENT, JUNCTION BOX WITH FUSE KIT FOR PROTECTION OF THE METERING EQUIPMENT, AND ALL ASSOCIATED CIRCUITS AND ROPE TYPE CTs REMOVED FOR RELOCATION. THE METERING EQUIPMENT AND TIE-IN WITH THE BUILDING MANAGEMENT SYSTEM & ENERGY MONITORING SYSTEM SHALL BE REWORKED AS REQUIRED AND CONNECTED TO THE NEW MAIN DISTRIBUTION SYSTEM. OPERATION OF THE REMOVED METERING/ENERGY MONITORING SYSTEM WHEN REINSTALLED ON THE NEW MAIN DISTRIBUTION SWITCHBOARD SHALL BE AS WAS PRIOR TO START OF DEMOLITION. PROVIDE A 15A, 480V 3PH BRANCH CIRCUIT TO METERING EQUIPMENT FROM A CIRCUIT BREAKER PROVIDED WITHIN THE MAIN DISTRIBUTION SWITCHBOARD. COORDINATE INSTALLATION LOCATION AND MOUNTING HEIGHT SUCH THAT THE SIDE COVERS OF THE NEW MAIN DISTRIBUTION SWITCHBOARD CAN BE REMOVED FOR FUTURE MAINTENANCE /

ACCESS.

6. PROVIDE BUILDING MAIN COPPER GROUND BUS BAR ON INSULATED STAND-OFF DEVICES. SEE GROUNDING SYSTEM DETAILS AND GROUNDING SYSTEM RISER DIAGRAM, SHEET E1.0, FOR ADDITIONAL REQUIREMENTS.

7. PROVIDE NEW PULL / JUNCTION BOXES IN CEILING CAVITY SPACE ABOVE THE OLD PANEL "G1" LOCATION AS REQUIRED TO REFED THE EXISTING LOADS FROM THE NEW PANEL "G1". THE OLD PANEL "G1" SHALL BE DISCONNECTED AND REMOVED COMPLETE. THE BACKBOX SHALL NOT BE REUSED AS A JUNCTION BOX OR PULL

BOX.

8. PROVIDE NEW PULL / JUNCTION BOXES IN CEILING CAVITY SPACE ABOVE THE OLD PANEL "J1" LOCATION AS REQUIRED TO REFED THE EXISTING LOADS FROM THE NEW PANEL "J1". THE OLD PANEL "J1" SHALL BE DISCONNECTED AND REMOVED COMPLETE. THE BACKBOX SHALL NOT BE REUSED AS A JUNCTION BOX OR PULL

BOX.

9. SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS REGARDING THE NEW FEED TO THE

EXISTING PANEL.

10. PROVIDE NEW PULL / JUNCTION BOXES IN CEILING CAVITY SPACE ABOVE THE OLD PANEL "F1" LOCATION AS REQUIRED TO REFED THE EXISTING LOADS FROM THE NEW PANEL "F". THE OLD PANEL "F1" SHALL BE DISCONNECTED AND REMOVED COMPLETE. THE BACKBOX SHALL NOT BE REUSED AS A JUNCTION BOX OR PULL

BOX.

11. SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS REGARDING THE NEW FEED AND FUSIBLE SAFETY DISCONNECT SWITCH TO EXISTING KILN EQUIPMENT. COORDINATE THE REQUIRED INSTALLATION LOCATION IN FIELD. PROVIDE FUSING PER THE EQUIPMENT MANUFACTURER'S REQUIREMENTS.

PROVIDE FINAL CIRCUIT FROM DISCONNECT SWITCH TO KILN EQUIPMENT PER NEC AND EQUIPMENT

MANUFACTURER'S REQUIREMENTS.

12. SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS REGARDING THE NEW FEED TO THE

EXISTING COMBINATION MOTOR CONTROLLER.

13. REWORK THE CIRCUIT RACEWAYS AS REQUIRED AND PROVIDE NEW CIRCUIT CONDUCTORS AND RACEWAY EXTENSION REQUIRED TO FEED THE EXISTING LOADS ORIGINALLY FED FROM REMOVED PANEL "D1" FROM THE NEW PANEL "B". PROVIDE NEW BRANCH CIRCUIT CONDUCTORS THE ENTIRE LENGTH FROM CIRCUIT BREAKER TO

THE EXISTING LOADS.

14. PROVIDE PULL-BOX (FLUSH MOUNTED WITHIN NEW FURRED-OUT WALL) IN LOCATION AS REQUIRED TO CONNECT TO THE REMOVED PANEL "B" TUB. PROVIDE CONDUIT RACEWAYS FROM NEW PULL-BOX TO EXISTING TUB, AND FROM THE NEW PULL-BOX TO THE NEW PANEL "B" AS REQUIRED TO REFEED THE EXISTING LOADS

ORIGINALLY FED FROM THE REMOVED PANEL "B" FROM THE NEW PANEL "B".

15. USE THE BACK-BOX OF THE REMOVED PANEL "H" AS A SPLICE BOX FOR REFEEDING THE EXISTING LOADS

ORIGINALLY FED FROM PANEL "H". PROVIDE NEW BLANK COVER ON BACKBOX.

16. PROVIDE NEW FEEDER CIRCUIT (CONDUIT AND CONDUCTORS) FROM THE NEW MAIN DISTRIBUTION SWITCHBOARD TO THE NEW PANEL "H". REFEED THE EXISTING LOADS FED FROM THE REMOVED PANEL "H" FROM THE NEW PANEL "H". SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS.

17. PROVIDE SUPPORT STRUCTURE AS REQUIRED FOR SUPPORT OF DISTRIBUTION PANEL. SECURE STRUCTURE

TO FLOOR AT THE BOTTOM AND TO THE BUILDING STRUCTURE AT THE TOP.

18. PROVIDE STRUCTURAL STEEL TYPE SUPPORT STRUCTURE AS REQUIRED TO INSTALL TRANSFORMER "XNATS700" ABOVE TRANSFORMER "XNATS702". INSTALL SUCH THAT THE BOTTOM OF TRANSFORMER "XNATS700" IS A MINIMUM OF 24" ABOVE THE TOP OF TRANSFORMER "XNATS702" TO ENSURE ADEQUATE VENTILATION.

SEISMICALLY SECURE THE STRUCTURE TO THE FLOOR AT BOTTOM AND TO THE STRUCTURE WALL & BUILDING

STEEL AT TOP.

19. PROVIDE STRUCTURAL STEEL TYPE SUPPORT STRUCTURE AS REQUIRED TO INSTALL PANELS AND SUPPORT TRANSFORMERS "XEH1(700)" & "XEH1(702)" ABOVE THE ASSOCIATED PANELS FED BY EACH TRANSFORMER.

SEISMICALLY SECURE THE STRUCTURE TO THE FLOOR AT BOTTOM AND TO THE STRUCTURE WALL & BUILDING

STEEL AT TOP.

20. PROVIDE ALL REQUIRED CIRCUITS BETWEEN THE REMOTE ANNUNCIATORS AND THE GENSET AND ATSs AS REQUIRED FOR CORRECT OPERATION. FLUSH MOUNT WITHIN THE WALL. PROVIDE ALL REQUIRED CUTTING, PATCHING, REPAIR AND FINISHING/PAINTING TO MATCH EXISTING WALL FINISHES. COORDINATE THE INSTALLATION LOCATION IN THE FIELD WITH OWNER PRIOR TO START OF DEMOLITION AND ROUGH-IN.

21. PROVIDE SURFACE METAL RACEWAY SYSTEM TO FEED NEW RECEPTACLE(S) SHOWN TO BE INSTALLED ON EXISTING CMU WALLS. RECEPTACLES INSTALLED WITHIN NEW WALLS SHALL BE INSTALLED FLUSH WITHIN NEW

WALL.

22. TEMPORARILY FEED RECEPTACLES IN ROOM FROM A 20A BRANCH CIRCUIT IN EXISTING PANEL "D" WHICH HAS AVAILABLE CAPACITY. PROVIDE THE FINAL FEED TO RECEPTACLES FROM THE NEW PANEL AND CIRCUIT AS

INDICATED AFTER THE NEW PANEL HAS BEEN INSTALLED AND ENERGIZED.

23. PROVIDE STAINLESS STEEL SUPPORT STRUCTURE AS REQUIRED AND PROVIDE NEMA 3R FUSIBLE SAFETY DISCONNECT SWITCH NEAR ASSOCIATED CHILLER. COORDINATE THE REQUIRED INSTALLATION LOCATION IN THE FIELD. INSTALL IN LOCATION AS REQUIRED TO PROVIDE ALL CODE REQUIRED CLEARANCES AND CLEARANCES REQUIRED FOR PROPER OPERATION AND MAINTENANCE OF CHILLER. SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS. REWORK THE EXISTING ELECTRICAL INSTALLATION AROUND THE CHILLER AS

REQUIRED TO ACCOMMODATE THE PROJECT NEW CONSTRUCTION REQUIREMENTS.

24. PROVIDE POWER CIRCUIT TO SWITCH FROM 277V BRANCH CIRCUIT WHICH FED THE LIGHTING FIXTURES

WITHIN THE ROOM PRIOR TO START OF DEMOLITION.

25. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SAW CUTTING, DIGGING, TRENCHING, BACK-FILLING, PATCHING, AND CONCRETE INSTALLATION WITH THE GENERAL CONTRACTOR.

PROVIDE ALL REQUIRED DEMOLITION AND NEW CONSTRUCTION WORK AS REQUIRED TO INSTALL NEW UNDERGROUND NORMAL POWER, EMERGENCY POWER, AND COMMUNICATION & CONTROL CIRCUITS BELOW GRADE FROM THE UTILITY TRANSFORMER AND EMERGENCY GENERATOR LOCATIONS TO THE ASSOCIATED

EQUIPMENT INSTALLED WITHIN THE BUILDING MAIN ELECTRICAL ROOM.

26. PROVIDE STRUCTURAL STEEL TYPE SUPPORT STRUCTURE AS REQUIRED TO INSTALL DISTRIBUTION EQUIPMENT. SEISMICALLY SECURE THE STRUCTURE TO THE FLOOR AT BOTTOM AND TO THE STRUCTURE WALL &

BUILDING STEEL AT TOP.

27. PROVIDE NEW PULL / JUNCTION BOXES IN CEILING CAVITY SPACE ABOVE THE OLD PANEL "B1" LOCATION AS REQUIRED TO REFED THE EXISTING LOADS FROM THE NEW PANEL "B1". THE OLD PANEL "B1" SHALL BE DISCONNECTED AND REMOVED COMPLETE. THE BACKBOX SHALL NOT BE REUSED AS A JUNCTION BOX OR PULL

BOX.

28. PAINT WALL TO MATCH FINISH COLOR OF THE ADJACENT WALL FINISH (I.E IN LOCATIONS WHERE REMOVAL

OF PANEL BACKBOX AND CONDUITS EXPOSE A DIFFERENT WALL FINISH COLOR).

29. PROVIDE STRUCTURAL STEEL TYPE SUPPORT STRUCTURE AS REQUIRED TO INSTALL CIRCUIT BREAKERS AND T.C. PANEL. SEISMICALLY SECURE THE STRUCTURE TO THE FLOOR AT BOTTOM AND TO THE STRUCTURE

WALL & BUILDING STEEL AT TOP.

30. PROVIDE DEDICATED 120V, 20A BRANCH CIRCUIT TO T.C. PANEL FROM EMERGENCY POWER PANEL "EL1(702)"

CIRCUIT NO. 3 USING 2#12, 1#12G IN 3/4"C.

31. PROVIDE "C1" DATA OUTLET NEAR T.C. PANEL FOR NETWORK CONNECTION TO T.C. PANEL. COORDINATE THE INSTALLATION LOCATION AND MOUNTING HEIGHT WITH THE REQUIREMENTS FOR THE T.C. PANEL INSTALLATION.

PROVIDE DATA CABLE FROM THE NEAREST DATA ROOM. COORDINATE ALL DATA INSTALLATION WITH THE

OWNER'S I.T. PERSON PRIOR TO START OF PROJECT.

32. INSTALL SAFETY DISCONNECT SWITCH FOR EXHAUST FAN "EF-9" (FURNISHED BY MECHANICAL CONTRACTOR & INSTALLED BY ELECTRICAL CONTRACTOR). PROVIDE POWER CIRCUIT TO EXHAUST FAN (THRU SAFETY DISCONNECT SWITCH) FROM THE SAME CIRCUIT WHICH FED AND CONTROLLED THE EXHAUST FAN PRIOR TO

START OF DEMOLITION. SEE MECHANICAL PLANS FOR ADDITIONAL REQUIREMENTS.

33. SPARE FUSE CABINET. INSTALL SPARE FUSE CABINET REMOVED FOR RELOCATION IN THIS GENERAL AREA.

34. SEE ONE-LINE DIAGRAM, SHEET E3.2, FOR ADDITIONAL REQUIREMENTS.

35. CUT-OFF / GRIND CONDUITS AT FLOOR. FILL-IN WITH CONCRETE AS REQUIRED TO PROVIDE A SMOOTH AND

SAFE WALKING SURFACE.

NOTES:

PANEL "A".

NOTE 1.

TRANSFORMER "XLDPD"

DIST PANEL "LDPD"

PANEL "D".

NOTE 1.

CIRCUIT BREAKER

"CB-LDPD"

CIRCUIT BREAKER

"CB-XLDPD"

NOTE 3

NOTE 2.

(OLD PANEL "B" LOCATION)

PANEL "B".

TRANSFORMER

"XLDPB"

DIST PANEL

"LDPB"

CIRCUIT

BREAKER

"CB-LDPB" CIRCUIT BREAKER

"CB-XLDPB"

NOTE 2.

(OLD PANEL "G" LOCATION)

PANEL "G".

NOTE 1.

NOTE 2.

(OLD PANEL "F" LOCATION)

PANEL "F".

NOTE 1.

TRANSFORMER

"XLDPF"

DIST PANEL

"LDPF"

CIRCUIT BREAKER

"CB-LDPF"

CIRCUIT BREAKER

"CB-XLDPF"

NOTE 3

NOTE 4.

(OLD PANEL

"C" LOCATION)

PANEL "C"

TRANSFORMER "XLDPJ"

DIST PANEL "LDPJ"

PANEL "J"

CIRCUIT BREAKER

"CB-LDPJ"

CIRCUIT BREAKER

"CB-XLDPJ"

NOTE 3

NOTE 5

NOTE 6

CIRCUIT BREAKER "CB-XK"

PANEL "G1"

PANEL "J1"

NOTES 10 & 28.

(OLD PANEL "F1"

LOCATION)

NOTE 4.

(OLD PANEL

"J" LOCATION)

EXISTING COMBINATION

MOTOR STARTER

"CMS-A/C OFFICE".

NOTE 12. NOTES 13 & 28.

(OLD PANEL

"D1" LOCATION) NOTE 14

EXISTING DISC. SW "TRAINER 1"

EXISTING DISC. SW "TRAINER 2"

EXISTING DISC. SW "TRAINER 3"

EXISTING DISC SW "F2"

NOTES 27 & 28.

(OLD PANEL

"B1" LOCATION)

PANEL "B1".

NOTE 15.

(OLD PANEL "H" LOCATION)

DISC SW

"DS-KILN#1".

NOTE 11.

DISC SW

"DS-KILN#2".

NOTE 11.

RTU-1

EXISTING AIR HANDLING UNIT

"RTU-1" & DISC SW "DS-RTU-1".

EXISTING

DISC SWITCH

"DS-CU-1"

EXISTING DISC SW FOR

SMALL CONDENSING UNIT

SEE ENLARGED ELEC PLAN - MEZZ RM 23,

THIS SHEET FOR ADDITIONAL

REQUIREMENTS ON MEZZANINE LEVEL.

SEE ENLARGED ELEC PLAN - MEZZ RM 25,

THIS SHEET FOR ADDITIONAL

REQUIREMENTS ON MEZZANINE LEVEL.

RELOCATED AIR

COMPRESSOR

(FINAL LOCATION)

AUTO-TRANSFER

SWITCH "ATS700"

AUTO-TRANSFER

SWITCH "ATS702"

CIRCUIT BREAKER "NCB-ATS700"

CIRCUIT BREAKER "NCB-ATS702"

CIRCUIT BREAKER "ECB-ATS702"

CIRCUIT BREAKER "ECB-ATS700"

SEE ENLARGED ELEC PLAN -

RM 24E, THIS SHEET FOR

ADDITIONAL REQUIREMENTS.

SEE ENLARGED ELEC PLAN -

RM 19E, THIS SHEET FOR

ADDITIONAL REQUIREMENTS.

SEE ENLARGED ELEC PLAN -

RM 14E, THIS SHEET FOR

ADDITIONAL REQUIREMENTS.

SEE ENLARGED ELEC PLAN - RMS

1A, 1B & 1E, THIS SHEET FOR

ADDITIONAL REQUIREMENTS.

PANELBOARD "ELDP1(700)".

PANELBOARD "ELDP1(702)".

PANEL "EL1(702)"

PANEL "EH1(702)" [NEC702]

PANEL "EH1(700)" [NEC700]

PANEL "EL1(700)"

NOTE 19

GENERATOR & ATSs REMOTE

ANNUNCIATOR PANELS.

NOTE 20.

ELEC

1E

ELEC

14E

ELEC

19E

ELEC

24E

DISCONNECT SWITCH

"DS-CHILLER #2".

NOTE 23.

DISCONNECT SWITCH

"DS-CHILLER #1".

NOTE 23.

MAIN SWITCHBOARD "MHSB"

NOTE 25

NOTE 25

NOTE 35

NOTE 35

NOTE 35

NOTE 35

NOTE 35

TRANSFORMERS "XEH1(700)" & "XEH1(702).

NOTE 18.

CIRCUIT BREAKER "CBXEH2(702)"

TRANSFORMER "XEH2(702)"

PANEL "EH2(702)"

PANEL "EL2(702)"

CIRCUIT BREAKER "CB-KLEFT"

EXISTING

TRANSFORMER

"XVET"

EXISTING DISC

SW "DSVET"

EXISTING PANEL "VET 1"

EXISTING

PANEL "VET"

EXISTING

PANEL "ZZ"

CIRCUIT BREAKER "CB-XVET".

PROVIDE SUPPORT

STRUCTURE BEHIND CIRCUIT

BREAKER AS REQUIRED

INSTALL CIRCUIT BREAKER

ABOVE THE EXISTING

TRANSFORMER WITH THE

FRONT OF THE CIRCUIT

BREAKER BEING THE SAME

DISTANCE FROM THE BLOCK

WALL AS THE FRONT OF THE

TRANSFORMER.

TRANSFORMER "XM1"

CIRCUIT BREAKER "CB-XM1"

CIRCUIT BREAKER "CB-M1"

OFFICE

1C

OFFICE

1B

OFFICE

1A

OFFICE

1D

SKILL

TRAIN

OFFICE

NOTE 2.

(OLD PANEL "D" LOCATION)

NOTE 2.

(OLD PANEL "A" LOCATION)

PANEL "A".

NOTE 1.

TRANSFORMER "XLDPD"

DIST PANEL "LDPD"

PANEL "D".

NOTE 1.

CIRCUIT BREAKER

"CB-LDPD"

CIRCUIT BREAKER

"CB-XLDPD"

NOTE 3

EX

EX

EX

EX

EX

EX

F1D F1D

F1D F1D

F2

F2

F2

ELEC

1E

PROVIDE POWER CIRCUIT TO

LIGHTING FIXTURES WITHIN THIS

ROOM FROM THE SAME BRANCH

CIRCUIT WHICH FED THE LIGHTING

FIXTURES WITHIN THIS SPACE

PRIOR TO START OF DEMOLITION.

C2

C2

C2

C2

D-38.

NOTE 22.

D-40.

NOTE 22.

NOTE 21. TYPICAL, ALL

RECEPTACLE LOCATIONS.

D-42

CIRCUIT BREAKER "CBXEH2(702)"

TRANSFORMER "XEH2(702)"

PANEL "EH2(702)"

PANEL "EL2(702)"

PROVIDE POWER CIRCUIT TO

LIGHTING FIXTURES WITHIN THIS

ROOM FROM THE SAME BRANCH

CIRCUIT WHICH FED THE LIGHTING

FIXTURES WITHIN THIS SPACE

PRIOR TO START OF DEMOLITION.

CARPENTRY

SHOP

TOOLS &

STORAGE

19A

NOTE 2.

(OLD PANEL "G" LOCATION)

PANEL "G".

NOTE 1.NOTE 2.

(OLD PANEL "F" LOCATION)

PANEL "F".

NOTE 1.

TRANSFORMER "XLDPF"

DIST PANEL "LDPF"

CIRCUIT BREAKER "CB-LDPF"

CIRCUIT BREAKER "CB-XLDPF"

NOTE 3

PANEL "G1"

F2 F2

ELEC

19E

PROVIDE POWER CIRCUIT TO LIGHTING FIXTURES

WITHIN THIS ROOM FROM THE SAME BRANCH CIRCUIT

WHICH FED THE LIGHTING FIXTURES WITHIN THIS

SPACE PRIOR TO START OF DEMOLITION.

G1-9

USE LIGHTING FIXTURE REMOVED FOR

RELOCATION. RELOCATE LIGHTING

FIXTURE AS REQUIRED TO BE FULLY

ACCESSIBLE FROM THE MEZZANINE

LEVEL. CONNECT TO CIRCUIT WHICH FED

AND CONTROLLED LIGHTING FIXTURE

PRIOR TO START OF DEMOLITION.

USE LIGHTING FIXTURE REMOVED FOR

RELOCATION. RELOCATE LIGHTING FIXTURE AS

REQUIRED TO BE FULLY ACCESSIBLE FROM THE

MEZZANINE LEVEL. CONNECT TO CIRCUIT WHICH

FED AND CONTROLLED LIGHTING FIXTURE PRIOR

TO START OF DEMOLITION.

GFI

OFFICE

14A

PANEL "B".

TRANSFORMER "XLDPD"

DIST PANEL "LDPB"

CIRCUIT BREAKER

"CB-LDPB"

CIRCUIT BREAKER "CB-XLDPB"

PANEL "B1".

F1D

F1D

F1D

F1D

F2

F2

PROVIDE POWER CIRCUIT TO LIGHTING

FIXTURES WITHIN THIS ROOM FROM THE

SAME BRANCH CIRCUIT WHICH FED THE

LIGHTING FIXTURES WITHIN THIS SPACE

PRIOR TO START OF DEMOLITION.

B1-1

GND

NOTE 3

EX

PROVIDE POWER CIRCUIT TO NEW RECEPTACLE WITHIN THIS

ROOM FROM THE SAME BRANCH CIRCUIT WHICH FED THE

RECEPTACLES IN THE ROOM PRIOR TO START OF DEMOLITION.

TYPICAL, ALL LOCATIONS, THIS ROOM.

PROVIDE DATA OUTLET AND DATA CABLE FROM THE SAME DATA

ROOM WHICH FED THE DATA OUTLET IN ROOM PRIOR TO START

OF DEMOLITION. TYPICAL, ALL LOCATIONS, THIS ROOM.

C2

EX

ELEC

14E

NOTE 2.

(OLD PANEL "B" LOCATION)

NOTE 14

CLO.

106J

DISPLAY

CASE

106I

STORAGE

24C

PANEL "C"

TRANSFORMER "XLDPJ"

DIST PANEL "LDPJ"

PANEL "J"

CIRCUIT BREAKER

"CB-LDPJ"

CIRCUIT BREAKER

"CB-XLDPJ"

PANEL "J1"

O

NOTE 3

GND

F2F2

F1D

ELEC

24E

F3D a aa b b

PROVIDE POWER CIRCUIT TO LIGHTING

FIXTURES / SWITCH WITHIN THIS ROOM

FROM THE SAME BRANCH CIRCUIT WHICH

FED THE LIGHTING FIXTURES WITHIN THIS

SPACE PRIOR TO START OF DEMOLITION.

PROVIDE POWER CIRCUIT TO LIGHTING

FIXTURES / SWITCHES WITHIN THIS ROOM

FROM THE SAME BRANCH CIRCUIT WHICH

FED THE LIGHTING FIXTURES WITHIN THIS

SPACE PRIOR TO START OF DEMOLITION.

J1-11

J1-9

J1-13

MAIN

ELEC

WOMENS

DRESSING

EAST

CORRIDOR

14K

EXISTING PANEL "R"

OLD LOCATION OF

REMOVED MAIN

SWITCHBOARD "MSB"

EXISTING TELCOM

SERVICE ENCLOSURE

RELOCATED AIR

COMPRESSOR

(TEMPORARY LOCATION)

NOTE 5

NOTE 6

RELOCATED AIR

COMPRESSOR

(FINAL LOCATION)

AUTO-TRANSFER SWITCH "ATS700"

AUTO-TRANSFER SWITCH "ATS702"

CIRCUIT BREAKER "NCB-ATS700"

CIRCUIT BREAKER "NCB-ATS702"

CIRCUIT BREAKER

"ECB-ATS702".

NOTE 26.

CIRCUIT BREAKER

"ECB-ATS700".

NOTE 26.

PANELBOARD "ELDP1(700)"

PANELBOARD "ELDP1(702)".

PANEL "EL1(702)"

PANEL "EH1(702)" [NEC702]

PANEL "EH1(700)" [NEC700]

PANEL "EL1(700)"

NOTE 19

F4

F4

F4

F4

F4

F4

F4

EH1(700)-4

EMB2

EMB2

EMB2

EMB2

a

3a

MAIN SWITCHBOARD "MHSB"

a a a a

NOTE 24

3b b b b

NOTE 25

SPACE RESERVED FOR FUTURE

SWITCHBOARD SECTION

T.C. PANEL.

NOTES 30 & 31.

NOTE 29

NOTE 32

NOTE 33

TRANSFORMERS "XEH1(700)" & "XEH1(702).

NOTE 18.

R E

NI

G

NEAN L

OI

S

E

S

F O R P

E

KENTU

C

K Y

FO

ET

A T S

D

ESNE

L I C

BROCKMAN

18703

J.

A T T

M

HE

W

REVISION HISTORY OF THIS DRAWING

DRAWING NO.

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWN BY

CHECKED BY

PHASE

RTA DATE

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

DRAWING DATE

470-CB72-OC33-00

6/28/2024

06/28/2024

/1

/2

:3 :5

P

M

KCTCS - SWITCHGEAR REPLACEMENT - OWENSBORO COMMUNITY &

TECHNICAL COLLEGE - DOWNTOWN CAMPUS

MJB

6/28/2024

MJB

ELECTRICAL PLAN - FIRST FLOOR

E2.1

2401-116

"C" - RTA

1/16" = 1'-0"

ELECTRICAL PLAN - FIRST FLOOR

4'0' 8' 16'

1/16''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN

- MEZZ RM 23

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN

- MEZZ RM 25

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN

- RMS 1A, 1B & 1E

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN

- RM 19E

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN - RM 14E

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN

- RM 24E

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

1/8" = 1'-0"

ENLARGED ELEC PLAN -

MAIN ELEC RM 153

2'0' 4' 8'

1/8''=1'-0''

True North

Plan North

ADDENDUM NO. 3 8/15/2024

Addendum Three
Addendum No.3 Letter and attachments
Addendum No. 3 Verbage Letter
E1.0 Rev 2
E2.1 Rev 1

File details come from the government source that posted it. Updated .