Addendum No. 3.pdf
PDF 137 KB Posted
- Attached to
- IFB-2024-W-003 TP1 Roof Replacement
- Solicitation number
- IFB-2024-W-003
- Issued by
- Pueblo County, Pueblo City, Colorado
About this file
Addendum No. Three for Invitation for Bid (IFB) 2024-W-003 is issued by Pueblo Water Metropolitan District (PWMD) for a TP1 Roof Replacement project. The addendum extends the final posting of applicable addenda until April 30, 2024 at 3:00 p.m., and modifies the bid due date and bid opening date to May 8, 2024 at 2:00 p.m. and 2:01 p.m. respectively, with the virtual bid opening call-in information remaining unchanged. The project involves comprehensive roof replacement, including demolition of existing Modified Bitumen roofing, installation of a new TPO Mechanically Attached Roofing System, replacement of roof flashings, and associated roofing accessories.
The project requires a contractor to provide all labor, supervision, equipment, and materials, with specific technical requirements including installation of fire-treated wood blocking, insulation, cover board, and TPO membrane. The scope includes electrical work coordination, lightning protection system removal and reinstallation, and specific detailed requirements for roof areas, gutters, and communication mast support. The contractor must provide a 5-year workmanship warranty and a 20-year NDL Manufacturer's warranty covering material and labor. Bidders are required to permanently affix this addendum to their contract documents and specifications when submitting their bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 2.pdf | ||
| IFB-2024-W-003 TP1 Roof Replacement.pdf | ||
| Addendum No. 4.pdf | ||
| Addendum No. 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. THREE
IFB 2024-W-003
TP1 Roof Replacement
APRIL 26, 2024
PWMD Changes noted below:
We are extending the final posting of applicable addenda until April 30, 2024 until 3:00 p.m.
We are also extending the bid due date to May 8, 2024 at 2:00 p.m., along with the bid opening date to May 8, 2024 at 2:01 p.m. The virtual bid opening call-in information will remain the same.
(Rest of page intentionally left blank)
This Addendum to the above referenced project shall become a part of the Contract Documents and shall be binding in all respects.
Information contained in this Addendum shall supersede any information presented in the Contract Documents.
The bidders shall permanently affix this Addendum to the Contract Documents and Specifications so it will be turned in with the bid.
The undersigned bidder acknowledges receipt of this Addendum No. Three.
Received by:
Firm Name:
Address:
Date:
Phone:
END OF ADDENDUM
File details come from the government source that posted it. Updated .