This is Addendum No. 4 to a federal-aid highway resurfacing project issued by the Hawaii Department of Transportation for Kalanianaole Highway from Makai Pier to Hanauma Bay Road (Federal-Aid Project NH-072-1(057)). The scope of work includes cold planing, resurfacing, reconstruction of weakened pavement areas, widening paved shoulders, upgrading grated inlets and culverts, repairing headwalls, upgrading guardrails with new end treatments, installing new crosswalks and centerline markings, creating milled rumble strips, and adjusting utility manholes. A virtual pre-bid conference is scheduled for August 25, 2026 at 9:00 a.m. HST, with interested bidders required to contact Project Manager Robert Sun at robert.sun@hawaii.gov by one working day prior to receive meeting details. Requests for Information are due September 4, 2026 at 2:00 p.m. HST, and proposals must be submitted through the Hawaii eProcurement System (HIePRO) by September 15, 2026 at 2:00 p.m. HST.

The estimated construction cost ranges from $32,000,000 to $33,000,000 and is funded through federal-aid highway sources subject to Davis-Bacon prevailing wage requirements. Contractors must hold a State of Hawaii General Engineering "A" license prior to contract award and perform at least 30 percent of work with their own organization unless specialty items are designated otherwise. The project requires compliance with 49 CFR Part 26 Disadvantaged Business Enterprise program requirements, Hawaii Revised Statutes Chapter 103D, and federal nondiscrimination and environmental standards. Weekly certified payroll documentation and detailed labor records for three years post-completion are mandatory. A valid Renewal Notice of General Permit Coverage for stormwater discharge is in effect through January 28, 2029, requiring compliance with Storm Water Pollution Prevention Plan requirements and notification to the Department of Health of construction start and cessation dates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HENRY KENNEDY

Engineering Program Manager

FEDERAL-AID

PROJECT NO. NH-072-1(057)

ADDENDUM NO. 4

FEDERAL-AID

PROJECT NO. NH-072-1(057)

ADDENDUM NO. 4

File details come from the government source that posted it. Updated .