About this file

This Addendum No. 1 to the bid documents is issued by San Bernardino County's Project and Facilities Management Department for the Mojave River Forks Regional Park Restroom Replacement Project located at 17891 CA-173, Hesperia, California. The addendum modifies the original bid solicitation for the demolition of three existing restroom structures and construction of three new prefabricated restroom and shower buildings equipped with ADA-compliant pathways, utility connections, and site restoration work. The addendum establishes two mandatory job walk dates: January 27, 2026, at 10:00 a.m. and an additional mandatory job walk on February 5, 2026, at 11:00 a.m. at the project site. Bidders must attend and sign in at one of these job walks to maintain bid responsiveness. The Request for Information (RFI) deadline has been moved to 4:00 p.m. on February 18, 2026. Sealed bids remain due by 1:00 p.m. on March 4, 2026. The project contract performance period is 200 calendar days from the Notice to Proceed, with liquidated damages assessed at $1,500 per day for delays.

The project construction estimate is $2,307,500, with contract award granted to the lowest responsive and responsible bidder. Bidders must submit a 10% bid security and comply with California prevailing wage requirements established by the California Department of Industrial Relations for San Bernardino County. Successful bidders must furnish both a Performance Bond and Labor and Material Payment Bond, each equal to 100% of the contract price, within ten calendar days of award. Bidders must possess a California State Contractor's Class B License and specialty licenses in Mechanical (C-20), Electrical (C-10), and Plumbing (C-36) trades, or provide qualified subcontractors. Insurance requirements include General Liability and Auto Liability coverage with limits of $3,000,000 per occurrence, Workers' Compensation, and Course of Construction Builder's Risk insurance. The project is subject to asbestos and lead-based paint abatement requirements, with certified abatement contractors required to remove identified hazardous materials prior to demolition.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: 10.10.1657 – Mojave River Forks - Restroom Replacement Page 1 of 2

Project No. 10.10.1657

ADDENDUM NO. 01

TO THE BID DOCUMENTS FOR THE

MOJAVE RIVERFORKS REGIONAL PARK

RESTROOM REPLACEMENT PROJECT

AT

17891 CA-173,

HESPERIA, CA 92345

The following changes and/or additions shall be made to the plans and/or specifications. All other requirements of the contract documents shall remain the same. The Bidder shall acknowledge receipt of the addendum by inserting its number and date in the Bid Proposal.

It is the Bidder’s responsibility to review all Construction Documents including plans, addenda, and specifications. All content in the Construction Documents supersedes any verbal information.

Change to RFI Deadline: :

All questions must be submitted no later than 4:00 P.M. February 18, 2026.

Additional Job Walk Opportunity:

An additional mandatory job walk opportunity will be held on February 5, 2026 at 11:00 a.m. at 17891 CA-173, Hesperia, CA 92345.

Attendance is mandatory only for bidders that did not attend and sign-in during the mandatory job walk held on January 27, 2026. Any firm that intends to submit a bid must attend and be listed on the sign-in sheet for either the January 27, 2026 mandatory job walk, or the February 5, 2026 mandatory job walk.

Failure to sign-in on the mandatory job walk sign-in sheet (from either date) may result in the bid being deemed non-responsive.

End of Addendum No. 1

Sarah Riley, Chief of Project Management Project and Facilities Management Department, Project Management

Project No.: 10.10.1657 – Mojave River Forks - Restroom Replacement Page 2 of 2

San Bernardino County Project and Facilities Management Department, Project Management 620 South E Street San Bernardino, CA 92415-0184 https://pfm.sbcounty.gov/

DATE: January 29, 2026 https://pfm.sbcounty.gov/

File details come from the government source that posted it. Updated .