This Addendum No. One modifies the Request for Bid (RFB) No. 22-0042 issued by the Columbus Consolidated Government's Finance Department Purchasing Division in Columbus, Georgia for the procurement of side loader 31-yard refuse truck bodies. The RFB seeks bids from qualified vendors to provide a minimum of thirty (30) but not to exceed forty (40) side loader refuse truck bodies manufactured to fit Peterbilt 520 Dual Steer cab and chassis. The addendum, dated June 24, 2022, clarifies specifications and responds to vendor questions regarding the procurement requirements. Key specification changes include revised lighting requirements specifying LED FMVSS #108 clearance lights, strobe lights, and reflectors in accordance with federal and State ICC Motor Vehicle Safety Standards, and modification of warranty requirements to a 3-year or 36,000-mile manufacturer's warranty with all warranty work to be provided on-site or towed to a service center within a 150-mile radius.

The addendum addresses eight clarifications submitted by vendors, establishing that chain lift mechanisms are required rather than cylinder lifting mechanisms, strobe lights are mandatory, front mount vane pump systems are acceptable though hot shot systems are preferred, and lifting and gripping mechanisms must be mounted directly to the chassis frame rails rather than to the body frame rails. The addendum confirms that Peterbilt chassis delivery is estimated at 120 days and that either full-eject or dump body configurations are acceptable. Vendors must acknowledge receipt of this addendum with their sealed bid submission, and failure to do so may result in the proposal being deemed incomplete. The vendor must maintain a minimum of $100,000 in parts inventory at the designated service center location to support warranty work requirements.

Text of this file

RFB No. 22-0042 Page 1 of 3 Addendum No. One

Treet

FINANCE DEPARTMENT

PURCHASING DIVISION 100 TENTH STREET, P. O. BOX 1340

COLUMBUS, GEORGIA 31902-1340

706-225-4087, Fax 706-225-3033

BidLine 706-225-4536 www.columbusga.org

June 24, 2022

Addendum No. One

Side Loader 31-Yard Refuse Truck Bodies RFB No. 22-0042

Acknowledgment of receipt of Addenda must be included with sealed Bid.

Initials: Company:

Vendors are informed that the above subject Request for Bid (RFB) is hereby modified, corrected, or supplemented as specified, described and set forth in this Addendum:

A. Changes to the Specifications:

REVISED DETAILED SPECIFICATIONS VENDOR’S SPECIFICATIONS

15. LIGHTS: LED FNVSS #108 clearance lights, strobe lights and reflectors. All lights reflectors shall be in accordance with federal and State I.C.C. Motor Vehicle Safety Standards.

33. WARRANTY: Body shall be fully warranted against defective materials and workmanship for not less than 36 months or 36,000 miles from date of placement into service by the Columbus Consolidated Government. Due to current staffing issues, the Columbus Consolidated Governments Fleet Maintenance can no longer perform warranty work. All warranty work must be provided on site or towed to a service center within a 150-mile radius. Vendor must maintain a minimum of 100,000.00 dollars in parts inventory for the body that is being bid. These parts must be located at the service center where warranty work is to be completed.

34. PREVENTIVE MAINTENANCE

WARRANTY: A standard 2-year manufacturer’s warranty to include a 3-year extended warranty is requested.

DELETED - there is no preventative maintenance on the body of these trucks.

COLUMBUS CONSOLIDATED GOVERNMENT

Georgia’s First Consolidated Government

RFB No. 22-0042 Page 2 of 3 Addendum No. One

B. City’s response to submitted request for clarification:

1. Question: “Page 16, Item #9 – Is a cylinder lifting mechanism acceptable in lieu of chain lift?”

Response: No, the user department wants a chain lift.

2. Question: “Page 16, Item #15 – Previous bid mentioned strobe lights in this section. Are rear strobe lights not required?”

Response: Strobe Lights are required.

3. Question: “Page 17, Item #24 – Is front mount vane pump system acceptable? (Was approved for previous bid per Addendum No. 1, question 38, dated 2/24/22).”

Response: It is acceptable, but a hot shot is preferred if possible due to the placement of the tow hook for the front bumper.

4. Question: “Page 19, Item #33 – Is it acceptable for CES representatives to drive vehicles to repair site in lieu of towing?”

Response: Yes.

5. Question: “Page 19, Item #34 – Does the city want a three-year body warranty as mentioned in #33 or a 5-year body warranty? Also, what is meant by preventative maintenance warranty?”

Response: The City wants a 3-year body warranty and disregard the preventative maintenance warranty.

6. Question: “What is the current estimated time of delivery of the Peterbilt chassis to the body plant?”

Response: Peterbilt initially responded with 360 days but since has revised that to 120 days.

7. Question: “Does the City want a full-eject body or a dump body?”

Response: Either body is acceptable.

8. Question: “Line Item #8 Lifting and Gripping Mechanism states ‘The arm base shall be mounted directly to the chassis frame rails.’ Amrep’s lifting and gripping mechanism mounts directly to the body frame rails. 1. This mounting position provides less ‘shaking/rocking’ when dumping cans, reduces driver fatigue and chassis wear and tear. 2. This mounting position is preferred for full eject push out to dump trucks. Full Eject Truck Bodies are safer in landfills eliminating the possibility of truck roll overs. Will arms that are mounted to the body on top of the frame be acceptable?”

Response: No ASL arms mounted to the body will be accepted. The City has specified that the lifting and gripping mechanism must be mounted to the chassis frame.

RFB No. 22-0042 Page 3 of 3 Addendum No. One

C. Addendum Acknowledgement

Indicate that your company has received this Addendum in the appropriate areas and include with sealed Bid. Failure to acknowledge receipt of this addendum may render your Proposal “Incomplete”.

Andrea J. McCorvey Purchasing Division Manager

Other files

File Type Posted
Addendum No. Three —
Addendum No. Seven —
Addendum No. —
Addendum No. Five —
Addendum No. Eight —
Addendum No. Six —
Award Information —
Addendum No. Four —
Addendum No. Two —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .