Addendum No. 2.pdf
PDF 1 MB Posted
- Attached to
- IFB-2024-W-003 TP1 Roof Replacement
- Solicitation number
- IFB-2024-W-003
- Issued by
- Pueblo County, Pueblo City, Colorado
About this file
Addendum No. 2 is issued for Invitation for Bid (IFB) 2024-W-003 for a TP1 Roof Replacement project by Pueblo Water Municipal District (PWMD) in Colorado. The addendum modifies Section 1.15 of the original bid documents to specify that the roof shall be designed to resist wind uplift of 115 mph per Pueblo Regional Building Department's criteria. The project involves comprehensive roof renovation, including demolition of existing modified bitumen roofing, installation of a new TPO Mechanically Attached Roofing System with RhinoBond TPO Welding Plates, and associated roofing accessories across multiple roof areas.
The project requires detailed technical specifications, including installing fire-treated wood blocking, EPS flute filler insulation, cover board, and a 060 mil white TPO membrane system. The contractor must provide a 5-year workmanship warranty and a 20-year NDL Manufacturer's warranty covering materials and labor. Additional requirements include coordination with an electrician for electrical work, careful handling of existing lightning protection systems, and daily clean-up of project debris. The addendum provides photographic documentation of the existing roof conditions and installation details, which will help bidders understand the scope and complexity of the roof replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB-2024-W-003 TP1 Roof Replacement.pdf | ||
| Addendum No. 4.pdf | ||
| Addendum No. 1.pdf | ||
| Addendum No. 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. TWO
IFB 2024-W-003
TP1 Roof Replacement
APRIL 26, 2024
PWMD Changes noted below:
Section 1.15 Warranty shall be modified to include: "Roof shall be designed to resist a wind uplift of 115 mph per Pueblo Regional Building Department's criteria."
Please see the photos attached on the next page:
(Rest of page intentionally left blank)
This Addendum to the above referenced project shall become a part of the Contract Documents and shall be binding in all respects.
Information contained in this Addendum shall supersede any information presented in the Contract Documents.
The bidders shall permanently affix this Addendum to the Contract Documents and Specifications so it will be turned in with the bid.
The undersigned bidder acknowledges receipt of this Addendum No. TWO.
Received by:
Firm Name:
Address:
Date:
Phone:
END OF ADDENDUM
| TP1 Roof Photos.pdf |
| IMG_0055 |
| IMG_0056 |
| IMG_0057 |
| IMG_0058 |
| IMG_0059 |
| IMG_0060 |
| IMG_0061 |
| IMG_0062 |
| IMG_0063 |
| IMG_0064 |
| IMG_0065 |
| IMG_0066 |
| IMG_0067 |
| IMG_0068 |
| IMG_0069 |
| IMG_0070 |
| IMG_0071 |
| IMG_0072 |
| IMG_0073 |
| IMG_0074 |
| IMG_0075 |
| IMG_0076 |
| IMG_0077 |
| IMG_0078 |
| IMG_0079 |
| IMG_0080 |
| IMG_0081 |
| IMG_0082 |
File details come from the government source that posted it. Updated .