Addendum No. 4.pdf
PDF 348 KB Posted
- Attached to
- IFB-2024-W-003 TP1 Roof Replacement
- Solicitation number
- IFB-2024-W-003
- Issued by
- Pueblo County, Pueblo City, Colorado
About this file
Addendum No. Four is a document issued by the Pueblo West Metropolitan District for IFB 2024-W-003, a TP1 Roof Replacement project. The addendum addresses ten specific questions from potential bidders regarding the roof replacement at the Water Treatment Plant, covering topics such as substrate identification, warranty requirements, skylight cover materials, security camera removal, and lightning protection. The document indicates a mandatory pre-bid meeting was held on Wednesday, April 17, 2024, at 2:00 p.m. MT, with 12 roofing and construction companies represented.
The project requires a comprehensive roof replacement involving demolition of existing Modified Bitumen roofing and installation of a new TPO Mechanically Attached Roofing System. Key warranty requirements include a 5-year workmanship warranty and a 20-year No Dollar Limit (NDL) Manufacturer's warranty covering material and labor. Bidders must provide detailed information about installation methods, material substitutions, and comply with specific manufacturer certifications. The addendum notes that no core samples have been taken, leaving some substrate details uncertain and to be determined during the demolition process. Contractors must include electrical work coordination, lightning protection system handling, and comprehensive cleanup in their bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 2.pdf | ||
| IFB-2024-W-003 TP1 Roof Replacement.pdf | ||
| Addendum No. 1.pdf | ||
| Addendum No. 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. FOUR
IFB 2024-W-003
TP1 Roof Replacement
APRIL 30, 2024
QUESTION #1:
Please identify the sub straight under each area.
RESPONSE #1:
No cores have been taken; therefore, we do not know what the sub straight under each area is.
QUESTION #2:
Is there anything between existing sub straight and current roofing i.e. insulation?
RESPONSE #2:
No cores have been taken; therefore, we do not know what is under each area.
QUESTION #3:
Can we install using a different installation system the RinoBond as long as the warranty requirements are met?
RESPONSE #3:
If the substitution meets the requirements for the project, a substitution would be considered and reviewed. The Contractor/Manufacturer will need to provide information demonstrating the ability to comply with each of the Manufacturer Certifications (Spec Section 1.03 Sub-Section B).
QUESTION #4:
Detail and info for vent replacement in Area 3?
RESPONSE #4
Details are not available at this time. This will be determined during the demo process.
QUESTION #5:
Detail for conduit reinstallation.
RESPONSE #5:
Install per manufacturer’s recommendations/details.
QUESTION #6:
Has BUR material been tested for asbestos?
RESPONSE #6:
BUR material has not been tested for asbestos.
QUESTION #7:
Can 20 GA metal in place of the ½” plywood be used in translucent skylight covers?
RESPONSE #7:
The replacement of ½” plywood with 20-gauge metal may be considered a substitute in the translucent skylights; however, please bid the project with ½” plywood at this time.
QUESTION #8:
Our agreement with the roofing manufacturer is we carry a 2 year warranty they pick up the rest. Owner is fully covered for the 20 years. Is a two-year warranty by us okay?
RESPONSE #8:
You must provide a 5-year workmanship warranty and a 20-year NDL Manufacturer’s warranty covering material and labor.
QUESTION #9:
Will the cameras be removed by owner as needed?
RESPONSE #9:
The security cameras will be removed and remounted by others. Roofers do not have to do anything with them.
QUESTION #10:
Please locate lightning protection on the roof plan.
RESPONSE #10:
Lightning protection will not be added to the plan but we are willing to meet with any contactors that would like to revisit the site to visually inspect the system.
This Addendum to the above referenced project shall become a part of the Contract Documents and shall be binding in all respects.
Information contained in this Addendum shall supersede any information presented in the Contract Documents.
The bidders shall permanently affix this Addendum to the Contract Documents and Specifications so it will be turned in with the bid.
The undersigned bidder acknowledges receipt of this Addendum No. Four.
Received by:
Firm Name:
Address:
Date:
Phone:
END OF ADDENDUM